RESUME OF INSTRUMENT TECHNICIAN
Contact no: 009***********
Name : ABDUL NASSER
Academic Education : Secondary School Leaving Certificate (S.S.L.C),
Pre-Degree Course, (P.D.C).
Technical Education : Diploma in Instrumentation From Tirure Govt. Polytechnic
Institute Kerala, India.
Capable of performing the following activities in Instrumentation field:
• Construction Activities
• Inspection & Testing
• Maintenance
• Shut-down Servicing
• Commissioning Activities
• Having good knowledge of plant safety rules & regulations.
• Good knowledge about Permit to work systems (PWS) and several kinds of permits like Cold work permit, Hot work permit, Limited Space Entry permits.
• Familiarity about several kind of Perilous involved in work area and essential safety measure to be done for the safe work.
• Capacity to do job alone by following Safety rules & regulations.
• Good Experience in the Plant Maintenance and Commissions.
• Sound knowledge and good experienced in the management Plant Instrument Maintenance.
• Well-known with the Plant Running, Predictive, Preventive, Breakdown and Corrective Maintenance.
• Experienced in the Boiler Management Systems (BMS).
• Specialist in Installation & Calibration of different types of the Modern Smart Electronics & Pneumatic instrument.
• Skilled in PLC, DCS, ESD Plant Automation Control System.
• Effective knowledge of the Lock Out Tag Out Processes.
• Operational knowledge in a Fire and Gas Systems like HC Detectors & UV, H2S Detectors, Smoke Detectors.
• Sound skills of all kind of Rotating Equipments Maintenance, Gas Turbines, Compressors etc.
• Operational knowledge in a Turbo-tronic Turbine Control System.
• Sound knowledge of the Bently Nevada Vibration Monitor system.
• Able to do a job independently.
• Skilled to read Engineering Drawings, Loop Diagrams, P&ID Drawings, Logic Diagram & Hook up drawings also.
• Skilled in Computer Operations.
Skills in:
• Calibration of Field Instruments
• Installation and commissioning of Field Instruments
• Erection of Control Stations such as DSC,PLC.CCS.VMS
• Configuration, checking and modification of DCS System
• Preventive and breakdown maintenance of process control system
• Troubleshooting and fixing of problems during operation of plant
• Well conversion with drawing and circuits
July09- Dec09 Company : GENERAL ELECTRIC (GE)
Project : MARFIQ- JWAP Al Jubail-ksa
Position : Instrument Technician
Responsibilities involve installation, calibration, and loop checking and commissioning and trouble shooting of Instruments. Coordinate with the principals, and main contractors for the planned jobs and brief them the proceedings. Procuring the work permits and make sure that all the safety procedures are brought in practice.Attending daily jobs allotted by the PDO Supervisor like PM Check, Alarm and Trip Checks and other instrument related jobs coming up every now and then called for by the Operations Department like check and calibrate the instruments for abnormal readings, field calibration of control valves, Check and service fire & gas and smoke detectors,etc. Procurement of work permits and canceling them once the job is completed, coordinating with the area control room operations and field operators while attending the jobs.
Dec08- May09 Company : HYUNDAI ENGINEERING
Project : KURAIS ARAMCO GAS PROJECT-I
Position : Instrument Technician .
Responsibilities included : Calibration of Control Valves, Loop checking DCS and Field, Instrument Calibration (Work shop, Field and Control room), Participated in commissioning activities and start up assistance in instrumentation trouble shooting
Nev 07- Sep 08 Company : SAUDI TOYO ENGINEERING
Project : yansab E/O E/G PROJECT-I
Position : Instrument Technician
Responsibilities included : calibration of newly arrived instruments in lay down and in the field. Leak testing, loop checking, pre-commissioning and commissioning of Equipments instrument Installation inspection check list, control valve calibration record, loop function test record, impulse line pressure test record, orifice plate test record and air supply piping pressure test record. Participated in commissioning activities and start up assistance in instrumentation trouble shooting
May 05- Mar 06 Company : Jubail United Petrochemical Company
Project : UNITED E/O E/G PROJECT-II
Position : Instrument Technician
Responsibilities included : Inspection activities to insure all Instrumentation Construction activities like installation, calibration leak testing, loop checking, pre-commissioning and commissioning of Equipments as per United specifications and SABIC Engineering Standards. such as individual instrument Installation inspection check list, control valve calibration record, loop function test record, impulse line pressure test record, orifice plate test record and air supply piping pressure test record. Participated in commissioning activities and start up assistance in instrumentation trouble shooting
Nov. 04 - Mar.05 Company : Saudi Arabian Kent
Project : YANPET DBN PROJECT
Position : Instrument Technician
Responsibilities included:- Instrument Calibration (work shop, field and control room), loop check and trouble shooting, Instrument installation, Instrument cable termination worked as inst. Tech, responsible for instrument installation, calibration, configuration, and loop checking of different types of process variable transmitters & valves.
