Tommy M. Thorn
**** ***** **** **** *****: 870-***-****
Trumann, AR. 72472
**********@*****.***
OBJECTIVE: Continue my professional career in a manufacturing environment to utilize my experience, knowledge and leadership to contribute to reaching the companies objectives and increase profits and reduce costs.
EMPLOYMENT:
2009 to Present - Maple Grove Baptist Church (Trumann AR).
Duties include record keeping, publishing weekly bulletin & mailers, custodial
Utilizing Mac computer
1999 to 2009 - B & C Die Cast (Pace Industries, Jonesboro, AR)
Quality Engineer: 2001 to 2009
PPAP Duties including IMDS
Familiar with AIAG: PCP, SPC, MSA, PFMEA, APQP, PPAP
Assisted in obtaining/maintaining Certification for TS 16949
Helped to reduce overall customer PPM's by 68%
Trained TS16949 Internal Auditor
Trained in Lean, C I, 8D, and 6S
Work closely with customers to develop a partnership along with keeping PPM’s down
Work closely with suppliers
Helped direct Kaizen events
Assist in training personnel
Performed Internal Audits
Certified fork lift driver
Lead in purchasing Spectrometer and was in charge of verifying metal content.
Gage Calibration and handling gage replacement including getting quotes and issuing P.O.'s.
Writing and assisting with procedures
Utilizing an Optical Comparator, CMM w/Geopak 2000, DCC CMM with GeoMeasure, Micrometer, Caliper, etc. Also, use of PC Excel, Word, Outlook, Projects, Power Point and limited use of AutoCAD.
Utilized end mill, welder, grinder, drill press and lathe to build fixtures and prepare samples
Quality Manager: 1999 to 2001
Assisted B&C in receiving ISO 9002 Certification (May of 2001), Arkansas Quality Commitment Award (Aug. of 2000)
Managed department of 3 full time inspectors and directed temporary staff
Trained floor personnel to become self directed on performing Quality checks
Dealt directly with customer complaints/supplier concerns, including corrective actions.
In addition to CMM\Layout\Gage Calibration responsibilities
CMM/Layout Person: 1999 to 1999
Perform First Article Layouts on new or revised customer parts
Revised calibration program reducing total cost approx. 70%
Dealt directly with customer complaints including corrective actions.
Perform in-process departmental Quality audits
1981 to 1999 -Colson Caster Corporation, Jonesboro, AR.
Q.A. Group Leader: 1989 to 1999
Direct a staff of six floor inspectors
Wrote and taught blue-print reading course
Receiving inspection(working with purchasing and vendors to insure good products from suppliers)
Handled disposition of customer returns and customer complaints
New Tooling layouts, plus layouts of old dies for Tool and Die Dept.
Work with Eng. on new product line
Gage Calibration (Help to write new Gage Calibration Procedures Manual) Familiar with Optical Comparator, Hardness Testers, CMM w/Geopak 500, Geopak 2000, Statpak and Scanpak. Datamyte System, Micrometer, Caliper, etc.
Also, use of PC Excel, Word, and limited use of Auto Cad
Q.A. Inspector A: 1988 - 1989
First piece (set up) inspection and buyoff
In-process inspection
Final inspection on the shipping line
Arc Welder Set Up/Operator: 1981 - 1988
To set up job from Blueprint and execute order