Desire an operations position where I can utilize my formal education in Construction Management and Architectural Design along with additional course work completed. I feel this along with my varied experience including management skills, creative thinking and relationship building expertise would significantly contribute to a company’s sustained growth and success.
o LEED® AP- September 2008
o Prolog Manager
o Microsoft Office
o On Screen Takeoff
Work Experience:
- Hunt Construction Group- 10/2004 – 11/2009
USF Track and Field Complex (Tampa, FL) 7/2009-8/2009 & 9/2009
Position: Superintendent (approx. $50,000)
-Worked in conjunction with the USF athletic department to coordinate and oversee the removal, relocation, and installation of new and existing track and field equipment. Coordinated all work to ensure the safety and minimum disturbance to the sports programs using the facility on an almost daily basis.
o Developed and maintained project schedule
o Coordination between vendors, designers, and USF
o Oversaw the layout for new in-ground sleeves, excavation, saw cutting, and demolition of existing asphalt for new foundations.
o Controlled the removal and reinstall of Mondo track material once new sleeves were set and foundations poured.
o Coordinated the installation of 4 new jump boards placed in an existing runway along with installation of other various track equipment
Robinswood Middle School (Orlando, FL) 4/2009-6/2009 & 8/2009-9/2009
Position: Superintendent ($375,000)
-Coordinated and oversaw the work for a 28,100sf re-roof of existing classroom facilities according to the project documents. Worked with school officials to ensure that the learning environment wasn’t affected as work was taking place over occupied classrooms.
o Created and maintained project schedule
o Oversaw and coordinated the removal of existing roofing membrane and EPS board, removal and infill of existing mechanical curbs, removal of expansion joint curbing
o Coordinated the removal and replacement of roof drains, install of new tapered insulation and torch down modified bituminous material, installation of flashing system, gutter & downspout system, installation of new lighting protection system
o Dealt with Orange County Public Schools inspectors for daily roofing inspections
o Managed punchlist for roofing portion along with assisting in managing punchlist for entire school project
Jackson Center Classroom Renovation (Orlando, FL) 5/2009
Position: Project Engineer/Superintendent ($20,000 comm. service project)
-Coordinated, scheduled and oversaw the renovation of a teen center into a computer lab for a community recreation center in conjunction with the Orlando Magic. All work was done at the cost of the contractors.
o Coordinated, and brought on board all trades
o Regular correspondence with city officials
o Generated and maintained schedule
o Oversaw the demolition of all flooring and wall carpet
o Managed the prepping and priming and painting of walls, installation of new wood flooring and vinyl base, installation of new wall & floor mounted wire mold and receptacles along with the running of electrical, and the installation of new millwork Coordinated, and brought on board all trades
Charlotte Sports Park (Port Charlotte, FL) 11/2007-2/2009
Position: Project Engineer ($26 million)
-Worked directly with the project manager, superintendents, owner, architect, and contractors to manage and coordinate the daily operations and field activities for the Design-Build renovation of an existing baseball facility to house spring training operations of the Tampa Bay Rays.
o Daily interaction with trades to coordinate installation of work and resolve field issues in order to maintain the schedule
o Procurement of materials
o Drafting of letters to contractors and design professionals
o Involvement with the owner direct purchase program
o Review and correction of subcontractor payment applications
o Assistance in negotiation of change orders
o Regular interaction with both the owner and architect and correspondence between the two parties
o Prepared and tracked all subcontract change orders, owner change orders, CM and Owner contingencies expenditures, buyout and allowance expenditures, etc…
o Construction of monthly progress portfolio
o Development of the submittal log and the review and processing of all incoming, outgoing and returned submittals
o Produced and issued request’s for information, field work directives, notice’s to comply, and safety notices
o Document Control
o Attendance of coordination meetings and development of meeting minutes
Tampa Bay Buccaneers Corporate Offices & Training Facility (Tampa, FL) 7/2005-10/2006
Position: Project Engineer ($35 million)
-Worked with the project manager and other project engineers to ensure all daily work activities were being carried out and schedule was met for a new training facility.
o Creation of submittal log and process and review of submittals
o Preparation of subcontractor and owner change orders
o Daily correspondence with subcontractors & design consultants
o Preparation of all meeting minutes
Education:
Bowling Green State University GPA 3.14
Bowling Green, OH
Bachelor of Science in Technology
Major-Dual Major in Construction Management & Architectural Design