Jan 04 - Aug 04 Company : Chiyoda Petrostar
Project : SIPCHEM METHANOL PROJECT
Position : Instrument Technician
Responsibilities included: Instrument Calibration (work shop, field and control room), loop check and troubleshooting, Involved Commissioning and start up assistance for NEVO PIGNONE compressor. Involved in punch killing activities.
Sep 03 - Dec 03 Project : SPC PDH/PP PROJECT SAMSUNG, JUBAIL
Position : Instrument Technician
Responsibilities included: - Punch killing, construction activities and final walk down. Involved in trouble shooting of the instruments and control valves. Modification of termination and conduit installation modification.
Jan 03 - Aug 03 Project: PETRO KEMYA P.E PROJECT, JUBAIL
Position : Instrument Technician
Duties involved in calibration various instruments, installation of instruments and loop checking, TK 3 vibration miter and vibration transmitter installation system preparation for loop checking activities,
Aug02 - Dec 02 Project : ARAMCO, G.O.S.P-2 HARDH
Position : Instrument Technician
Supervision for main cable pulling from field to control building, termination at junction box, marshalling cabinets and punch killing activities. Co-ordinate with clients and third parties. Monitor and control work to meet completion dates. Assisted DCS Engineer for site acceptance test (SAT) of all marshalling cabinets both analog and digital (Yokogawa Centum CS 3000). Assisted vendors and instrument engineers in commissioning process instrument and control. Interpret drawing and specification. Ensure all test equipment is in good condition such as: Hart communicator, Smart field communicator, Pressure calibrator, Digital test gauge, Pneumatic dead weight tester, TK 3 vibration simulator, Pulse checker PC 2201 generator , Digital multi-meter, etc. Responsibilities for tag in tag out for safety precaution
Feb 02 - Aug .02 Project : GAZALANPOWERPLANT.
Position : Instrument Technician
Involved in Loop Checking and Pre-commissioning Activities
Worked as Instrument Technician, responsible for installation, configuration, operation, and trouble shooting for different types of transmitters
Mar 01 - Nov 01 Company :L.G Construction.
Project : Saudi Aramco Shoiba Downstream Project
Position : Instrument Technician
Involved in calibration , loop checking , pre-commissioning and commissioning of pneumatic and electronic instruments on this plant. Involved in preparation of loop dossiers, submission to QC department for approval, carry out loop checking with a Flow, level, Temperature Indicators, recorders, control valves and local controllers. System involved are Honeywell TDC-3000, Triconix, Vibration monitoring system, Bentley Nevada and Foxboro temp, Flow Pressure, Level with interface level Transmitter and different types of Control Valves, MOV’s Limitorq etc.
July 97 to Jan 2000 Company : GRASIM INDUSTRIES L.T.D
Position : Instrument Technician
Participated in Pre-commissioning activities with various Vendors, hot loop checking, all kinds of logic checking preventive maintenance of critical instrument calibration, overhauling the Pneumatic and electronic instruments (pressure, flow level, temperature indicators, recorders), control valves and local controllers. Also involved implementation and monitoring of Plant Maintenance Schedules, liaise with Technical Department to supply Technical information required to execute jobs.
PERSONAL PROFILE
Name : Abdul Nasser
Age : 32
Nationality : Indian
Passport no : F6631994
I declare that the above particulars are furnished by me true and correct to best of my knowledge. I hope to receive a positive response based on my qualifications and experiences that will suite with your specifications. I assure you that I will be an asset in your organization for my dedicated, honesty and hard working spirit
Date: Yours faithfully Place: Abdul Nasser.