Post Job Free
Sign in

Project Manager Engineer

Location:
Stafford, TX, 77031
Salary:
Negotiable
Posted:
June 20, 2011

Contact this candidate

Resume:

Resume

TREVOR BANKS MEP Engineer ***** Gainsborough Drive Tel: 281-***-****

Houston TX 77031 Cell: 281-***-****

Email: *********@*******.***

Career Profile

My role is as Mechanical Engineer/Mechanical Superintendent with experience in commercial, industrial, power and transportation related projects. I have experience in manufacturing facilities, tunnels, communication towers, airport facilities

and chemical plant fit-out projects. Specialized skills include on site design, start-up and commissioning of HVAC systems, management and supervision of air conditioning/ductwork and plumbing installation, fabrication and erection of all pipework, installation of pumps and ancillary equipment, PPM and computerized Maintenance Systems (BMS), fire protection services, LV electrical, data, telecom, audio visual, and interior fit-out.

Project Experience:

• HCL Group, One Wood Brook Place Towers, St. James, Trinidad and Tobago, West Indies

• 06/12/2010 – 12/20/2010

MEP Project Manager overseeing all MEP finishing activities including manpower, design changes and Operation & Maintenance documents. This project was a multi purpose complex consisting of three towers of 23, 18 and 16 stories, respectively, for a total of 419 condominium units. The towers were connected by 5 storey buildings housing a business center, an auditorium, boutiques and entertainment facilities

• Dormitory Authority of the State of New York, Medgar Evers College, Brooklyn NY

• 09/01/2007 – 06/01/2010

MEP Engineer, responsible for managing pre-construction activities, soliciting and collecting pre-

Construction documents, coordinating daily construction activities, and monitoring and updating project

Schedules for the MEP trades; assessing delays against the responsible contractor. Provided management

and supervision of MEP subcontractor pre-commissioning activities to ensure that all equipment and

Systems are properly completed and ready for the commissioning process. Acts as liaison between MEP subcontractors and Commissioning Consultant to execute any changes, adjustments, etc. needed to

Complete the commissioning process. Also responsible for issuing prompt written directives stopping work

In areas of non-compliance, reviewing MEP contractors’ request for payment and soliciting and collecting

Close-out documents.

• Soyak International, Moscow, Russia

• 02/01/2006 – 03/31/2007

MEP Manager for new 71-story mixed-use project that included office, retail and a new hotel.

Responsible for all mechanical and electrical contracting oversight of the shell & core, and design

and build of the full $450 million complex. $158 million of the project was allocated to MEP systems

including HV/I-V, UPS, IT/DATA/AV, BMS, HVAC, Plumbing, Fire Protection and Safety. Managed

the start-up/commissioning for the entire project.

• Mercury International, Morocco

• 11/31/2004 – 12/20/2005

Senior Mechanical Engineer/Commissioning Agent for new $150 million factory installation. Responsible

For design, construction supervision and start-up of all MEP systems.

• K. G. Wilson Consultants, Tanzania

• 06/01/2003 – 08/31/2004

As MEP Engineer, served as a contracted consultant to the Bank of Tanzania for a new $220 million

twin 14-story office complex. Responsible for ensuring contractors adhered to standards and

specifications; completed all inspections, testing and monitored all MEP installation services; and

responsible for the site safety implementation. $105 million of the project was allocated to MEP systems.

● SCDL, Antigua, West Indies

07/31/2002 – 04/31/2003

Served as MEP Consultant for a new $85 million mixed-used commercial/condominium project

Supervised design submittals of MEP contractors, monitored bidding for the commercial and

Residential components of the project. Developed specifications and all operation and maintenance

Manuals. $23M of the project was allocated to MEP systems and the project was completed one month early

.

● Canary Wharf Contractors, London, UK

06/01/1995 – 12/16/2000

M&E Construction Manager providing cost management services to comply with client

requirements, managed fit-outs for high-rise offices and condominium buildings within the Canary

Wharf Estate. Served as full liaison from design concept to completion of installation works, inclusive

of inspections and commissioning. Oversaw contractors, logistics, procurement, specifications, method

statements and programs. Project included: $720 million 42-story tower, $342 million allocated to MEP

Systems; $540 million 36-story tower, $198 million allocated to MEP systems; $110 million 22-story

Tower, $48 million allocated to MEP systems.

• Nesma Emcor, Jubail, Saudi Arabia

• 03/31/93 – 03/31/1995

Mechanical Superintendent, had full responsibility for the installation of HVAC Engineering works

Within three buildings totaling 250,000 square meters for the Royal Saudi Naval Forces.

Supervised all TCN staff for programming, histograms, and purchasing and on-sight design changes. He also had responsibility for a second project overseeing all HVAC and MEP installation at various hotels and resorts. Projects included: $500 million 30-story hotel, $280 million allocated for MEP systems; $25 million 14-story condominium, $8 million allocated to MEP systems.

• WSP Consultants, Europe

• 11/26/1991 – 12/15/1992

European Project Consultant, monitored the installation of cellular transmission nodes, Electrical, HVAC,

Mechanical, sanitary and automatic fire control systems throughout Belgium and Holland. Project

Totals of $96 million included $38 million allocated to MEP systems.

• Heathrow Express, PLC, Heathrow Airport, London, UK

• 07/01/1989 – 08/01/1991

Mechanical Engineer overseeing installation of all services relating to HVAC, air extraction, walking

platforms and fire mains with pumping stations. Mr. Banks also monitored risk assessments, method

statements and safety. Also provided MEP system project management of 11 km of tunneling project

to Heathrow Airport. Project costs totaled $72 million.

• Darwin Instruments, LTD, Libya

• 05/01/1988 – 05/31/1989

Site Project Manager for $18 million Polyethylene/Polypropylene Laboratory.

Responsible for all installation, costing, estimating, scheduling & budget control for the purchasing

of mechanical and electrical equipment. Managed the design of M&E works plus 0&Ms and

As-Built drawings upon completion. $4 million was allocated to MEP systems.

• London Underground, London, UK

• 03/10/1986 – 03/19/1988

Site Engineer evaluating pump and drainage systems within the underground network, supervised

Construction and fabrication works, ensured safety regulations were met and prepared site reports.

oversaw costing and estimation of change orders and approved pay requests. Project

Construction cost was $300 million, with $115 million of underground services.

• FHP Consultants, London, UK

• 01/01/1984 – 01/30/1986

Owners’ Representative overseeing six blue chip projects, planned maintenance program of

the completed buildings and the commissioning of the central plant. Oversaw

design changes and managed M&E subcontractor installation and ensured standards and

specifications were met as required. Project cost was $150 million.

• Drake & Skull, London, UK

• 01/12/1979 – 12/24/1983

Mechanical Engineer for three M&E projects in the London vicinity. Managed all subcontractors

and purchasing, program and histograms. Also responsible for design changes and onsite

specifications.

Previous work projects on request.

Education:

School diplomas Maths/Geography/Technical Drawing

5 year Apprenticed Plumber

Post Apprentice Diploma

Higher National Certificate (Mechanical Services)

BSc (Hons) Mechanical Engineering

10 Hour OSHA

Computer skills: Word –Word, Excel etc



Contact this candidate