Highly motivated self starter with 25 years in the Heavy Civil Construction Industry, Focusing mainly in the areas of commercial, industrial site development and capital improvement projects, municipal and state highways. This includes the replacement of all underground Utilities as well as bituminous surface, curb, underground concrete structures, and sidewalks. Verifiable track record of consistently completing small to
Multi-Million dollar projects on time and within budget while maintaining a positive safety record.
Little or no supervision needed but readily compliments any supervisory or management team.
WORK HISTORY
Morgan-Corp, November 2007 to October 2009
Spartanburg, SC.
Project Manager
Perform administrative functions such as reviewing and writing reports, approving expenditures, purchasing all materials and services. Negotiate and prepare subcontracts, purchase orders, change orders, submittals, RFI’s, monthly billing, subcontractor billing approval, project file organization, cost vs. budget, warranties and training to the Owner where applicable. Verify all traffic and erosion control plans prior to construction, and document as required per state and federal specifications.
Efficient in (“Word, Excel, Street Smarts, Sure Trak, Outlook”)
• Completed two (2) Landfill projects under budget and on time despite record monthly rainfalls and inclement weather conditions.
• Successfully completed projects under budget located within various states concurrently.
Hoffman Brothers LLC. 2001 to November 2007
Battle Creek, Mi.
Project Field Manager
Review and familiarize in depth all Project requirements and specifications.
Organize and schedule all day to day construction by coordinating and directing all field personnel and subcontractor, making detailed plans to accomplish goals, plan and direct the installation, testing, operation, maintenance, and repair of underground utilities within the public and private sectors. Verify traffic plans and site conditions and ensure critical site details are documented through project management.
• Successfully completed numerous projects under budget statewide by utilizing key personnel and delegating responsibilities as needed to accomplish overall objective.
Hoffman Brothers LLC. 1995 to 2001
Battle Creek, Mi.
Heavy Equipment Operator - Excavation, concrete structures, paving, underground, grading,
Waste treatment plants, pump stations, airport runways.
Confer with management, production, and marketing staff to discuss project specifications and procedures.
Deciphered prints along with project coordination and Layouts.
Underground boring, dewatering.
TF Landscaping, 1990 to 1995
Kalamazoo, Mi.
Owner/Heavy Equipment Operator
Managed and coordinated efforts for general civil type projects, including paving, drainage, sewer line, storm sewer, utility and site support for residential projects.
Present and explain proposals, reports, and findings to clients.
Kalin Const,
Sodus, Mi. June 1985 to Dec 1990
Heavy Equipment Operator
Excavator Operator on Underground Pipe Crew/mass excavation, finish grading, concrete structures.
Finish Grade Operator
INDUSTRY CERTIFICATIONS
OSHA – 10 hr Certification
Red Cross – First Aid, CPR
Skanska – 40 hr Supervisory skills training
Coble Trench safety certification
Member IUOE
“Storm Water Management Operator"
• Certified through the State of Michigan”Department of Environmental Quality “ 2007-2012
• Certified through the State of Georgia “Department of Transportation” 2008-2011
“Worksite Erosion control Supervisor”
• Certified through “Georgia soil and Water Conservation Commission “ 2008-2011
Additional Information
DOD, DOE work performed.
Wet/Dry utility installation, 30+ feet deep, rock, sand, peat, clay
• Storm sewer = 108” RCP, Underground Aquifer/Retention Systems
• Potable water = 24” DIP,HDPE
• Sanitary sewer = 60” RCP,DIP, HDPE
• (CTS) Cement Treated Soils
• (CTGAB) cement treated graded aggregate base
• (RCC) Roller Compacted Concrete.
Project List
Pennfield, Mi.
New Pennfield High School 2006- 2007 $5,500,000 +
Project Field Supervisor
Complete site balancing (excavation), installation of new water main & fire protection system on exterior of building. Parking lots, storm drain, sanitary sewer system.
Foundation excavation/backfill, slab on grade, access roads, bituminous surface, concrete curb & gutter, sidewalks, finish landscape and grading of new soccer field.
City of Battle Creek / City of Albion Mi.
Municipal Street Reconstruction 2001-2007 $1-4 million annually (variable yearly contract)
Project Field Supervisor
Complete demolition and replacement of existing pavement, curb & gutter, sidewalks.
Demolition and replacement of storm, sanitary, and potable water systems under live circumstances.
Resurfacing projects consisted solely of milling/pulverizing and repaving of bituminous surface areas with no replacement of curb & gutter. In some instances concrete sidewalks were added or repaired as required.
Cassopolis, Mi.
New industrial Park 2007 $1,200,000
Project Field Supervisor
Clear cut and remove existing woods area out to right of way. Construct new roads by excavation and grading, extend & install new sanitary and storm system throughout site.
Excavate new retention pond for storm water system, install new curb & gutter, and bituminous surface.
Battle Creek, Mi.
Waste Treatment Plant Expansion
Project field Supervisor
Excavation of footings for new bypass chamber system for live 60” sanitary sewer.
Site grading and installation of new sanitary piping system leading to various ponds and buildings within the treatment facility.
LaGrange, GA.
Landfill Cell #4 2007-2008 $4,000,000+
Project Manager
Excavation and grading of additional 10 acre Cell adjacent to existing cells, underground leachate system installation (HDPE electro fusion) Additional site work consisting of repair and maintenance of existing slopes, and access roads. (CTGAB)
Battle Creek, Mi
Hart, Dole, Inouye military Federal Center 2005
Project Supervisor
Installation of a new precast manhole over an existing storm sewer line (18+’ deep) that had collapsed. Core drilled and pushed a 30” casing over 70’ feet to connect new structure to existing municipal storm system.
Recognized in the “Michigan Contractor and Builder” magazine for using a new shoring system to complete project.
Spartanburg, SC.
Kohler Company Landfill $570,000
Project Manager
Clear cut and remove existing woods and underbrush in order to excavate and finish grade new access road the entire perimeter of future landfill site. Install storm drainage sediment pond and emergency overflow rip rap areas.
Greer, SC.
BMW New Assembly Plant 2008-2009 $13,000.000
Project Manager
Installation and testing of exterior fire protection, potable water, and sanitary sewer system. Installation of exterior electrical site lighting. Mass excavation and finish grading for all access roads and parking areas, curb & gutter, bituminous pavement, and RCC pavement.
Battle Creek, Mi
Battle Creek Federal ANG Base 2001-2007
Project Supervisor
Performed fixed contract services and many time and material projects such as grading, storm water installation systems, aircraft runway widening, taxi ways, bomb shelter & various building/structure footings, roads, and parking lots.
Augusta, GA.
Bakers Place Landfill Closure 2008 $2,200,000
Project Manager
Closure/Capping of last remaining cell in public landfill which includes installation and covering of liner system and new berm construction atop of liner for drainage. Reconstruction of existing detention pond and installation of CMP drainage pipe in various locations.
Battle Creek, Mi
Hart, Dole, Inouye military Federal Center 2003-2004
Project Supervisor
Removed northeastern gate and municipal city entrance road (Garfield Rd). Placed new retaining wall in the entrance way backfilled old road to new elevation. “20+ feet of backfill”
Installed 100’x10’ retainer wall between existing parking and new parking to separate and alleviate severe elevation changes. Installation of new storm water system, curb & gutter, pavement and markings.