Post Job Free

Transformer or Mech resumes in Ashburn, VA, 20149

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 81 - 90 of 117

Thermal Power Engineering

Chevy Chase, MD
... BHARATH HEAVY ELECTRICAL LIMITED, TRICHY, INDIA (MAY –JUNE 2009) - Worked with a step down transformer (11KV/5000V) installation team. The transformer supplied power to a pipe bending machine used in constructing thermal power plants. ACADEMIC ... - 2014 Sep 27

Sales Manager Objective

Ashburn, VA
... Transformer Testing . Meter Stalling : Single Phas, 3 Phas, . OCB, VCB Testing . MRI Reading Personal Profile:- Father' s Name : Sh. Hariom Singh Date of Birth ; 10th Feb. 1986 Sex : Male Nationality : Indian Marital Status : Unmarried Declaration:- ... - 2014 Sep 23

Engineering Engineer

Ashburn, VA
... To utilize and grow my analytical, research and technical skills in Administration Education Qualification Institute Board / University Year % marks / CGPA B.E-Mech Annai Vailankanni College of Engineering Anna University of Technology (2010-2014) 7 ... - 2014 Sep 14

Mechanical Engg

Washington, DC
... Mark S.S.C G.S &H.E.B Ghandhinagar March -2010 69.85% SPI: 7.54 Diploma Mech. G.T.U. JUN - 2013 Engg. CGPA: Declation: I have declared that all information given is true to best my knowledge and belief. Place :Ankleshwar Your Faithfully, PathanRamiz - 2014 Sep 07

Engineering Mechanical

Herndon, VA
... Manimekalai university- 2014 82.6/ (B.E-MECH) Language : English, Tamil, college of chennai. 8.061 Urdu, Hindi. engineering. 12 TH Mazharul Uloom State board. 2010 76 ADDRESS : Higher Secondary School 10 TH S/O,KAREEM.A, Anaikar Oriental State board ... - 2014 Aug 26

Pvt Ltd Mechanical Engineering

Ashburn, VA
... (Mech. Engg.) MUMBAI University (7th sem.) Engineering, Kankavli. Shri Shahu Junior H.S.C. (Science) KOLHAPUR Board 65.66% College Kagal. Shri mahalaxmi High S.S.C. KOLHAPUR Board 82.15% school, .Kenvade. Technical Exposure: Programming Languages ... - 2014 Aug 01

Electrical Project

Ashburn, VA
... Current Status: Completed 3yrs course on Electrical & Electronics Engineering Final Year Diploma student Academic Project Project1: Welding Transformer With New Technology DESCRIPTION: We have completed this project as that it will require very less ... - 2014 Jul 23

Training School

Ashburn, VA
... • Operational areas are 10 and 15 ton magnet Crane, 25 and 35 Crane, CCM, 10 and 15 ton Furnace, Inductotherm panel, Electrotherm panel, 4800 KVA and 6.9 MVA Transformer, 625 KVA DG, DOL and RDOL Starter, Star Delta Starter. TRAINING • One month ... - 2014 Jun 24

Engineering Assistant/technician

Washington, DC
... from machine tool and die shops, metal plating, painting, silk-screening, coil winding, vacuum impregnation, die cutting, printed circuit board manufacturing, printed circuit board stuffing, custom transformer manufacturers, vacuum molding, etc. ... - 2014 Jun 18

Mechanical Engineer Project

Washington, DC
... COURSE INSTITUTION/ SCHOOL UNIVERSITY/ AGGREGATE/CG YEAR OF BOARD PA PASSING BE.MECH VSA Educational And Anna University 7.0% CGPA 2014 Charitable Trust Group Up to 7th Of Institutions sem DIPLOMA SRG Polytechnic College, Directorate of (DME) Salem ... - 2014 Jun 10
Previous 6 7 8 9 10 11 12 Next