Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Victorville, CA
Posted:
November 08, 2012

Contact this candidate

Resume:

Craig Nicholson

**** ****** **. ******, **. *****

760-***-**** xw6w0n@r.postjobfree.com

Mechanical Project Manager/ Estimator

CAREER PROFILE

Seasoned and versatile professional with 29 years experience contributing to the effective

operation and profitability of successful construction companies through outstanding knowledge

of LEED requirements, commissioning, construction management and estimating expertise.

Confident and innovative project manager and estimator with proven ability to oversee complex

and diverse educational, healthcare, correctional and federal government projects. Articulate

and collaborative communicator and leader with talent for developing trusting and productive

relationships with owners, colleagues, and sub-contractors. Result oriented with a proven track

record of completing projects within the time frame and budget allocated, while accomplishing

the milestones in the scope of work and resolving obstacles from initial planning stages thru

final close out documents.

PROFESSIONAL EXPERIENCE

Project Manager West Tech Mechanical, Inc. 2012 ~ Present

Provide accurate and updated information while on site visits, generate RFI’s and process change orders, schedule

and assist in factory start up of equipment, participate in commissioning process, prepare LEED documentation and

O & M manual, update and prepare monthly billing.

Coastline CC Learning Center, Newport Beach, ~ 2.8 million, Prime contractor, new construction

of a 3 story, 65,000 sf. LEED Platinum project. The project consists of computer labs, general education

classrooms, chemistry labs. All being serviced by (4) Air handlers with chilled and hot water hydronic piping,

VAV system with 100% OSA. With garden roof.

Rancho Santiago CC Humanities Bldg., Santa Ana, ~1.9 Million, Prime contractor, new

construction of a three story, 97,521 sf. LEED silver project. Philosophy, English, Sociology classrooms, 324

seat auditorium serviced by a chiller, boiler and air handlers.

Mt. San Antonio College Design Technology Center, ~ 2.1 Million, Prime contractor, New

construction of a 2 story, 62,837 sf. LEED silver project. 12 laboratory classrooms, 14 computer science

classrooms, 950 ton chiller, Roof top air handlers, (2) boilers with hot water reheat system.

Estimator Quadra Group Development 2011 ~ Present

Prepare custom tailored estimates of Design Build, and Plan & Spec projects using Fast Duct, Fast Pipe, Electric Bid

Manager, and Xactimate software for Mechanical, Electrical, Plumbing and General Contractors nationwide. Each

specialized scope of work may entail estimating sheet metal ductwork, hydronic piping, high and low voltage

electrical, fire lift safety, direct digital control systems, photovoltaic solar systems, above and below ground

commercial plumbing, fire sprinkler systems, underground site utilities. Update bid and proposal with current

addendum changes and review estimate with contractors nationwide.

Project Manager / Estimator Franklin Mechanical Systems, Inc. 2010 ~ 2011

Prepare estimates and proposals of Prime and Multi Prime projects using Fast Pipe / Fast Duct estimating software.

Manage projects consisting of dry-side sheet metal, and hydronic piping required for new commercial construction

and modernization of Public Works, Federal Government and Private Construction. Develop schedule of values,

negotiate buy out and order equipment and materials, Issue purchase orders and prepare submittals.

Thermal Sheriff Station, Thermal ~$3.2 million. Sub-contractor, new construction of a 2 story, 9,000sf.

Regional headquarters. Including administration building with forensics lab and fume hoods, 12,000sf.

Hanger. LEED Platimum project with a central chiller plant, hydronic piping and energy management

system.

Barstow CC Performing Arts, Barstow ~$1.7 million. Sub-contractor, new construction of a 2 story,

39,898sf. Theater and seating for 908. LEED gold project with a central chiller plant, hydronic piping.

Mojave Water Agency Headquarters, Apple Valley ~ $650,000. Sub-contractor, new construction of a single

story 22,194sf. Administration and 6,296sf. Maintenance building. LEED Platinum project using

photovoltaic solar panels, hot water hydronic piping with VAV system, and energy management system.

Barstow CC Health and Wellness Center, Barstow ~ $780,500. Sub-contractor, new construction of a 2

story, 24,000sf health and wellness center, three physical labs, indoor resistance pool, and weight rooms.

Project Manager / Estimator Los Angeles Air Conditioning, Inc. 2007 ~ 2009

Estimate and manage prime and multi prime projects as either a general contractor or sub contractor in public and

private sector commercial and modernization projects. Specializing in both dry-side sheet metal, and hydronic piping,

while managing other trades. Develop and track construction schedules using Primavera, issue purchase orders and

sub-contracts, update project billing, write RFI’s and change orders, prepare all close out documents.

Glendale CC Chiller Plant Upgrade, Glendale ~ $650,000 General contractor, upgrade 750 ton

chilled water central plant, with underground and rooftop hydronic piping, electrical upgrade, roofing,

carpentry, asphalt and concrete repair.

Victorville Verizon Regional Office Remodel, Victorville ~ $725,000. Sub-contractor, Remodel of a

22,500sf administration office, includes new air handlers, exhaust fans, ductwork, registers, and EMS.

Orangeview JR. High School HVAC Upgrade, Anaheim ~ $ 350,000. General contractor,

modernization of 19 classrooms, demolition and installation of HVAC, electrical, plumbing, carpentry,

painting.

Regional Branch Manager Custom Air Designs, Inc. 2001 ~ 2007

Branch manager of a successful mechanical design build corporation specializing in Federal Government contracts.

Responsible for overall success of all projects as either a general or sub-contractor. Negotiated numerous federal

SABER contracts and design built projects consisting of new commercial construction and modernization. Prepared

design build estimates and oversee other estimators, developed budget and production control schedules. Managed

and review projects continually, prepare project forecasts and billing, reviewed all close out documents.

Miramar Naval Air Station Base Hospital, Miramar ~ $2.1 million Sub-contractor, OSHPD hospital,

renovation project of a existing 24,000 sf. Building and a new construction addition of a 62,000 sf. Building

including HVAC, plumbing and electrical.

Marine Ground Air Combat Center Post Office, Twenty-nine Palms ~ $975,000 General contractor,

Design build Post Office renovation project of a existing 7,000 sf. Building consisting of demolition,

concrete, engineering, structural, carpentry, painting, HVAC, plumbing, electrical, flooring.

Point Loma Submarine Base Administration Building, Point Loma ~ $ 1.3 million General contractor,

Design build 2 story 37,000sf. Administration Office Remodel, consisting of engineering, demolition,

structural, carpentry, painting, HVAC, plumbing, electrical, flooring.

EDUCATION / CERTIFICATIONS

Associate of Science: California State University – San Bernardino, CA.

ASPE Certified Professional Estimator

Project Management: Primavera P6, Microsoft Project

Estimating: Quickpen, Fast Duct, Fast Pipe, Electric Bid Manager, and Xactimate Software

OSHA 30 Certified

Universal EPA

REFERENCES

Terry Huffman

Owner

Los Angeles Air Conditioning Inc.

909~596~7077

Roger Banuelos

Vice President

Seville Construction Services

714~639~9570

John Rawlings

Project Superintendent

KPRS Construction Inc.

760~567~6864



Contact this candidate