Post Job Free
Sign in

Power Plant System

Location:
United States
Posted:
April 22, 2012

Contact this candidate

Resume:

RAHUL DEV

Citizenship : Indian Date of birth : ** January 1984

Contact

Tel: +91-989*******,931-***-****

e-mail : **********@*****.**.**

************@*****.***

Address

N. No 853 Sec 15A, Faridabad, Haryana

Profile

Objective To execute challenging work by adapting innovative approaches & work in an amiable environment, where I would have the opportunity to grow professionally through recognition of hard work.

Key Skills: - Power Generation (Synchronization of Power Source) & Distribution concepts and technologies. Proficient or familiar with a vast array of programming languages in Industrial Automation (PLC, SCADA, DCS) & Instrumentation.

Schneider :- PL7 Pro, Unity Pro XL, Vijeo Citect, Vijeo Designer, Twido Suite, Twido Soft, Concept

ABB :- Control Builder, Codesys , AC31 Graf, CP Soft 400, 500

Woodward PG Products: - easYgen 1000, 2000, 3000, SPM-D (Synchronization of DG-DG, DG-Grid, DG-TG, TG-TG, Reverse & forward Synchronization , Load Sharing , Load Management & import & export control of power).

Woodward PD Products:- High Protech ,MFR, Professional Line(Transformer Diff. Protection, Feeder / Generator Protection , Mains Decoupling Protection .)

DEIF PG Products: - AGC-3, AGC-200,GC-1F, (Synchronization of DG-DG, DG-Grid, DG-TG, TG-TG, Reverse & forward Synchronization , Load Sharing , Load Management & import & export control of power).

DEIF PD Products:- GPU , Uni-line , MDR-2 Diff. Protection.

Communication: - Modbus, Modbus TCP/Ip, Ethernet TCP/IP, Modbus Plus, Profibus, Unitelway, Can open, Can open (J1939).

Work Experience

DEIF India Pvt. Ltd, Faridabad Full-time job

Astt. Manager Sales (PG & PD products) 15 June, 2011

Managing a set of existing customer that includes OEM (Original Equipment Manufacturer, Switch Board Builders & deliver YoY growth as per budget.

Responsible for developing new customer targeted by company by introducing the product, conduct demo/trails for approvals & secure rate contracts / order from the customer.

Work with Electrical Consultant & get company product specified in their project tender & follow up the same with electrical contractors / Panel Builder / End customer.

Actively sell to new exciting customers all range of DEIF product including making cold calls.

Developing new channel partner as necessary to maximize product sales.

To coordinate with application team & ensure necessary technical support for customer.

Design & deliver sales presentation to customer at trade show, customer site, office, facilities etc.

Give detailed product training to assist customer on both technical & commercial aspects with timely response.

Woodward Governor India Ltd, Faridabad Full-time job

Sales Support Engineer EPS(Electrical Power System) 2010, January to June 2011

Assist Costumer Account Manager & channel partners with technical proposals of existing products.

Assist costumer with technical products issue.

Provides product technical training to account manager, channel partners & customers.

Provide products & market information to channel partners.

Participates in the development of marketing plan in support of specific products strategies.

Identifies & determine appropriate response to qualified leads from prospective customers.

Participates in competitive market/product analysis.

Provides pre & post sales technical support & training to OEM, Distributer & Integrator.

Support OEM & Integrator on critical system.

Tycon Automation Pvt. Ltd, Noida

Full-time job

Senior Application Engineer (Industrial Automation Projects) 2008,February to December, 2009

Develop PLC & DCS Programme , SCADA Development,

Commissioning of projects at client site.

Documentation of Projects.

Help the design department to develop the control panel design.

Give technical assistance to junior & client.

Sanhit Automation Pvt. Ltd, Gurgaon

Full-time job

Application Engineer (Power Projects) 2007,June to February, 2009

Develop PLC Programme , SCADA Development,

Commissioning of projects at client site.

Documentation of Projects.

Education

Professional Qualification:-

Certification & Training :-

B. Tech in Electronics & Instrumentation (June 2007)

A.B.E.S. Engineering College , Ghaziabad

1. 3 month Industrial Automation certification course in Jan 2007 From M/s Sofcon Automation.

