PROFESSIONAL SUMMARY
Having more about 13 yrs. of professional experience in the sphere of Engineering, Consulting & Construction Industry, I look forward to pursue my career to higher skill of excellence. My skills are enriched in diverse working environments with consulting organizations in Construction Supervision, Contract Management, Quantity Surveying, Detailed Estimation, Contracts, Cost Control, Cost Management Design Review, Planning Quality Assurance and Feasibility / Detailed Engineering of Highway and Highway Tunnel projects.
DETAILED TASKS ASSIGNED:
• Assist the Project Leader/Team Leader in his day-to-day functions.
• Manage all Cost, Planning & Document Control, integrated schedule and network for the EPC contract of the construction activity.
• To provide a full planning, work management and analysis of construction activities to achieve the target progress completing of the project within the contract period with acceleration of the construction program.
• ¬Reviewing contractors Interim Payment Certificate analysis with Quantity calculation as per the work done and the preparing the Variation Order with detail Estimate, evaluation and technical justification as per the FIDIC Condition. Responsible for controlling certain financial and/or contractual matters on project. Review of cost of the project at quarterly basis with detailed analysis of cost escalation prediction of escalation, taxes applicable for the project.
• Quantity calculation of various components of Tunnel, Highways and Structure, Review those with respect to the actual execution of work. Discharging any other work assigned to him by the Project Leader.
• Review of all Working Drawings, Quantities and supervision of Construction of - Highways, Tunnel Excavation by Drill and Blast method in Heading, Benching and Invert zone, Egress, Bridges, Culverts, ROB, Underpass, Highway maintenance and rehabilitation work, Reviewing AS Built Drawing with the actual execution by using latest software.
KEY QUALIFICATIONS
As Quantity Surveyor and Documentation Expert/ Estimator the responsibility for providing supervision and assistance to planners in the development and-integration of individual schedules into the total project plan. Responsible for controlling certain financial and/or contractual matters on project.
To coordinate contractor’s efforts in project planning, progress measurement and reporting, Responsible for total integration of schedule activities. Identifies schedule considerations and problems resulting from interdisciplinary or group restraints and interfaces.
To establish milestones for the total project and/or major portions of the project.
Manage all Cost, Planning & Document Control Dept’s. Develop of the detailed budget/cost allocations, Review of Cost of Project, control schedules cash flow. Develop and implemented procedures for Cost, Planning and Document Control for compliance with the contract and also for our own internal controls. Review and revise all reports, evaluate/amend and take any necessary actions required. Prepare and negotiate any variations relating to the client. Negotiate the scope, terms and conditions of the larger Sub-contracts and all claims from sub contractors. Prepare all reports for the Project Directors.
As quantity surveyor has the responsibility for providing accurate and timely cost advice throughout the duration of a project to a variety of organizations including the client and contractor preparing of the Variation Order by detail estimation of quantity and rate analysis with the help of SOR and standard data book and FIDIC Conditions.
Responsibilities updating time schedule the Project construction administrating manpower, progress and costs with Primavera Enterprise 3.5, and MS Office Excel, Access. Assigned to research and prepare preliminary project studies.
Review the cost of project by review of all the quantities from Working Drawings (Plan–Profile Drawings, Bridge and Culvert Drawings etc.) and other Standard Drawings of structure and analysis of them. Design review and estimation.
Forecasting the cost of project on review of project cost and with the rate of increase or decrease rate of variation in the project cost.
BOQ and Work Supervision for both Consultancy and contracting companies and reviewing of this as per the detail Drawing and As Built Drawing by using software i.e. Auto plotter, Road Estimator and Autocad2011.
Well conversant with IPC bills and Final Billing procedures of a road project and preparation of Monthly project progress reports Quarterly Progress Report and operation and maintenance manual other Technical Report.
In-depth knowledge with FIDIC Conditions of Contracting and International Standards / specifications of civil works and IRC, IS Codes.
