Post Job Free
Sign in

Project Engineer

Location:
United States
Posted:
June 23, 2012

Contact this candidate

Resume:

MUHAMMAD ADEEL

Mobile#: +923**-*******(Pakistan)

+968-******** (Oman)

***********@*****.*** A-247, block ‘H’ North Nazimabad

Karachi (92-021-*******)

Date of Birth 26 Aug 1982

SUMMARY OF EXPERIENCE:

7 years Experience in Process design engineering, sizing and rating of process equipments and units related to Oil and Gas industry. Worked on basic and detail engineering projects. Currently working in Oman.

WORK EXPERIENCE:

VEC Oil and Gas Consultants Oman

(15th Jan 2011 onwards)

Designation: Senior Process Engineer

PROJECT: SAFAH Flare Up gradation Project

Client: Occidental Of Oman

Project consists of validation of existing relief and blowdown system, hookup of new equipments Relief with existing system and installation of new Flare header, KO Drum and Stack.

Responsibilities:

• Development of Flare system sketch using Visio

• Data collection from site , Vendor documents ,equipments/instruments Datasheets

• Development of HYSYS Model of existing Plant

• Validation of existing PSV’s

• Development of PSVs and BDVs Load List

• Scenario Generation

• Modeling of flare system using flarenet 2006.5

• Identification of bottlenecks.

• Proposed solutions/Debottlenecking

• Hook up of New Equipments Relief Valves

• Sizing of New header KO Drum and Stack

• Report writing

Designation: Senior Process Engineer

PROJECT: Marmul Chemical Injection Project (EPC Project)

Client: Petroleum Development Oman

Project consists of up gradation and installation new Chemical injection skids, IGF Test Unit and Walnutshell Filter Test Unit installation at Marmul.

Responsibilities:

• Basis for Design

• Development of PFD/PFS

• Development of P&ID/PEFS

• Preparation of Cause and Effect

• Validation of existing control valves.

• Preparation of Operation, safeguarding and control Philosophy.

• Hydraulics calculation and Report Writting

• Site Visit for Data collection

• Support to other discipline

PROJECT: Wadi Latham Flare System Debottlenecking Study

Client: Occidental Of Oman

Project consists of determination of current capacity of the Wadi Latham facility flares system and debottleneck it for the increased production and addition of new equipments.

Responsibilities:

• Development of Flare system sketch using Visio

• Data collection from site , Vendor documents ,equipments/instruments Datasheets

• PSV Sizing/Rating

• Development of PSVs and BDVs Load List

• Scenario Generation

• Modeling of flare system using flarenet 2006.5

• Identification of bottlenecks.

• Proposed solutions/Debottlenecking

• Report writing

JGC-DESCON: (March 2008 to Jan2011)

JGC-DESCON is a leading EPC services company having JGC trained staff.

Designation: Process Engineer

JGC is running the design house for BP Pakistan Exploration and Production inc. As a Process/Facility Design Engineer my responsibilities includes Process simulation, Process design ,Equipment design, utilities Estimation, Engineering calculations, Man hour Estimation, Manage the available resources, Communication with client, Basic and detail engineering ,Site visits for data collection, coordination with other disciplines both internally and with client , review BPP Engineering Practices and apply on projects.

Completed the following Projects for BP Pakistan Exploration and Production Inc.

PROJECT: Bukhari Deep-4 Wellhead Development

Project consist of well head development ,hook up of wellhead Flow line with Facility and study the operational scenarios and removal of Bottlenecks at new conditions and Flows.

Responsibilities:

PFD Updation

P&ID Preparation

C&E Preparation

RO sizing

Control valve sizing and Rating

C&E Preparation

Preparation of Datasheets.

Study of Operating scenarios.

PROJECT: Facilities As Built leading To HAZOP Studies

Project consist of

* As Built of Bukharai and Mazari Facilities.

* HAZOP study as Facility Design Engineer

PROJECT: Simulate the LPG Plant based on actual condition

In this project client intent was to simulate the plant based on the current operating data, I was responsible for:

• Data collection from site.

• Simulating de-ethanizer and debutanizer units based on the actual conditions.

• Studying the differences between the actual condition and simulation.

PROJECT: Umer Flare Upgradation Project

The work includes detailed engineering, for flare system:

• Vertical flare stack sizing and procurement specifications, components selection and Ignition system specifications

• Flare header evaluation (mach number / velocity limits check), suggest upsize if any portion is limiting.

• Flash back prevention system.

• Flame supervision (i.e. monitoring and pilot auto ignition) specifications.

• Purge system specifications and engineering (P&ID, piping etc.)

• Development of flare knock out drum procurement specifications and engineering package (P&IDs, piping etc.), complete with liquid disposal pumping.

