NAGESH ANANTHRAO CHILVERY
PHONE +91-916******* • E - MAIL ******.********@*****.***
PROFESSIONAL SUMMARY
* ***** ** ********** ** a Project Engineer. Includes various stages of Project conceptualization, implementation & execution right up to the stage of commissioning
Product Line –
o Product Knowledge: Siemens - S7-300, S7-400
o Software Knowledge: Siemens - PCS7, STEP7, WinCC, WinCC Flexible
Work Outline –
o Attending kick off meetings, analysing processes and Building Product Solutions follow up with customer on a regular basis and finally commissioning of the production facility against a time frame.
Modularization & standardization of automation solutions
Industry Background –
o Chemical Process (Air Separation Unit, Paint Manufacturing, Precipitation Silica)
STRENGTHS INCLUDE
A fast Learner and quick in adapting to newer technologies.
Good analytical and presentation skills.
Good interpersonal and communication skills.
Ability to work in groups as well as independently.
EXPERIENCE
Currently working as Senior Executive Engineer with Siemens Ltd. since July 2008. (Currently working in Chemical Group of Solution business for Process Automation)
ACHIEVEMENTS
Single handedly completed the software development and commissioning of:-
KANSAI NEROLAC PAINTS LTD.
INSILCO INDUSTRIES LTD.
BOCI LTD (JSL, TALOJA)
Implemented ROC (Remote Operation Control) system for M/s BOC at JSL & Taloja Plant. This system is first time introduced in India.
INITIATIVES
Release of Application Notes on products to simplify it further & for ease of understanding.
Accelerated project execution by reducing turnaround time
PROJECTS
Project: KNPL (2009 - 2010)
Client: KANSAI NEROLAC PAINTS LTD (HOSUR, INDIA)
Process: Water Based Paint Manufacturing Plant.
System: Siemens PLC CPU 317 with an IO Basis of 800 I/Os
System Config: 1 ESOS (Engineering Station + Operator Station), 1 OS (Operator Station).
Engineering: SIMATIC BATCH V6.2, Asi-Link I/O Configuration, Web Navigator.
Responsibilities:
Software development for the complete Paint process
Implementation of Asi-Link I/O Communication & Web Navigator.
S7300-S200 Communication, S7300-S7400 Communication,
Commissioning of the plant
Team Size: 3
* * *
Project: INSILCO INDUSTRIES LTD (2010)
Client: INSILCO INDUSTRIES LTD (GAJRAULA,INDIA)
Process: It’s one of the leading producers of precipitated silica by using Precipitation, Acidification and pH controlling techniques.
System: Siemens DCS CPU 417
System Config: 1 ES (Engineering Station), 2 OS Servers (Operator Station)
Engineering: PCS7 V6.1 SP3
Responsibilities:
Software development for the complete process.
Commissioning of the plant
Team Size: 2
* * *
Project: BOC-JSL (2010)
Client: BOC Ltd. (British Oxygen Company)
Process: It’s an Air Separation Unit used to separate Oxygen, Nitrogen & Argon from Raw Air. This process involves various stages Air Purification, Air Compression, Heat Exchange & Cold box operation.
System: Siemens DCS CPU 417H with an IO Basis of 2000 I/Os
System Config: 1 ES (Engineering Station), 1 Redundant OS Server (Operator Station), 1 Redundant ROC Servers and 2 OS Clients
Engineering: PCS7 V7.1 SP2
Responsibilities:
Software development for the complete process
Implementation of ROC (Remote Operation Centre) System
Excel based MIS Report Development
Commissioning of the plant
Team Size: 3
* * *
Project: BOC-TALOJA (2012)
Client: BOC Ltd. (British Oxygen Company)
Process: It’s an Air Separation Unit used to separate Oxygen, Nitrogen & Argon from Raw Air. This process involves various stages Air Purification, Air Compression, Heat Exchange & Cold box operation.
System: Siemens DCS CPU 417H with an IO Basis of 2000 I/Os
System Config: 1 ES (Engineering Station), 1 Redundant OS Server (Operator Station), 1 Redundant ROC Servers and 2 OS Clients
Engineering: PCS7 V7.1 SP2
Responsibilities:
Software development for the complete process
Implementation of ROC (Remote Operation Centre) System
Excel based MIS Report Development
Commissioning of the plant
Team Size: 3
* * *
Project: EPPC PROPYLENE & POLYPROPYLENE, EGYPT (2008)
Client: UHDE India as Client & EPP, Egypt as End Client
Process: Production of Propylene & Polypropylene, Operation & Utility Section
System: Siemens DCS CPU 417
System Config: 4 ES (Engineering Station), 5 Redundant OS Servers and 14 OS Clients
Engineering: PCS7 V7.0 SP1
Responsibilities:
Participated in Hardware FAT for all sections i.e. O&U, PDH, PP
Team Size: 12
* * *
EDUCATION
B.E. (Instrumentation) – First Class (2008), Mumbai University
Personal Profile
Date of Birth: 21st March 1987
Sex: Male
Marital Status: Single
Languages Known: English, Hindi & Marathi
Nationality: Indian
Address: Type-1A/6A, Tata Power Housing Colony, Aziz Baug, Chembur, Mumbai, India-400074
Passport Details: H1004885, Validity – 05/10/2018
DATE
PLACE
NAGESH ANANTHRAO CHILVERY