Review of all Working Drawings, Quantities and supervision of Construction of – Tunnel, Highways, Bridges, Culverts, ROB, Underpass, Highway maintenance and rehabilitation work,
Effective coordination of the project works with the client BRO, European contractors and local Authorities. Working Expertise in Rohtang Highway Tunnel Projects at 10,105 feet height above sea level in Himalaya i.e. CONSTRUCTION OF 8.80 km LONG BI-DIRECTIONAL TRAFFIC DUAL LANE SINGLE BORE HIGHWAY TUNNEL OF WIDTH 10m AT FINISHED PAVEMENT LEVEL BY DRILLING & BLAST TECHNOLOGIES, ACROSS ROHTANG PASS NEAR MANALI IN HIMACHAL PRADESH (INDIA), Fully responsible for the Quantity Surveyor and Documentation Expert.
Effective coordination of the project work with the client, contractors and local Authorities. Working Expertise in the projects of NH-31, i.e. EW-II, WB6 and WB7, Fully responsible for the successfully completion of WB6 Project with in time limit in North East region that include all AS Built Drawing, Supporting Documents of As Built, Final Statement of Completion.
Detailed engineering designs of highways/expressway, Geometric Design of Highways with the help of IRC: SP23, IRC: 38 and these codes based self develop software, the software i.e. AUTOCAD2011, ROAD ESTIMATOR & AUTOPLOTTER, AUTOCAD CIVIL3D, MATHCAD.
Execution of all multistory construction services such as Field and Lab Material quality control, quantity survey, earthwork i.e. embankment filling, sub grade construction and granular sub base, wet mix macadam, Dense Bituminous Macadam, Bituminous Macadam, SDBC, Pave Quality Concrete, Dry Lean Concrete inclusive etc.
HIS IMPORTANT PROJECTS ARE SUMMARIZED AS BELOW
• Highway cum CADD Expert for NH-31 CONSTRUCTION PROJECT OF WIDENING THE TWO-LANE CARRIAGE WAY- 54 km TO FOUR-LANE FLEXIBLE AND RIGID PAVEMENTS IN THE STATE OF WEST BENGAL ON EAST WEST CORRIDOR UNDER PHASE II, PROGRAM OF NHDP
Client: NHAI, Government of India
• Senior engineer for SPECIAL REPAIR OF NH-31D FROM GHOSHPUKUR-BAGDOGRA km 551+000 TO 567+500 OF NH-31, SILIGURI-JALPAIGURI KM 97+000 TO 119+000 OF SH12, JALPAIGURI-MAINAGURI km 119+000 TO 138+720 SH-12A,MAINAGURI-DHUPGURI km 674+275 TO 688+400 OF NH-31, DHUPGURI-FALAKATA km 18+350 TO 6+430 OF MDR64 AND RESTORATION OF WASHOUT BALURGHAT TORSA WOODEN BRIDGE ON NH-31D (SONAPUR-FALAKATA SECTION) AT km749 OF NH-31 LENGTH OF BRIDGE 91 m
Client: NHAI, Government of India
• Assistant Resident Engineer for CONSTRUCTION SUPERVISION FOR IMPROVEMENT OF NAGPUR – WARDHA – JALNA –AURANGABAD – SINNER – MUMBAI ROAD (MSH-3 & MSH243) TO NH STANDARD MAHARASHTRA INCLUDING CONSTRUCTION OF MINOR BRIDGES AND ROB. PROJECT LENGTH: 95.50 km
Client: MSRDC Ltd., Government of India
• Site Engineer for IMPROVEMENT OF NAGPUR – WARDHA – JALNA –AURANGABAD – SINNER – MUMBAI ROAD (MSH-3 & MSH243) TO NH STANDARD MAHARASHTRA INCLUDING CONSTRUCTION OF MINOR BRIDGES AND ROB. PROJECT LENGTH: 95.50 km
Client: MSRDC Ltd. Government of India
MEMBERSHIP OF PROFESSIONAL SOCIETIES
• Member Indian Roads Congress.