• Evaluate an existing spare KOD for re use.

• Flare siting (plot plan development) with consideration specified in BP Engineering Technical Practices(considering sterilization zones and radiation effects)

• Liquid disposal system (pits etc)

• Design compliance with API as well as BP ETPs and standards

.PROJECT: De-bottlenecking of Tangri Gas Handling Facility

The work includes detailed Engineering of De-bottlenecking of Tangri Facility. Facility consists of Inlet separation unit, Gas Compression Unit, Gas treatment Unit (Dehydration and Sweetening Units), condensate stabilization unit.

PROJECT: Unmanning of Facilities.

The work includes detailed Engineering for the smooth UN-MANNED operation of FOUR Facilities. My Responsibilities include Process Study, Risk Analysis, P&ID up gradation, Cause and Effect, Datasheets, HAZOP, Equipment Sizing etc

PROJECT: Flare system Study

The study covers the sizing of PSVs; Hooking of PSVs discharge to atmosphere to Flare system, evaluation of Flare system on new conditions.

PROJECT: Miyun-Ismail Deep Compression Project

Work includes the relocation of Recip. Compressor from Zaur Facility to Miyun Ismail Deep Location.

Responsibilities in the Project

• Development of Process Flow Diagrams

• Development of Piping and Instrumentation Diagrams

• PSV Sizing

• Plant Hydraulics study

• Development of Process datasheets of Equipments

• Pump Sizing

• Identification of Tie-In points for the new Equipments in Existing system

• Cause and Effect Matrix

• Vessels Sizing

• Data collection from site.

• Preparation of Process Data Sheet of Process Equipment

• HAZOP Study

Clough Engineering and Integrated Solutions

(May 2007 to Feb 2008)

Clough is a publicly listed Australian based engineering and construction contractor providing full project lifecycle solutions primarily to the oil and gas industry.

Designation: Junior Process engineer

PROJECT: Kandhkot Field Gas Compression Station Project.

Client: Pakistan Petroleum Limited(PPL)

The work includes detailed design of 2x105 MMSCFD compression trains and the plant utility area.

Responsibilities in the Project

• Development of Process Flow Diagrams

• Development of Piping and Instrumentation Diagrams

• PSV Sizing

• Plant Hydraulics study

• Flare System Sizing

• Development of Process datasheets of Equipments

• Pump Sizing

• RO sizing

• Control Valve sizing through FIRSTVUE

• Cause and Effect Matrix

• Vessels Sizing

• Preparation of Process Data Sheet of Process Equipment

• Review of vender’s supplied items & packages

• HAZOP Study

Petrosin Engineering Pvt Limited

(January 2006 to April 2007)

Position: Trainee Process Engineer

Petrosin is the leading EPCC of Pakistan providing its services in oil and gas sector of the country.

PROJECT: PINDORI LPG PLANT EXPANSION PROJECT PHASE-II.

Client: Pakistan Oil Fields Limited (POL)

Pindori LPG Plant Expansion Phase II includes revamping of Stabilizers, new train of LPG towers (De-ethanizer and Debutanizer), revamping of Compressors, New Hot Oil heater package, new refrigeration package, Instrument Air package and installation of New Propane Generation System.

Responsibilities:

To assist in;

• Process Simulation

• Development of Process Flow Diagram

• Development of Piping & Instrument Diagram

• Control valve sizing and rating of existing valves

• PSV Sizing and Rating

• Plant Hydraulics study

• Heat and Material Balance using HYSYS

• Preparation of Process Data Sheet of Process Equipment

• Thermal Design of Heat Exchanger Using HTFS software.

• Identification of Tie-In points for the new Equipments in Existing system

• Sizing of separator

• Pre-commissioning and Commissioning of LPG Plant, Hot oil package, Refrigeration package

ENGINEERING SOFTWARES:

• HYSYS simulation software.

• PRO II

• KORF Hydraulics.

• Control Valve Sizing Software FIRST-VUE of FISHER.

• SEP-II & SEP-III Two and Three Phase Separator Sizing.

• FLARENET

• HTFS Shell and Tube Heat Exchanger Design.

• HTRI for air cooler

TRAININGS/INTERNSHIPS:

• 6 weeks training at CLARIANT PAKISTAN LIMITED.

(1st position in the final test conducted by CLARIANT).

• 6 weeks internship at PAKISTAN REFINERY LIMITED

(HSE, TECHNICALS, OIL MOVEMENT, PROCESSING, LABORATORY)

• Training for COMMISSIONING OF HOT OIL HEATER

(BONO ENERGIA, ITLY)

Professional Education:

2001-2005 Completed my BS in Chemical Engineering and technology from department of Chemical Technology / Engineering University of Karachi

Got 2nd position in the overall result.



Contact this candidate