Post Job Free
Sign in

Maintenance Manager

Location:
Rolling Meadows, IL, 60008
Salary:
65000.00
Posted:
November 25, 2011

Contact this candidate

Resume:

Timothy Dawe

847-***-****

*****@***.***

AMPAC Flexible Packaging 2011

Maintenance Manager

• Managed maintenance and facility personnel of twenty-four-six (24-6) flexible packaging manufacturer

• Responsible for writing and scheduling preventative, proactive, and emergency maintenance procedures

• Assigned maintenance personnel work orders for completion

• Oversaw the moving, shipping, and installation of production machinery to new facility

• Established guidelines for chilled water, electrical supply, compressed air and tooling

• Evaluate all machinery and auxiliary equipment for implementing lock out/tag out process

• Developed new production tooling CAD drawings for manufacturing quotes

• Moved machines from older facility to the new location

• Worked hands on with the maintenance team when necessary

Temple Inland 2010 – 2011

Maintenance Planner/Boiler Room Technician

• Responsible for providing a pathway to complete maintenance work by planning, estimating/scoping, and coordinating maintenance lock out/tag out procedures

• Identified required skill set, special tools, outside labor, parts and materials and required time to perform maintenance task

• Understood and developed the critical path for each jobs completion

• Daily boiler room, starch room, and waste water treatment responsibilities

Aflac 2009

Sales Associate

• Sales of assurance plans for individuals, groups, and families

Fortner Graphic Solutions Inc. 2007 – 2008

Mid-Central Sales Manager

• Sales of printing press re-manufacturing on customer’s site or in the Nevada, MO facility; printing press cylinder re-manufacturing

• New Press installations, re-locations, piping and electrical

Vertis Communications 2000 – 2007

Facility/Maintenance Manager

• Managed facility and press room maintenance staff at a round-the-clock 100,000sqf offset web printer of newspaper advertising materials, and 80,000sqf paper storage warehouse

• Responsible for daily operations, including web press maintenance and preventative maintenance scheduling

• Completed re-writing, entering, and editing preventative, predictive, and proactive maintenance tasks and procedures using PMC 2000 and Microsoft Office software for EVERY piece of equipment in facility

• Responsible for maintenance personnel work schedules, employee performance mentoring and evaluations; fostering continuous improvement throughout the facility

• Worked with part acquisitions and alternate source manufacturers

• Tracked and reduced department budget

• Performed continuous updating and revising Auto CAD drawings relating to press lay-out, press parts, building, and office renovation and expansion

• Developed work flow analysis study to restructure suitable work space that will maximize productivity and minimize injuries

• Worked as a key member of division safety program while writing emergency evacuation procedures with graphics, along with re-structuring the safety program with emphasis on machine guarding and using the "5S" program

• Scheduled and designed upgrades and retrofits of existing equipment with our engineering division

• Worked closely with all vendors during press rebuilds, re-locations, and concrete floor "pad" reconstruction, research, compare, and order auxiliary equipment needed to keep press room fully functioning, solving equipment problems 24-7 which enabled our production department to meet crucial deadlines; facility maintenance

• Managed the installation of security system (main facility and warehouse) with keyless door access and video surveillance

• Developed the ROI and managed the installation of regenerative thermo oxidizer to cut gas consumption in pollution control device

• Developed the ROI and managed the installation of heat exchanger on pollution control device to heat building and cut energy costs

• Managed the installation of WMS at the 80,000sqf paper storage warehouse

• Oversaw the installation of the chilled water (60degrees) upgrade-400 tons

• Developed the ROI and managed the installation of "T-6" lighting throughout building to cut energy and recycling costs

• Grounded and painted floor with epoxy paint in entire facility to mark walk ways, brighten up all work areas and create a better work environment

• Implemented bar coding in the press room and maintenance parts area to track incoming and outgoing parts inventory

• Implemented Brady lock out/tag out system in the maintenance and pressroom departments for a safer work environment and to assist with better preventative maintenance practices

• Kept the maintenance department budget under projected figures six (6) years straight

Graphic Innovations Inc. 1993 – 2000

Project Coordinator

• Coordinator of multiple crews in repair, unit swap, rebuild and turn-key installation of a variety of printing presses, including Harris, Hantscho and Goss, throughout the U.S. and abroad

• Responsible for generating project Gantt Charts (MS Project) for in-house and customer tracking as well as generating and updating precision Auto Cad drawings of each press layout for its installation

• Worked on all aspects of work scheduling; ordering and set up, purchase and delivery of required auxiliary equipment and parts

• Coordinated all shipping and crating of equipment and all travel and lodging as well as scheduling of subcontractors and quality of work performed on-site during installations

• Worked as a direct liaison with customer from initial tear down of press to and including start-up, test printing and production, as well as trouble-shooting, tracking and follow-up of warranty issues

Shop Supervisor

• Supervised the rebuilding of offset web printing presses in shop or at customer's facility; installation of rebuilt presses through precision aligning, leveling and tramming; start-up, test printing and putting same in production of quality four-color material

Goss International 1983 – 1992

Field Service-Folder Specialist

• Over saw three (3) Colorliner, twenty-four (24) unit press installations (approx. 2000 tons each press) at the Los Angeles Times manufacturing plants

• Managed vendor and engineering installations, as well as start-up and troubleshooting problems with these installations

• 160- and 144-page folders; repair, re-time and set-up for turn-key installation

• Hands on involvement with engineering department in installation of keyless inking system on four-high Colorliner unit

Field Service-Machinist Erector

• Colorliner, Headliner and Metroliner; repair, rebuild, re-time for turn-key new installations

• Assembly and rework C-500 and C-700 units and folders

• Assembly, rework as per engineering and print-test prototype; C-500 four-color press

• Build and rebuild as per R&D engineering; C-500 folders and quarter-folders

• Field Service of and R&D of C-500 units and folders

• Gear cutting; hobbing; shaping and straight bevels: cam milling and grinding

Education

University of Wisconsin – Madison School of Business

William Rainey Harper College

College of DuPage

JF Kennedy – High School Diploma



Contact this candidate