NAMES: ADELEYE ADEMOLA ADENIYI
DATE OF BIRTH: *TH OF OCTOBER, 1978
CONTACT ADDRESS: ** ******** ***** ******, ******** CHEVRON CLUB, GBAGADA, LAGOS
CONTACT TELEPHONE & EMAIL ADDRESS: 234*********** & ******@*****.***
PLACE OF ORIGIN: IJUMU LOCAL GOVERNMENT AREA, KOGI STATE
DETAILS OF TERTIARY EDUCATION (1995 – 2001)
• UNIVERSITY OF ILORIN, KWARA STATE, NIGERIA
• B.ENG – ELECTRICAL ENGINEERING (2001), SECOND CLASS
DETAILS OF SECONDARY EDUCATION (1989 - 1995)
• SAINT FINBARR’S COLLEGE, AKOKA, LAGOS.
• SENIOR SCHOOL CERTIFICATE (SSCE)/ GENERAL CERTIFICATE EXAM (GCE)
DETAILS OF PRIMARY EDUCATION (1983 – 1989)
• OLIMO MEMORIAL PRIMARY SCHOOL, ONIKE, LAGOS
• FIRST SCHOOL LEAVING CERTIFICATE
WORK HISTORY / EXPERIENCE
(A) BATELITWIN GLOBAL SERVICES - LEAD ELECTRICAL ENGINEER (MAY, 2011 TO DATE)
PROJECTS AND RESPONSIBILITY:
Total OML 100 Documentation Update and Repairs Planning Project – Project Lead Electrical Engineer (May, 2011 to June, 2012)
Responsibilities includes but not limited to:
Review of client FEED packages, Site visit to Total offshore platforms, Markup of existing electrical deliverables, Preparation of the following : As built deliverables, new electrical deliverables, Hazardous Area Classification Drawings, Management of the Electrical group.
Mobil EAP GO Platform Documentation Update Project – Project Principal Electrical Engineer (April, 2012)
Responsibilities includes but not limited to:
Review of client documents, Site visit to Mobil EAP Platform, Markup of existing electrical deliverables, Preparation of As built deliverables
(B) CAKASA NIGERIA COMPANY LIMITED LAGOS NIGERIA – SENIOR ELECTRICAL ENGINEER (MARCH, 2007 TO MAY, 2011)
PROJECTS AND RESPONSIBILITY:
Total OML 100 ODP1/ODD1 Fire Water Upgrade (Detailed Engineering Design) Project – Project Senior Electrical Engineer (February, 2011 to May, 2011)
Responsibilities includes but not limited to:
Review of FEED packages, Preparation of the following: Electrical Design Basis, Electrical Cable sizing, Calculation Notes, Lighting and Small Power Layout.
Total OML 99 (Aneman/Kpono) Oily Water Treatment Upgrade – Ph1 (Detailed Engineering Design) - Project Senior Electrical Engineer (October, 2010 to May, 2011)
Responsibilities includes but not limited to:
Review of FEED packages, Preparation of the following: Electrical Design Philosophy, Electrical Power/Control Loop Drawing, Typical Installation Standard drawings (earthing, power, lighting, control), Electrical Load List, Electrical Cable List/Schedule, Lighting Datasheet, Pump/Motor Datasheet, Switchboard Elevation Drawings, Electrical Equipment List, Tie-in List, HAZOP meetings, 3D Model/ Layout reviews.
Chevron Dibi Long Term Project – Project Lead/Senior Electrical Engineer (February to August, 2010)
Responsibilities includes but not limited to:
Review of Process PIDs, Client Scope of Works, Preparation of the following: Gap Analysis for the Scope of Works, weekly activity report, Switchgear/MCC Elevation drawings, Datasheets (MCC, Switchgear, LV Induction Motor), Electrical Load List, Electrical Equipment Layout, Review and approval of Hazardous Area Classification Drawings/Details, Review, update and approval of other deliverables, Attendance of Project Meetings, Management of the electrical project team in terms of deadlines, schedule, and deliverables productivity,
Chevron/Eni/Shell/Total/Daewoo/Mobil Proposals - Senior Electrical Engineer (Proposals), February, 2010
Responsibilities includes but not limited to:
Review of Client Scope of Works (Basic/FEED/Detailed Design), Preparation of the following: Cost Time Resources (CTR), Proposal Schedule, Manning plans. Attendance of Proposal Meetings
Chevron Produced Water Disposal Project – Project Senior Electrical Engineer (Nov; 2009 – Feb; 2010)
Responsibilities includes but not limited to:
Preparation of the following: Datasheets (MCC, Switchgear), Electrical Equipment List, Electrical Load List, Review of Process PIDs. Review and update of deliverables
Total Aneman Oily Water Treatment (OWT) Proposal (FEED) - Proposal Manager (November, 2009)
Responsibilities includes but not limited to:
Preparation of the following: Project Execution Plan, Meeting Agenda, Reviewed and updated disciplines Cost Time and Resource (CTRs) and Manning Plans, Collated Disciplines CTRs, Organized and moderated Proposal Meetings.