• Member American Society of Civil Engineers, Baltimore, MD
• Member Worldhighways Magazine, UK
TECHNICAL SKILLS
Operating Systems : Windows Seven, Mac
Technical Tools : AUTO CAD 2012, AUTO CAD 3D, MATH CAD
Office Package : Microsoft Office 2010 Package - M.S Word, Excel (VB), PowerPoint, Outlook, Access
MS Project, Primavera P3 Open Plan/Cobra
EDUCATION
• Master in Civil Engineering (ongoing) from Apex institute of Technology, Mahatma Gandhi International Hindi University, India.
• Post Graduate Diploma in Business & Corporate Law (Contracts Law, Disput Resolution Law, Claim Management, Project Management) Ongoing, SYMBIOSIS, Pune
• Degree in Civil Engineering from NAGPUR UNIVERSITY, Maharashtra State India.
• Diploma in Civil & Rural Engineering from (Maharashtra State Board of Technical Education)
• ADCPSM (Advanced Diploma in Computer Programming & System Management), Indira Gandhi Memorial Institute (IGM), New Delhi
• AUTOCAD, Samiksha Softtech
TRAINING
• Requirement of Tunnel Seismic Profiling-TSP- Rohtang Tunnel South Portal South Portal-Near Vicinity of Seri-Nalla Fault Zone by M/s Amberg Technologies with Head Quarter BRO, D2-Consult-ICT, Strabag AG-Afcons JV at Head Quarter, Border Road Organisation, Himachal Pradesh, India .
• Quality Management-Assurance on NATM (New Austrian Tunneling Method) by Mr. Alfred Schulter, MD D2-Consult Austria with Chief Engineer, Head Quarter, Border Road Organisation (BRO), D2 Consult-ICT JV and Strabag AG–Afcons JV in Himachal Pradesh (India)
• Presentation on Geology and Geotech of Rohtang Highway Tunnel Project, by Dr. Wesley Saleria and Mr. RC Bhandari, D2-Consult-ICT with Head Quarter, Border Road Organisation (BRO), D2 Consult-ICT JV and Strabag AG–Afcons JV in Himachal Pradesh (India)
• Workshop on (Technical Program) CMEID-2007 (Construction Machineries & Equipment for Infrastructure Development) conducted by the Indian Institution of Engineers (India), Maharashtra State Center.
• Technical Interaction Camp (Various implementation methods in construction of Highways and Highway Structure), conducted by the Project Implementation Unit, National Highway Authority of India, West Bengal and Stanley Consultant Inc. West Bengal (India)
• Training in MX-Road, AUTOCAD2011, ROAD ESTIMATOR & AUTOPLOTTER, AUTOCAD CIVIL3D, MATHCAD, MS-Project,
• Technical Interaction and exhibit on scouring effects in Balurghat Bridge of NH-31D participants of Member Tech. NHAI New Delhi, CGM RO Kolkata, CGM Tech NHAI New Delhi, PD PIU West Bengal and Stanley Consultant Inc. West Bengal (India)
PROFESSIONAL EXPERIENCE
1. July 2011 – till date D2 CONSULT-ICT JV. NEW DELHI. INDIA
Title: Quantity Surveyor and Documentation Expert
Project: CONSTRUCTION OF 8.80 km LONG BI-DIRECTIONAL TRAFFIC DUAL LANE SINGLE BORE HIGHWAY TUNNEL OF WIDTH 10m AT FINISHED PAVEMENT LEVEL BY DRILLING & BLAST TECHNOLOGIES, ACROSS ROHTANG PASS NEAR MANALI IN HIMACHAL PRADESH (INDIA)
Client: Border Road Organisation, Ministry of Defense, Government of India
Cost of Project : INR 10,553 million
EURO 71.00 million
Job Responsibility and Accomplishments:
• As Quantity surveyor and Documentation Expert has the responsibility for providing accurate and timely cost advice throughout the duration of a project to a variety of organizations including the client and contractor.
• Forecasting cost and values of the project by review of all the quantities from FCC Drawings and other Standard Drawings of structure and Cost of the project work executed of the excavation as per the change Rock Class of Tunnel and construction of Tunnel Design review and detailed analysis of other factors affecting the project cost i.e. Escalation, Taxations cost analysis of the same and prediction w. r .t. probability risk factor by matrix and exponential method.
