Post Job Free
Sign in

Power Plant Project

Location:
United States
Posted:
December 06, 2011

Contact this candidate

Resume:

ALVIN JEQUILLO MOGA

Contact no.+974********/+639*********

Email:*********@*****.***

** *****,******,*******,**** City, Philippines

PERSONAL DATA:

Birth Date : October 25,1981

Birth Place : Spolarium St.Cebu City

Sex : Male

Age : 30yrs.old

Weight : 61kg

Height : 5'4"

Religion : Roman Catholic

Nationality : Filipino

Status : Married

Blood Type : O+

PASSPORT DETAILS:

PASSPORT NO: XX4800300

ISSUE DATE: 20OCT.2009

EXPIRY DATE: 19OCT.2014

PLACE ISSUE: CEBU CITY,PHILS.

SPOKEN LANGUAGE:

JAPANESSE,ENGLISH,TAGALOG,AND CEBUANO

EDUCATIONAL BACKGROUND:

VOCATIONAL:

Consumer Electronics Mechanic

Technical Education and Skills Development Authority

Lahug,Cebu City

Mechanical Technology

Don Bosco Technology Center

Punta Princesa,Labangon,Cebu City

HIGH SCHOOL: Babag National High School

Babag1,Lapu-Lapu City

TRAININGS/SEMINARS:

Siemens Quadlog Safety PLC Programming

Sayson Systems and Technology

MACV Development Corporation, Cebu City Phils.

Fundamentals of Industrial Instrumentation with Calibration

Metrologyx Industrial Instrumentation Training Center

Mandaue City Philippines

H2S/BA (QP APPROVED)

ENERTECH AVIATION & MARITIME ACADEMY

DOHA QATAR

ES Youth Training Foundation,Inc

(200hrs and 8hrs of Cross-culture Training)

0115 Junquera St.,Barangay Cogon, Cebu City 6000,Philippines Tel no. 255-8023

OBJECTIVE:

To be part of a mature organization which enhances employee development and to continue to the company's goal and objectives with the application of my knowledge.

MY CORE VALUE:

To create value to our client through integrity, productivity and teamwork

CHARACTER STRENGTHS:

Excellent Leadership skills, gladly accepts responsibility and mission oriented

WORK EXPERIENCE:

SHUTDOWN MAINTENANCE SERVICES W.L.L. DOHA QATAR(supplied to)

QATAR ALUMINUM UNLIMITED CO.(QATALUM)

(COMBINE CYCLE POWER PLANT)

With Power Generation of 1390MW and 9FA GAS TURBINE make GE

Messaied Industrial City ,Doha Qatar

March 13,2010 to Present

POSITION: ELECTRICAL TECHNICIAN

(Maintenance Department)

Job Description/Responsibility:

• Doing routine PREVENTIVE,CORRECTIVE MEANTENANCE ,Rectify and Identify of Breakdown

of electrical equipments with the accordance of SAFETY PROCEDURE’S ,COMPANY’S

PROCEDURE’S and OPERATIONAL REQUIREMENT’S of the COMPANY ,such as:

GENERATOR’S : 15.75kv,12,229AMPS,233MW (MAKE GE)

:11KV,6.5MVA,,5.2MW (MAKE CATTERPILLAR)

:400V,3000KVA (MAKE AGGRETECH)

TRANSFORMERS UP TO: 220KV (Make ABB,HYOSUNG,FORTUNE)

MOTOR’S UP TO :2700KW

SWITCH GEAR’S UP TO: 12KV,3150A,40KA,(MAKE LSIS)

LCI LS2100 STATIC STARTER CONTROL (GE)

EXITATION EX2100 EXCITATION CONTROL (GE)

BATTERY CHARGER & UPS(MAKE ELETTRONICA INDUSTRIALE S.P.A.)

TESTING OF RELAY’S: MICOM P127,243, P143,P225,P921,C264,M231,122,632

:GE MULTILIN T60,C60,G60(MAKE AREVA,GE)

FAMILIAR OF: INJECTION KIT CMC256 OMICRON

:HIGH VOLTAGE DIGITAL INSULATION TESTER(MODEL 380385EXTECH)

PRESIDIUM CONTROLS & INDUSTRIAL TECHNOLOGIES CORPORATION

3/F Dispo BLDG ,A.C. Cortes St .Mandaue City, Cebu 6014 PHILS.

Tel# (63-32-420-****

(June 29,2009-March 05,2010)

POSITION: INSTRUMENT TECHNICIAN

GLASS PLANT PAN MIXER AUTOMATION PROJECT

San Miguel Corporation, Mandaue Glass Plant ,Phils.

Job Description/Responsibility:

• Site survey for instrumentation and electrical works

• Loop Checking and pre-commissioning test

• Trouble-shoot problematic loops during commissioning from field to DCS Control room

• Cable pulling and continuity test of cables and wires

• Calibration and re-ranging of smart transmitters/Field Instruments

• Wiring and termination of field instruments from smart transmitters and sensors

KABUSHIKI GAISHA MITOYO TECHNICAL CO.LTD

Kagawaken, Nakatado-gun Manno-cho, Oguchi 918-2 JAPAN

Tel#/fax#:087*-**-****

June 28, 2007-April 27,2009

POSITION: MACHINE TECHNICIAN and OPERATOR

(IC chips and A line Department)

Job Description/Responsibilities:

• Maximize uptime of equipment to sustain equipment for mass production

• Effective troubleshooting of equipment-related problems to minimize equipment downtime

• Checking and examining of all electronics devices that has been designed ,manufactured ,produce and has to be sell/sale

• Support manufacturing area compliance for electronics Assembly

• Designing ,manufacturing/producing and selling of electronics devices

PRESIDIUM CONTROLS & INDUSTRIAL TECHNOLOGIES CORPORATION

3/F Dispo BLDG ,A.C. Cortes St. Mandaue City ,Cebu 6014 PHILS.