2. 3 Days Training on Vijeo Citect in Schneider.

3. Basic Power Generation & Distribution Training. (Internal Woodward).

4. 4 day advance Power Management Training on easYgen 3500 + LS5 at Woodward Stuttgart, Germany.

5. 4 day advance training on High PRO tech (MV protection Relay) at Woodward Kempen, Germany.

Activities and Interests

Games Computer Games

Books Electrical power Books

Languages

Hindi (native) English (Fluent, Read & Write)

I affirm that particulars given above by me are true and I am solely responsible for its accuracy.

Date:- Rahul Dev

Project Completed for Woodward Governor India Ltd.

A. Steam Turbine Synchronization:- Steam Turbine Synchronization with GRID. 12 MW & 24 MW TG with GRID & Bus coupler synchronization Site:-Dwrikesh Sugar mill Bareily.

B. DG SYNCRONIZATION With GRID:- 3 X 1000 KVA DG synchronization with easYgen 3200 .

Site: - Rimjim Ispat , Kanpur.

C. 6 X 1200 KVA Gas Generator Synchronization System:- 3 X 1200 KVA Goscor Genset + 2 X 1200 KVA Cat Genset + 1 X 1000 KVA Salzar Genset.

Site: -Somany Tiles , Bahadurghar .

D. Transformer Protection & Feeder Protection Relay:- 2 x feeder protection Relay & 1 X transformer relay (11 Kv/ 66 KV) protection system with directional current protection.

Site: Chadda Sugar Mill , Gurdaspur Batala , Punjab

Project Completed for Tycon Automation Pvt. Ltd.

A. DG SYNCRONIZATION: - Two DG of 500kva & 320 kva was synchronization done with Modicon 3721 PLC & DG status & alarm status is shown on MMI XBT-N200

Site:- Uappar Doab Sugar Mill Shamli , Muzaffar Nagar U.P.

B. Hydro Power Plant: - 4*1.56 M.W hydro Power Plant Automation with Schneider Premium PLC. All the Turbine Synchronize With Grid at 3.3 kv & export power to Grid at 66 kv. Runner Blade & Guide Vane Controlling in auto and whole safety control in auto mode. For display and controlling XBT-F was used. Site: - Sategala Power Plant, Sategala, Taluk:- Kolegala, Distt.- Chamraj Nagar, Karnataka.

C. Multi Bed Filter: -Multi bed filter is use for filtering of Sugar .In this Process we Control the six-solenoid valve for ten steps with respect to time, pressure, flow & level. For Flow controlling we use Variable Frequency Drive (VFD). Whole system has control in Auto, Semi Auto & Manual Scheme. Auto & Semi Auto controlling from SCADA & Manual Controlling from panel.

Control System: - Mirano (M340 Schneider), ACS 550 VFD (ABB), Vijeo Citect v7.0.

Site: - Natural Sugar Pvt. Ltd. Rangni, Latur, Maharastra.

D. Batch Pan Automation:-In Batch Pan Automation we control the Brix mixing with respect to the level of tank. This system has two sections, 1. Boling 2. Graining that section is selectable by operator. For controlling of each section there is five level of controlling for PID. By this PID we control the control valve of Brix. Whole controlling was on SCADA & Display.

Control System: - Quantum (Level 2 Processor Schneider), Vijeo Citect v6.1, Display XBT-GT 4230.

Site: -Titawi Sugar Mill (Unit of Mawana Sugar),

E. Steam Turbine (Retrofit): - 2*500 Kw Steam Turbine control system. In this system all protection is take care by PLC control system. All protection & system status is display on MMI.

Control System: - Premium PLC (Schneider), MMI XBT-GT 2220

Site: - Raj Rani Rice Mill Pvt. Ltd. Vasantpur Kolkatta.