Chevron Gas Supply Expansion Project (GSEP) Pipeline and Metering Skid Proposal (Detailed Engineering Design) - Proposal Manager (August, 2009)
Responsibilities includes but not limited to:
Preparation of the following: Project Execution Plan, Project Organogram, Meeting Agenda, Reviewed and Updated the following: Minutes of Meetings (MOMs), Manning Plans, discipline Cost Time and Resource (CTRs).Organized and moderated Proposal Meetings,
FEED NAOC Ogbainbiri Facility Upgrade Project, Port Harcourt – Project Principal Electrical (March - June, 2009)
Responsibilities includes but not limited to:
Preparation of the following: Load Flow Studies for different cases, Short Circuit Studies, Time Current Curves for various relays and loads, Relay Schedules for various relays.
Conoil Facility Upgrade Project, Port Harcourt – Project Senior Electrical Engineer (March, 2009)
Responsibilities includes but not limited to:
Preparation of single line diagram and Electrical Load List. Review and update of various deliverables
Benin Petroleum Services Cotonou Depot Project – Project Senior Electrical Engineer (January - March, 2009)
Responsibilities includes but not limited to:
Preparation of Electrical Design Basis, Electrical Cables Specification, Electrical Panels Specification, AC/DC UPS Sizing Calculation, Review and update of deliverables
Chevron’s Escravos Gas Project 3B (EGP3B) – Project Senior Electrical Engineer (September- December, 2008)
Location: Fluor Corporation, 1 Fluor Daniel Drive, Sugar Land, TX 77478-3899 U.S.A
Responsibilities includes but not limited to:
Preparation of the following: Datasheets (MCC, Switchgear, DC Power Supply, Busduct), Electrical Equipment List, Electrical Load List, Electrical Design Final Report, Power system analysis using ETAP, Review and update of Process PIDs and other electrical deliverables
Caslatel Petroleum’s Petroleum Products Loading Depot Project – Project Senior Electrical Engineer (June, 2008)
Responsibilities includes but not limited to:
Review and update of Earthing Layout, Lighting Layout, Single Line Diagrams, Load Schedules.
General Electric NP’s Warehouse Workshop/Offices at NAOC Gas Plant OB OB Project – Project Senior Electrical Engineer (April, 2008)
Responsibilities includes but not limited to:
Preparation of Bill of Quantities
Chase Petroleum’s TEMA Tank Farm Project – Project Senior Electrical Engineer (February – March, 2008)
Responsibilities includes but not limited to:
Preparation of the following: Electrical Design Basis, Low Voltage Switchgear Specification and Electrical Cables Specification. Review and markup of other electrical drawings. This design was based on IEC codes.
Exxon Neftegas Limited’s Odoptu First Stage Production (FSP) Project – Project Senior Electrical Engineer
(October – December, 2007)
Location: Fluor Corporation, 1 Fluor Daniel Drive, Sugar Land, TX 77478-3899 U.S.A
Responsibilities includes but not limited to:
Preparation of the following: Cable Sizing Report, Load flow study/report, Short circuit report, Transient Motor Starting (TMS) report and Time Current Curves using SKM power tools.
Addax Petroleum’s Design of generators synchronizing switchgear systems for Izombe flowstation – Project Senior Electrical Engineer (April – Oct; 2007)
Responsibilities includes but not limited to:
Preparation of the following: datasheets for 480v, 60hz / 415v, 50hz Switchgears, Electrical Design Procedure, Electrical load lists (480v, 60hz / 415v, 50hz systems), Single Line Diagrams, Protection and Metering Diagrams, Switchgear Room Lighting Layout, fault calculations reports
(C) NATIONAL ENGINEERING & TECHNICAL COMPANY LTD. (NETCO), A SUBSIDIARY OF NIGERIA NATIONAL PETROLEUM COOPERATION (NNPC) – ELECTRICAL ENGINEER (MARCH, 2002 – FEBRUARY, 2007)
PROJECTS AND RESPONSIBILITY:
NLNG’s SEVEN PLUS FEED Condensate Stabilization Unit (Unit 2000) - Project Lead/Electrical Engineer (September, 2006 – February, 2007)
Responsibilities includes but not limited to:
Preparation of Electrical Procedure, Hazardous Area Classification Drawings, Electrical Load List, Electrical Cable Routing Sketches, Electrical Aspect of Equipment Data Requisition Sheet (EDRS) based on IP 15 & Shell DEPs. Led/Managed three (3) other engineers for effective completion of project.