• To assess to the financial effect of variations and other adjustments to the contract that have been issued, or are expected to be issued, and require a good deal of expertise to produce accurate figures and costs.
• Responsible for controlling certain financial and/or contractual matters on project. Monitor and report on costs from allowable and budgets.
• keep track of labour, materials, plant and formwork ensuring the costs are within the allowable zone and reporting any anomalies
• Report costs on a monthly basis, detailing cost reconciliations
• Attempts are made to maximize the interim valuations and include items and materials ahead of their incorporation of the works. Evaluation and assertion of quality assurance system and Measurement Book of partial and final bill preparation.
• By using the Bills Of Quantities as the reference, the value of the work can be calculated. Including and paying for work as part of the valuation does not indicate.
• To review of price adjustment in Indian Rupee and Euro. Review of the same change in series. To prepare the valuation for the client’s quantity to check. It is important - that the figures are checked by the quantity surveyor as any overpayment could prove to be embarrassing.
• Review in details Entry Tax, VAT and Recovery of Mobilisation Advance Payment Guarantee maintaining Advance payment Guarantee amount in INR and Euro as per the FIDIC Condition of Contract.
• Review of Contractors claim and Entitlements, preparation of detailed report and detailed chronology on the Claim and Entitlements base on the facts and exhibits with respect to FIDIC and Condition of Contract of the project.
• Preparing detailed project Monthly Progress Report, Quarterly Progress Report and Operation and Maintenance Manual and preparing the Status Reports at various stages of the construction and financial activities for the submission to client.
• Fully responsible for preparing and certification of IPC bills, Final Bill procedures and Variation Orders with detail rate analysis with the help of Schedule of Rate of a CPWD, PWD and NHAI and with detailed technical exhibits and justification.
• Checking the detailed design against the outline and scheme design to detect major changes carrying out a cost check of each cost target using approximate quantities.
• Checking process is particularly important as the project reaches the final stages; the final account should indicate an amount due to the contractor, not an amount due from the contractor.
• Provide assistance to Project Leader in all project matters with complete knowledge of FIDIC Conditions of Contract and certify contractor payment bills, Variation Order and issue completion certificates.
• Review current status of both Engineering and Procurement for the Project prepare a revised detailed Level 3 control schedule (Primavera P3) incorporating the physical status and all change orders. This was part of the integrated schedule and network for the EPC contract. Assist the cost engineer in the revised control budget. Revise the drawing and document register used at level 5 to ensure all were identified and entered for the basis of scope. Review and advice on actions required for recovery on procurement schedules from the contractors, to meet delivery at site for the onsite required dates. Prepare scenarios to show the impact of Design Change Notices to the completion of the Project.
• Manage all Cost, Planning & Document Control Dept's. Develop of the detailed budget/cost allocations, control schedules (Primavera P3). Develop and implemented procedures for Cost, Planning and Document Control for compliance with the contract and also for our own internal controls. Review and revise all reports, evaluate/amend and take any necessary actions required. Prepare and negotiate any variations relating to the client. Negotiate the scope, terms and conditions of the larger Sub-contracts and all claims from sub contractors. Prepare all reports for the Project Directors.
• To coordinate contractor's efforts in project planning, progress measurement and reporting, Responsible for total integration of schedule activities. Identifies schedule considerations and problems resulting from interdisciplinary or group restraints and interfaces.
• To establish milestones for the total project and/or major portions of the project.
• Geometric Designing of road with the help of IRC: SP23 & IRC: 38 and these codes based software, with coordination of AutoCAD, Auto plotter Road Estimator software, MX Road and check the practical Implementation at site, and ensure Quality & Quantity of execution of works as per specifications and BOQs.
• Review As Built Drawings of Highways and Structure for final payments and giving completion certificates using AutoCAD version 2011 and AutoCAD Civil 3D.