F. FCS & SCS Automation: - In FCS & SCS we control the flow & temperature of Filtrate & Syrup with respect to the tank level & according to that flow we control the tree type of dosing (Phosphoric Acid, Flocculent & Lime Secret). In this system we also control the Ph of sugar syrup with respect to the flow of syrup & the error value of Ph. Control System: - Mirano (M340 Schneider), 8* ACS 550 VFD (ABB), XBT N-401 Site: - Parle Sugar Ltd. Behraich, U.P.

G. Gas Generator Controlling PLC System :- In gas generator(Schmitt Enertec Germany) controlling System we Control the start stop sequence, Temperature controlling, alarming of all system like as all pressure, temperature, speed & electrical parameter.

Client: - Shiva Gensets Pvt. Ltd.

End user / Site :-Sun Glass Firozabad, Okay Glass Firozabad, Durgesh Glass Firozabad, Firozabad Glass & Shell Industries Firozabad, Paras Glass Agra.

H. Steam Turbine synchronization with grid : - 750 Kw Steam Turbine synchronization system. In this system we control all parameter of turbine & we synchronize the turbine with grid with the PLC & for controlling of speed of turbine we using Woodward 2301A module(governor).All protection is take care by PLC control system. All protection & system status is display on MMI.

Control System: - Merino PLC (Schneider), MMI XBT-GT 2220, Woodward 2301A ,

Site: - The malt company India Pvt. Ltd. ,Gadaipur, Patodi, Gurgaon.

Project Completed for Sanhit Automation Pvt. Ltd.

A. Energy Management System:- Energy Management System contain 24 energy meter enable with Modbus communication .That energy management contains daily report & monthly report & total reading of energy meter on SCADA (I FIX) screen. Site:-Banni Estate Gurgaon.

B. DG SYNCRONIZATION: - 3*500 KVA DG synchronization by Woodword EGCP-2 .That system is fully automatic & enable with load shearing & load management. Site: - EURO BOND PVT. LTD. Jammu.

C. SCADA FOR DG SYNCRONIZATION SYSTEM:-Whole DG parameter is shown on the SCADA (I FIX) screen. DG start & stop by SCADA. DG start in auto & test mode. Which is select by user previously. Real time & Historical Trending of whole parameter.. Site: -TATA Motors Rudrapur.

D. DG SYNCRONIZATION:- 4*625 KVA DG synchronization by Woodword EGCP-2.That system is fully automatic & enable with load shearing & load management. Micro PLC & XBT-GT1100 is also installed with this system for master & slave change, start- stop & all parameter of the whole system is also shown on the MMI screen. Site: - Laopala Industries Sitarganj, Rudrapur.

E. MMI FOR DG SYNCRONIZATION SYSTEM: - All DG parameter is shown on the MMI XBT-GT2220 screen. DG start & stop by MMI. DG start in auto & test mode. Which is select by user previously. Site: - S.Tech, Mohan Corporative.

F. DG SYNCRONIZATION & SCADA:- 2*500+1*1010 KVA DG synchronization by Woodward EGCP-2 & Premium PLC. That system is fully automatic & enable with load shearing & load management & the SCADA (I FIX) system show All DG parameter on computer screen. DG start & stop by SCSDA. DG starts in auto & test mode. Which is select by user previously. Real time & Historical Trending of whole parameter. Site: - Uappal Plaza, Jasola Vihar New Delhi

G. MMI FOR YARN DYING MACHINE:- Programming is load by MMI XBT-GT1100 in Micro PLC. ST & MV Tank level & Temperature is shown on MMI screen. Site: -Vanasthali Textile Ltd., Alwar.

H. SCADA FOR DG SYNCRONIZETION SYSTEM:- Whole DG parameter is shown on the SCADA (I FIX)screen . DG start & stop by SCADA. DG starts in auto & test mode. Which is select by user previously. Load Shedding function is also enabling in that system. Real time & Historical trending of whole parameter. Reports & Alarm are enabling. Site:-IOCPL Barnala, Punjab.

I. DG SYNCRONIZATION:- 3*500 KVA DG synchronization by Woodward GCP-32 .That system is fully automatic & enable with load shearing & load management. Site: - Bharati Telecom, IMT Manesar, Gurgaon.



Contact this candidate