Resume:

Samir Kumar Agrawal

Mobile: 876-***-**** / 943-***-**** / 789-***-****

Email: yn4rs6@r.postjobfree.com

Seeking assignments in Project Management with an organisation of high repute in the Construction Sector

CAREER CONSPECTUS

Over 19 years of cross-cultural experience in managing overall Construction Projects right from development to delivery encompassing planning, monitoring, bill checking, controlling phases of project lifecycle, overall inter-discipline co-ordination, administration and resource planning.

A strategic planner with expertise in planning and executing construction projects with a flair for adopting modern construction methodologies in compliance with quality standards.

Hands on experience in construction, industrial painting, maintenance, housekeeping, waste management, landscaping of Industrial plants and infrastructure related projects such as roads, storm water drains, high rise chimneys, residential buildings including colonies and interior furnishing of Building

Holds the distinction of executing numerous construction projects of large magnitude within a strict time schedule with stringent measures for cost and quality control.

LEAD CERTIFIED TRAINER (AS PER DUPONT) ON SAFETY HAZARDS RELATED TO EXCAVATION.

Safety hazards related to Working at Height /Scaffolding / SWP / HIRA / Confined Space Entry / etc.

Well versed with BS & IS Codes, ISO Certification and SAP Software.

Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in co-ordination with clients, architects, consultants and contractors.

CORE COMPETENCIES

Project Management

Developing project baselines; monitoring and controlling projects with respect to Cost, Resource Deployment, Time over-runs and Quality Compliance to ensure satisfactory execution of projects.

Formulating operating budgets and managing overall operations for executing civil projects including Fit Out & Contract / Tender Management within cost & time norms.

Organising/ participating project review meetings for evaluating project progress & de-bottlenecking.

Ensuring compliance with the applicable laws and statutes, which a construction company/institution is required to follow in execution of projects e.g. Indian Contract Act, Arbitration Act etc.

Site & Construction Management

Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilisation to maximise the output.

Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements.

Formulating & implementing stringent systems and quality plans / manuals to ensure high quality standards during all the stages of project.

Rate Analysis for different civil items.

Resource Management

Leading a team of professionals; ensuring suitable deployment and timely availability of manpower.

Liaising with clients, architects, consultants, contractors, sub contractors & external agencies for determining technical specifications, approvals and obtaining statutory clearances.

CAREER CONTOUR

JK Paper Mill, Jaykayur, Rayagada, Orissa, India: 07.06.2011

Chief Manager (Head of Department)

Brownfield Project – Total cost of 1650 crores with civil cost as 200 crores (Concrete - 30000cum / Torsteel - 3000mt, / Shuttering – 175000sqm excluding Qty for Power Plant).

Leading a team of 5-Engineers & 2-Supervisors and 1000 contract manpower’s.

Construction of Paper Machine Buldg / CLO2 Buldg / ESP / Lime Kiln / Recovery Boiler & Chimney / Evaporator / Roads.

Laying of new railway line of 1.40km & 2-25mw & 30MW Power plant with Boiler of 165 & Turbine of 30MW & 25MW.

Planning, tendering, execution, site management, coordination with various authorities for speedy execution of the work.

PLANT EXPANSION FOR PRODUCTION OF 1, 65, 000 TPA OF PAPER & 2, 15, 000 TPA OF PULP. TIME PERIOD OF 20-MONTHS.

Ultratech Cement, ADITYA BIRLA GROUP, India: 18.05.2008 to 06.06.2011

Senior Manager (Head of Department)

Leading a team of 5-Engineers and 150 contract manpowers with total budget of approx. 5-crores.

Laying of new railway line & maintenance of old existing Railway Line.

Project Work - Ex: Expansion of Colony, Auditorium cum Club House, 25MW Thermal Power Plant, STP plant, Coal Hopper, Coal Reclaimer, New Residential Buldgs, Bachelor Hostel with modern look, etc

Maintenance Work for Cement & Mining plant – Ex: Bitumen & RCC road, etc

Retrofitting & Renovation of Old Structures.

Construction of Auditorium Building (just equivalent of Cinema Hall) with interior work costing Rs 3 crores.

Planning for civil work related to Brownfield (Expansion) Project of 10000 TPD of Cement.

Estimation for all civil infrastructures related to Brownfield (Expansion) Project of 10000 TPD of Cement.

Construction of new Bachelor hostel & 110 Houses for our Brownfield Project costing Rs 35 crores.

Birla Cellulosic (A Unit of Grasim Industries Limited-ADITYA BIRLA GROUP), India:

24.11.1994 – Feb’06 / Jan’08 to 17.05.2008 Deputy Manager

Procurement of all materials & vendor development w.r.t. civil jobs (Jan’ 08 to May’ 08).