Tel# (63-32-420-****

20 January-20 May 2007

POSITION: INSTRUMENT/MECHANICAL TECHNICIAN

DCWD Talomo Sump Control System & SCADA Project

Davao City Water District, Davao City ,Phil’s.

Project:

• Upgrading of convention panel mounted controllers and recorders using Yokogawa Stardom Hybrid SCADA Controllers and HMI ,new Yokogawa Smart transmitters for Sump Level and flow Metering system with SCADA/PC HMI, interfacing with telemechanich/Schneider electric variable frequency drives and soft starter and other parameters monitoring and trending.

Responsibility:

• Installation, fabrication for layout of cable trays and conduits for instruments and power cable.

• Installation, fabricate of instrument junction boxes and foundation field bus junction boxes

• Calibration and re-ranging of smart transmitters/field instruments and sensors including loop-checking prior to commissioning

• Wiring and termination of field instruments from smart transmitters and sensors

Project: Meat Processing Plant PLC Controls System Project

Matutum Meat Processing Plant, General Santos City

(10 Feb-Dec 2006)

Responsibility:

• Site survey for instrumentation and electrical work

• Loop checking and pre-commissioning test

• Wiring and termination of field devices up to the control junction box and PLC system panel

• Installation of level sensors ,proximity limit switches, and solenoid valves

• Cable pulling and continuity test of cables and wires

• Responsible for mechanical fabrication such as bolt’s nut’s and electrical, mechanical supports.

Project: URSUMCO-Control System & Instrumentation Modernization

Universal Robina Corp-Manjuyod, Negros Oriental ,PHILS.

(Jun 2003-Apr.2004)

Responsibility:

• Troubleshoot problematic loops during commissioning start-up from field to DCS control room.

• Calibration and re-ranging of smart transmitters & sensors

• Installation of field instruments (pressure , temperature, level ,flow) base on instrument installation and hookup details.

• Site survey for instrumentation and electrical work

• Loop checking and pre-commissioning test

• Wiring and termination of field devices up to the junction box and PLC control system panel

• Installation of level sensors, proximity limit switches, and solenoid valves

• Cable pulling and continuity test of cables and wires

• Mechanical fit up, install and fabricate for supports as per installation drawing

Project: National Power Corporation-Geothermal Power Plant Control System

National Power Corporation-Palinpinon Geothermal Plant Complex

Valencia, Negros Oriental, PHILS.

(Apr. 2002-Jan.2003)

Project:

• A new Yokogawa CS1000 DCS control system was installed to replace an obsolete fuji data acquisition system. Tie-in of the DCS signals to the existing marshalling panel was done on line loop by loop via hot cover. the same type of control system was installed in four(4) identical modular plants namely Nasuji, Sogongon 1,sogongon2,okoy geothermal wells monitoring system.

Responsibility:

• Cable pulling, fixing and termination of cables from existing marshalling panel to the new DCS marshalling cabinet.

• Installation of instrument junction boxes and auxiliary terminal boxes.

• Calibration and re ranging of new Yokogawa smart transmitters/field instrument added to the projects scope

• Loop check of instrument prior to commissioning.

• Troubleshoot problematic loops during commissioning start up from field to DCS control room

Project: Dyno-Nobel Ammonium Nitrate Plant Instrumentation & Control Systems

Dyno-Nobel Philippines, Inc, Bacong , Negros Oriental

(15 Jan.-15 Oct.2000)

Project:

• Total instrumentation rehabilitation by upgrading of pneumatic instrumentation to smart transmitters and convention panel mounted controllers and recorders to yokogawa CS1000 distributed Control System and integration of Siemens SimaticS7 Programmable logic controller used for safety and shutdown System.ABB Taylor instruments and controllers were replace with Yokogawa instruments and DCS.

Responsibility:

• Assisted site survey for preparation of instruments work

• Lay out of armored multi-core cables on trays

• Fabrication, Installation of junction boxes and cable pulling and termination of multi-core and single pair cables

• Installation of Yokogawa smart transmitters and pneumatic valve positioner /actuators including impulse piping layout

• Loop checking and pre-commissioning test from field to DCS control room including field calibration of selected loops

• Installation and lay out of DCS control panel in the rack/marshalling panel room and installation of DCS consoles in the central control room(CCR)

• Fabrication of spare’s part which need during for installation

SUMMARY OF QUALIFICATION/SKILLS

• Familiar with the Qatalum HSE Policy with regards to working in with live equipments.

• Almost (8) years combined work experience in Mechanical, Electrical and Industrial Instrumentation

• Able to read and understand single line diagrams ,schematic diagrams, and motor controls

• Able to operate Medium, Low voltage application with protection relay’s and controls

• Familiar with Transformer protection and its controls

• Ability to read and Understand P&ID drawings/symbols

• System Integration: Ability to understand Programming Machine,DCS,PLC,and HMI

• Ability to perform I/O Channel Configuration, Wiring to PLC Termination Panel, Downloading, Error Troubleshooting and Testing.

• Computer Literate: Windows NT,98,2000 & XP Software and Application:

MS Word, MS excel Power Point and MS Internet Explorer.

• Electronics Troubleshooting, Assemble/disassemble Consumer Electronic Products and System.

• Drafting (isometric drawing)

• Lathe machine operation

• Vertical/Horizontal milling machine operation

• Hydraulic/Press machine operation

• Radial machine operation

• Binding machine operation

• Shaper machine operation

• Machine shop tools and gauges/instruments

• Welding

• Mechanical troubleshooting

• With good Interpersonal Skills aggressive and easy to adapt any environmental improvement.



Contact this candidate