Exxon Mobil’s Etim Inim Utue Safety Health and Environment Upgrade Project – Project Electrical Engineer (April 2006 - August 2006)
Upgrade of EIU Platforms field facilities located offshore south of Qua Iboe Terminal (QIT)
Responsibilities includes but not limited to:
Preparation of main EIU cable tray layout, EIU Cable/tray sizing Calculations, EIU main cable and tray schedule (electrical and instrumentation cables), EIU Lighting layouts (normal & emergency), EIU Electrical Demolition plan & drawings based on Mobil MEPs and API. Led/Managed three (3) other Engineers for effective completion of project
Exxon Mobil’s EAST AREA PROJECTS EPC 3 BRT EXPANSION – Project Electrical Engineer (May, 2005 – March, 2006)
Location: JGC Corporation, Yokohama, Japan
Responsibilities includes but not limited to:
Performed the following: SKM Load Flow Analysis, Short Circuit Calculations, Demand Load Study and a host of other analysis, Lighting Design (street/fence lights), Cable Size Selection Table. Reviewed the following: Hazardous Area Classification Drawings, PDS 3D models using smart Plant Review 5.0 (SPR), Preparation of the following: Material Take off and Bill of Quantity, Specific wiring methods and material selection.
Cable Tray Layouts, Vendors Technical Evaluation for Cable tray and accessories, Power control cables, Switchgear and Grounding materials vendors, Updating changes on some Autocad drawings such as oneline diagrams, installation details e.t.c. Checking and marking – up of drawings in compliance with standards and specifications. Visited Doosan, South Korea for Factory Acceptance Test (FAT)
During the project, I led other Pakistani Designers/Engineers
ExxonMobil Qua Iboe Terminal (QIT) Gas Elimination Project (Job 1121) – Project Electrical Engineer (Feb; 2005 – May, 2005)
Responsibilities includes but not limited to:
Preparation of Electrical Layout Plans, Hazardous Area Classification Plans, Electrical Equipment Datasheets and Electrical Cable Schedule
NAOC Okpai – Oluchi Community Electrification Project (Job 1132) – Project Electrical Design Engineer (June 2004 – Sep; 2004)
Responsibilities includes but not limited to:
Preparation of Single line diagram, Poles Plotting Diagrams, Communities HV & LV Power Distribution Diagrams, Equipment Sizing Calculations, Installation Details, MTOs, Datasheet
Chevron Produced Water and Gas Utilization Projects (Jobs 1122 & 1123) - Project Electrical Design Engineer
(Oct; 2003 – Nov; 2003)
Activities include the Preliminary Engineering Design for the handling of the Produced Water and Associated Gas from the Facilities.
Responsibilities includes but not limited to:
Single Line Diagrams, Load List, Material Take-Off, Power System Analysis
Saipem Erha Project - Project Electrical Design Engineer (January 2003 – August 2003)
Responsibilities includes but not limited to:
Preparation of Lighting layout and Power Layouts
NLNG Plus Project. – Project Electrical Design Engineer (June 2002 – June 2003)
Responsibilities includes but not limited to:
Preparation of Lighting Layout, Power Layouts and Earthing Layout
CHEVRON Hot oil Re-Design project – Project Electrical Design Engineer (July 2002 - October 2002)
Responsibilities includes but not limited to:
Preparation of cable schedule, plot plan, earthing layout, cable layout, load summary and lighting layout for hot oil area. Sizing and selection of generator cables for the hot oil area.
(D) NATIONAL ENGINEERING & TECHNICAL COMPANY LTD. (NETCO), A SUBSIDIARY OF NIGERIA NATIONAL PETROLEUM COOPERATION (NNPC) – TRAINEE ENGINEER (MARCH, 2000 – MAY, 2000)
PROJECTS AND RESPONSIBILITY:
Shell Cawthorne Channel Gas Project - Job 1070 – Project Trainee Engineer (March, 2000 - May 2000)
Responsibilities includes but not limited to:
Preparation of single line diagrams, plot plans and earthing layouts using AutoCAD. Preparation of cable schedule and load schedule
Previous work experience
Feb. 1999 - May 1999. Joses Engineering Company Lagos Trainee Electrical Engineer
ACHIEVEMENTS / LEARNING POINTS
Increased work flexibility, communication, leadership and management skills.
Increased interpersonal relation, problem-solving and cost saving skills.
Improved technical skills, and increased team playing roles.
Better HSE awareness, risk assessment, emergency response management and application of Lesson Learnt
TRAINING
Basic Offshore Safety Instruction and Emergency Training (BOSIET) - Falck Prime Atlantic /May (2011),
Facilitated, SKM Power Tools Training -AMEC Electrical Group, NETCO(2010),
Effective Project Management - Rockhurst University, USA (2008),
Facilitated, Short-circuit Analysis (In house) -Cakasa/August (2008),
ISO 9001:2000 QMS Awareness Training -Cakasa /May (2008),
Basic Leadership Program. - Daystar, Lagos (2007),
Introduction to Project Management – Cakasa, Lagos (2007),
General Corrosion Course - Emerson Limited, Lagos. (2006),
ISO 9001:2000 QMS Awareness Training - NETCO, Lagos. (2004),
AutoCAD - NETCO, Lagos. (2002)
PROFESSIONAL MEMBERSHIP
Corporate Member, Nigeria Society of Engineers,
Graduate Member, Nigeria Society of Engineers
AWARD
2nd Overall Best Graduating Student, Olimo Memorial Primary School, Lagos, Nigeria.
HOBBIES and DEVELOPMENT
Reading and Listening to music.
REFERENCES:
To be provided on request.