Expansion of Civil & Structural Works costing about Rs. 75 Crores (Jan’ 08 to May’ 08).

Green-Field Project (Rs. 450 Crores involving civil work of Rs. 125 Crores) from grass root level (Nov’ 1994 to Mar’ 1998).

- Estimation, layout, surveying & other works before start of construction.

- Viscose plant building with pipe rack and foundation of tanks (Rs. 15 Crores)

- Power plant of 30MW capacity with pipe rack and equipment foundations (Rs. 10 Crores)

- Interior decoration of various public buildings (Rs. 5 Crores)

- Dam Cum Spillway Works (Rs. 8.5 Crores)

- Effluent discharge pipeline 40 kms long from which approx. 34 kms is of prestressed concrete pipes & approx. 6 kms is of HDPE pipe (Rs. 22 Crores).

Planning for additional 100TPD of viscose staple fiber (2005-2006).

Designing the specifications for coatings based on the exposure conditions, planning & execution of painting (steel structures) activity with respect to material/applicator contractor, quality control & ensuring product applied as per the specifications. Schedule of painting has been prepared for next 5 years (Rs. 80 lacs p.a.)

Comprehensive (Soft & Industrial) housekeeping and waste management (2001-2006).

Civil maintenance & Scheme Jobs of Plant (1999-2006) Structural Rehabilitation (2004-2005).

Acid Proof (Epoxy) Lining (2002-2006).

Worked with Civil Accounts (Audit) Department for Greenfield Project Civil Bill Checking (1996-1997) - Saving of approx Rs 10 lacs.

Aditya Birla Chemicals (Thailand) Ltd. - Chlor Alkali Division, THAILAND: Mar’06 – Dec’07

Civil Head

Work carried out with the help one supervisor for total value of 8 Crores Baht.

Rehabilitation of Steel Structures (2006-2007) - 10 lakhs Baht.

All type of plant abnormalities with respect to departments viz. Mechanical, Process, Electrical, Instrumentation, etc) to be identified and submitted to concerned for implementation (2006-2007).

Improvement work during VVIP Visit (2006-2007) - 145 lakhs Baht.

New Renovated Aesthetic look to Plant Toilets (2006) - 7 lakhs Baht

Construction of New Transformer Building (2006) – 12 lakhs Baht

Rehabilitation of Civil structures (2006-2007) – 25 lakhs Baht

Estimating & Costing (Civil & Steel Structures) for ECH Expansion Project (2006) - 10 Crores for 5000SQM.

Planning for New Colony with all basic amenities like Guest House, Club House, Mandir, etc. (2006) - . 8 Crores for 40000SQM.

Planning, tendering, execution, site management, coordination with various authorities for Pilot Plant Project - Civil & Steel Structures (2007) - 205 lakhs Baht)

Planning, execution, site management, Coordination with various authorities for Process Drain Scheme (New Pit with overhead CPVC pipeline with Auto Level Control System) for plant in running conditions (2007) - 90lakhs Baht

Retrofitting of Storm Water Drains for plant in running conditions. (2007) - 40 lakhs Baht

Acid Proof (Epoxy) Lining for chemical (98.5% H2SO4/HCL/Hypo/Caustic/ Brine/etc) prone areas (2006-2007) - 67 lakhs Baht

Painting of Steel Structures (2006-2007) - 70 lakhs Baht

Maintenance of Civil Structures including Roads, Roof Sheets, Colony, Rain Water Pipe, etc. (2006-2007) - 75 lakhs Baht

New Aesthetic Renovated Workshop Office (2007) - 22 lakhs Baht.

Self Design PVC / Concrete handrails for Staircase & Platform for Effluent Treatment Plant Area (2007) - 7 lakhs Baht

Acid Proof Lining on Roads, which can take, load of about 25MT & can also resist chemicals like HCL, Hypo, Caustic, Sodium Hydroxide (2007) - 25 lacs Baht.

Possess 2 years experience in Pharmage Industries, Matunga, Mumbai (Sept’ 1992 to May’ 1994) – Responsible for maintenance of buildings & expansion work of building

SCHOLASTICS

B.E. (Civil) from Amravati University in 1992 with first class marks.

IT SKILLS: Well versed with Office Automation & Internet Applications.

PERSONAL DOSSIER

Date of Birth : 15th August 1968

Address : JK Paper Limited, House No C – 1/3, JK Paper Colony, Jaykaypur-765015, Dist: RAYAGADA

Passport Details : F 5292776 (valid upto 19.10.2015)



Contact this candidate