Eugene D. Buck
**** **** **** **** ***** Gardens, FL 33418
H 561-***-**** Email: ****.*******@*****.***
JOB OBJECTIVE
To obtain a position as a Production Control Coordinator/Material Manager using my 25 years of experience in material control.
Summary of Qualifications:
Highly self motivated, extremely disciplined and thorough. Well organized with excellent attention to detail. Outstanding interpersonal skills and communication skills. Able to multi-task efficiently and effectively. Excellent time management skills with the ability to prioritize and excel under pressure.
PROFESSIONAL EXPERIENCE
Production Control Coordinator, Pratt & Whitney, West Palm Beach, FL, 1997 to 2009
•Key contributor to support NASA Space Shuttle Program through development of master schedules for the production and overhaul and repair programs that were used by several manufacturing support groups to ensure 100% mission success.
•Ability to develop work- a- rounds for competing resources for multiple programs enabling all customer commitments to be met.
•Prioritized and coordinated other space programs within various manufacturing support groups enabling them to maintain 100% on time delivery.
•Developed several effective methods for material tracking utilized by numerous manufacturing support groups to communicate progress and maintain schedules for materials.
•Received special Stock Option Award that supported a quality stock sweep investigation that took over 1 year to complete.
SSME Production Scheduler, CDI Corporation (Pratt & Whitney), Palm Beach Gardens, FL,
•Functioned as master scheduler for the final phases of the Space Shuttle Main Engine production program supporting 100% mission success.
•Key contributor in effectively communicating the customer requirements to the various manufacturing support groups on a daily basis that were changing constantly.
Expeditor, Pratt & Whitney, West Palm Beach, FL
•Responsible for expediting military jet engine hardware through the manufacturing process to meet assembly requirements.
•Required effective communication with various support groups to resolve any producibility issues.
Production Control Coordinator, Lenzar Optics, West Palm Beach, FL, 1983-1984
•Responsible for creating and scheduling work orders through the manufacturing process.
•Created material pull lists to build various products.
•Assisted purchasing department in contacting various vendors as to the latest status of material that was to be supplied to ensure on time delivery.
Warehouse Supervisor/Production Supervisor, RAF Co. (Electronics Manufacturer), West Palm Beach, FL, 1980-1983
•Initially hired as Warehouse Supervisor to set up and maintain a complete inventory system. Set up included establishing all procedures beginning with the receipt of material through the entire manufacturing process until shipping. Improved inventory accuracy to 100%.
•Promoted to Production Supervisor for approximately 40 employees.
•As Production Supervisor redesigned the entire manufacturing process reducing manufacturing costs by 35% enabling company to retain a valued customer.
Production Control Coordinator, Eastman Kodak, Rochester, NY, 1975-1979
•Responsible for servicing production lines of approximately 200 employees to build four different models of instant cameras.
•Maintained production efficiency by ordering materials that were required on a daily basis.
•Maintained ten day shortage list when material reached a critical point impacting production.
•Monitored status of materials and attended meetings with engineers, supervisors and purchasing department on a daily basis to identify production issues to ensure on time delivery of material.
TECHNICAL EXPERTISE
SAP
Microsoft Project
Microsoft Excel
Microsoft Word
EDUCATION
A.S. Degree Liberal Arts, Monroe Community College