• Review the monthly progress on the basis of CPIS (Computer Programming Information System) Preparing detailed project progress of CPIS for the review and up gradation of status of the project.
Nov2007 – June 2011 STANLEY CONSULTANT INC., NEW DELHI. INDIA
Title: Highway Cum CADD Expert
Project: Project Management Consultancy Service for the construction project of widening the two-lane carriage way- 54 km to four-lane flexible and rigid pavements in the State of West Bengal on East West Corridor under phase II, program of NHDP.
Client: National Highway Authority of India, Government of India
Cost of Project: 4,520 million
Job Responsibility and Accomplishments:
• Review of all Working Drawings (Plan–Profile Drawings, Bridge and Culvert Drawings etc.) and other Standard Drawings of structure and analysis. Design review and estimation.
• Geometric Designing of road with the help of IRC: SP23 & IRC: 38 and these codes based software, with coordination of AutoCAD, Auto plotter Road Estimator software, MX Road and check the practical Implementation at site, and ensure Quality & Quantity of execution of works as per specifications and BOQs.
• Fixing of Highway alignment, Intersections of Highway and design of curves with related all road site furniture, including design.
• Provide assistance to Team Leader in all project matters with complete knowledge of FIDIC Conditions of Contract and certify contractor payment bills and issue completion certificates.
• In addition to Highway cum CADD Expert, discharging the responsibility of Bridge Engineer in WB7 contract package as Senior Engineer.
• Construction supervision, including survey of road with GSB, WMM, BBM, DBM, BM, SDBC,PMC, PQC, DLC and BC, which requires in-depth knowledge of laboratory testing and test standards.
• Review As Built Drawings of Highways and Structure for final payments and giving completion certificates using AutoCAD version 2011 and AutoCAD Civil 3D.
• Represent the interest of the client vis-à-vis with the contractor in the project matters. Prepare Final Completion Certificate for package- EW-II, WB6
• Evaluation and assertion of quality assurance system and Measurement Book of partial and final bill preparation.
• Fully responsible for the successfully completion of WB6 Project with in time limit with all AS Built Drawing, Supporting Documents of As Built, Final Statement of Completion.
• Preparing detailed project progress report, QPR for the submission to client.
• Review the monthly progress on the basis of CPIS (Computer Programming Information System) Preparing detailed project progress of CPIS for the review and up gradation of status of the project.
• Discharging the responsibility of Senior Engineer for special repair of NH-31D from Ghoshpukur-Bagdogra km 551+000 to 567+500 of NH-31, Siliguri-Jalpaiguri km 97+000 to 119+000 of SH12, Jalpaiguri-Mainaguri km 119+000 to 138+720 SH-12A,Mainaguri-Dhupguri km 674+275 to 688+400 of NH-31,Dhupguri-Falakata km 18+350 to 6+430 of MDR64
• As Senior Engineer Pkg. Restoration of washout Balurghat Torsa Wooden Bridge on NH-31D (Sonapur-Falakata section) at km749 of NH-31length 91m, Redesign of Bridge of Steel Structure supervision.
Apr 2007 – Nov 2007 LEA ASSOCIATES SOUTH ASIA PVT. LTD., NEW DELHI.
Title: ASSISTANT ENGINEER and Serving in capacity as RESIDENT ENGINEER
Project: Project Management Consultancy Service for the construction project of widening of the two lane carriage way- 95.5 km of (MSH-3 & MSH243) to four lane C.W. -2 km, including Construction of minor bridges and ROB.
Client: MSRDC Ltd., Maharashtra (Govt.)
Cost of Project: 700 million,
Job Responsibility and Accomplishments:
Review of all Work Drawings, Estimates, Designs and DPR assisting Senior Resident Engineer and Team Leader.
• Review of the Final Bill as per As Built Drawings for final payments and giving completion certificates.
• Represented the interest of the client vis-à-vis with the contractor in any matter related to the construction of project. Prepared Final Completion Certificate for package-IB, package-1A(BSW), package-II (WB)
• Effective coordination of the project work with the client, contractors and local Authorities. Supervision and execution of work with proper allocation of responsibilities to the individual field Engineers and Surveyors.
