|
Resume alert |
Resumes 1 - 10 of 50 |
Singapore, Central Singapore Community Development
... Duties and Responsibilities -Oversee the 3X15 MW Steam Turbine Generator and associated Generator Protection system in the power plant. -Manage maintenance of 2X20 MVA, 110/6.6kv Power transformer, and 5 x 2MVA 6.6KV/415V unit auxiliary Transformer. ...
- Apr 26
Singapore, Central Singapore Community Development
... Installation & alignment, Inspection for Static & rotating equipment - tower, vessel, drum, heat exchanger, Transformers, Centrifugal pumps, canned pumps, agitator, metering pump, vertical pump, turbine & tray for tower. Pre commissioning activities ...
- Mar 02
Singapore, Central Singapore Community Development
... -- JFE ENG Commissioning Dcs/Ptw coordinator Waste to Energy plant Testing of dcs valve/tanks controls Testing of steam turbine Heat and electronic trend analysis Issue relevant permits Attach RA or JSA Attach Location diagram Jan 18 – Jun 18 – BW ...
- 2023 Dec 07
Singapore, Central Singapore Community Development
... (ATLAS COPCO ZR315) system Maintenance &Troubleshooting Flow Meters Orifice Type D/P Txr, Annubar, Venture tube, Vortex Flow Meter (Prowirl 72 & 71), Mass Flow Meters (Micro motion), and Magnetic Flow Meter (Promag 200), Turbine Flow meter. ...
- 2023 Sep 26
Singapore, Central Singapore Community Development
... Experienced in high-pressure 3 phase separator and high-pressure gas compression unit with GTC (Gas Turbine Compressor). Experienced in GE Gas Turbine and Solar Gas Turbine operations. Experience in Condensate dehydration system with condensate ...
- 2023 Aug 25
Singapore, Central, Singapore
... TURNER, 12/2000 to 04/2001 Nature Of Work Boiler, Gas and Turbine, Power Transmission System, Generators, Heat Exchangers components manufacturing utilizing Vertical Turret Lathe, Lathe, CNC Turning, Radial Drilling Machines (Heavy Duty machineries) ...
- 2022 May 11
Singapore, Central, Singapore
... Planning Engineer Keppel FELS Ltd./PPSPL, SGP Project: Ningaloo Vision FPSO Conversion: Tanker Conversion & Life Extension, Integration of Process, Gas Compressor, Turbine Generator, Powerhouse, Water Injection, Chemical Injection, & Produced Water ...
- 2021 Apr 21
Singapore, South East, 458470, Singapore
... The Technical Passport involves technical information of various parts (mainly Compressor, Combustor and turbine), instruments and certification of that particular engine. Collecting various technical data and control system parameter of specific LM ...
- 2021 Feb 08
Singapore, North, 758735, Singapore
... PROJECT: Mini Project: Design and Fabrication of Horizontal Wind Turbine. Main Project: Fabrication of External Kit For Airbag Endorsement. AREA OF INTEREST: Quality Control Manufacturing Technology Production and maintenance SKILL SETS: ...
- 2021 Feb 04
Johor Bahru, Johor, Malaysia
... Black Hawk Resources Malaysia Graduation Date: 27 April 2014 Level: Certificate MLVK LEVEL 3 Field of Study: Aeroplane, Turbine 1 & Turbine 2 Name of Institute: Advance Aeronautics Training Centre (AATC), Ipoh Graduation Date: February 2011 RESUME ...
- 2021 Jan 25