DERWIN RICHMOND
**** ************** ***** ****: 336-***-****
Greensboro, NC 27406 Home: 336-***-****
xx2wpy@r.postjobfree.com
SUMMARY
More than 10 years’ experience with civil engineering in the creation of detailed drawings and design layouts for over 100 bridges throughout the east coast. Demonstrated knowledge of shop practices relative to the manufacturing environment. Work well independently or in a team setting. Detail oriented, with excellent communication skills. Knowledge of AASHTO and multiple state Department of Transportation specifications.
SOFTWARE
Skills: AutoCAD 2011, AutoCAD LT, FlyCAD-LASIT, Microsoft Office: Word (200+ hours), Excel (100+ hours), Outlook (200+ hours), PowerPoint (50+ hours), JenCNC, Clemsoft
Knowledgeable: SolidWorks, Rhino 3D, Inventor, Alibre
EDUCATION
ITT Technical Institute - Computer Drafting and Design
Associate of Applied Science degree, anticipated graduation June, 2013
PROFESSIONAL EXPERIENCE
Purolator-Facet, Inc. (Express Employment Professionals – Contract Position) Greensboro, NC /Filtration Company/
Laser Marking Programmer, 09/2011 – present
Create program specifications for laser markings utilizing FlyCad-LASIT.
Document changes in Excel for changes made to product.
Assist packaging engineers with laser markings and labeling to identify product.
Carpenter Company – High Point, NC /Insulation Material Company/
CNC Operator, 05/2011 – 09/2011
Performed customer specific jobs using JenCNC and Clemsoft programs.
Created roofing products, packaging foam, concrete voids, exterior insulation, and laminates.
Used Hot Wire EPS Foam Cutting for all the foam.
Hirschfeld Industries Bridge - Greensboro, NC /Steel Manufacturing Company/
AutoCAD Draftsman, 06/2000 – 11/2010
Performed data analysis and provided recommendations to achieve completion of detailing bridges for the shop to cut, burn, paint, and erect in the field.
Worked with the purchase of material with in billing of material through requisitions.
Detailed structural beams, cross frames, girders, sole plates, and brackets using AutoCAD 2011.
Notable Bridge Projects
The Central Artery/Tunnel Project – “The Big Dig” (Boston, MA) – 2005
Cooper River Bridge – (Charleston, SC) – 2004
Woodrow Wilson Bridge Expansion – (Washington, DC) – 2002