• Preparing detailed project progress report for the submission to client.
• Prepare Final Completion Certificate for package-IB, 1A (BSW), PII (WB) Evaluation and assertion of quality assurance system, prepare Measurement Book of partial and final Bill.
• Construction supervision, including survey of road and structural works, which requires in-depth knowledge of laboratory testing and test standards.
• Construction supervision, including survey of road with GSB, WMM, BBM, DBM, BM, PMC and BC, which requires in-depth knowledge of laboratory testing and test standards. -
• Provide assistance to Team Leader in all project matters with complete knowledge of FIDIC Conditions of Contract and certify contractor payment bills and issue completion certificates.
Apr 2006 – Mar 2007 LEA ASSOCIATES SOUTH ASIA PVT. LTD., NEW DELHI
Title: HIGHWAY ENGINEER (Same Project)
Job Responsibility and Accomplishments:
• Supervision, Quality Control & Billing for Construction of ROB as per GAD. Pre-stressed and post tensioned Launching of concrete girders.
Geometric Designing of road with the help of IRC: SP23 & IRC: 38 and these codes based software, with coordination of AutoCAD, Auto plotter Road Estimator software.
May 2003 – Mar 2006 LEA ASSOCIATES SOUTH ASIA PVT. LTD., NEW DELHI. Title: Assistant Engineer Highways (Same Project)
Job Responsibility and Accomplishments:
• Review of designs, evaluation and assertion of quality assurance system, contract management, assessment and recommendation of contractor’s claims etc.
• Evaluating cost and values of the project by review of all the quantities from Working Drawings (Plan–Profile Drawings, Intersection, Bridge and Culvert Drawings etc.) and other Standard Drawings of structure and analysis. Design review and estimation.
• As Assistant Engineer has the responsibility for providing accurate and timely cost advice throughout the duration of a project to a variety of organizations including the client and contractor,
• Preparing detailed project Monthly progress report, Quarterly Progress Report and preparing the status reports at various stages of the construction and financial activities.
• Evaluation and assertion of quality assurance system, prepare Interim Bill of the project, with their Variation Order, Rate Analysis with SOR, comparison statement and Recording in Measurement Books for the submission to client.
• Assist the Team Leader in his day-to-day functions of project such as Geometric Designing of road with the help of IRC: SP23 & IRC: 38 and these codes based software, with coordination of AutoCAD, Auto plotter Road Estimator software, Inspection of construction material sources (quarries, borrow areas, riverbeds, water resources etc.) and ascertain their suitability as per relevant standards and other by him.
3. Feb 2000 – Apr 2003 S.L. KHATRI CONSTRUCTION CO.
Title: SITE ENGINEER, HIGHWAYS
Project: Contractor side project for ‘Improvement to Nagpur – Wardha – Jalna –Aurangabad – Sinner – Mumbai road to NH Standard’
Client: MSRDC Ltd., Maharashtra (Govt. of India)
Job Responsibility and Accomplishments:
• Monitor the progress and quality of all works done under the ‘Contract Maintenance System’ which included Sub grade, Granular sub-base, Wet Mix Macadam, DBM, Bituminous Bound Macadam, Bituminous Macadam, Pre Mix Carpet SDBC with Liquid Seal Coat Premix seal coat etc. with respect to MORTH & Specifications.
• Geometric design of Road. Planning, execution and supervision of highway works and selection of Quarry for Aggregate.
• Evaluation and assertion of quality assurance system, prepare Running Bill, MB Recording.
• Calibration of the Batch Mix Plant, Hot Mix and Wet Mix Plants & Handling of various Lab apparatus.
• Dealing with Sub contractors & material Suppliers.
• Field testing and ensure procedures as per specifications.
PERSONAL PROFILE
Name : Abhay Namdeorao Mude
Age, DOB : 33yrs, 13/12/1978
Nationality : Indian
Marital Status : Married
Languages known : English, Hindi, Marathi, Bengali (Complete proficiency)