RESUME
JOSEPH PALCULICH
**** *** ***** ***** *********, Ca. 92028
Tel. 951-***-**** Email- ******.*.*********@*****.***
QUALIFICATIONS
Supervision of all aspects of construction phases for commercial, residential, and public work projects.
Experienced in mechanical and general construction.
Machinist in private machine shops as well as the federal government.
EXPERIENCE
2000 to Present
Performed duties of Superintendent, Quality Control, and Safety for mechanical and general construction jobs at:
NAWS China Lake Ridgecrest,Ca. ($350K – 10/11 to 12/11)
Flight line Hot Refueling project to include backfill and compaction of 5000 cubic yards of dirt,
remove and replace concrete pad for fuel tank, remove, repair, and re-install 2000 gallon fuel tank, remove and install new electrical controls and grounding, and install new guardrail system for fuel lines protection.
Superintendent / Quality Control /SSHO – Allen Engineering
Ref: Tom Dorfmiester (Government FEAD Engineering Supervisor)
Barstow / NEBO Base Barstow, Ca. ($800K – 05/11 to 10/11)
Building # S-576 Ground up pre-engineered automotive repair facility. Complete ground up facility to include underground electrical trenching for tie in to existing transformer, new housekeeping pads for electrical transformer, new housekeeping pad for air compressor, new bollard protection, all new electrical for lighting including light fixtures, switches, and recepticles, new air lines with quick disconnect hook ups, new water lines with hose bibs and backflow devices, building sinage, new doors with all hardware and closers, new water fountains, and new lockable fire extinguisher cabinets with extinguishers.
Superintendent – Allen Engineering
Ref: Bill Kearl (Government FEAD Engineer Supervisor) 760-***-****
Naval Amphibious Base Coronado,Ca. ($3.5M – 8/10 to 3/11)
Bldg. 506 Renovation of Medical and Dental Clinic
Complete renovation to include new HVAC system, exhaust systems, chiller, boiler, electrical switchgear , electrical lighting, electrical power switches and recepticles, back up generator, indoor fire sprinkler system to include outdoor backflow preventor, fire alarm panel, direct digital controls, communication and data system, dental vacuum system, bathrooms, plumbing, various types of flooring, t-grid ceilings, hard lid ceilings, washable panel ceilings, specialty cabinetry, doors and hardware, indoor and outdoor sinage, outdoor railing for loading docks and walkway ramps, window blinds, indoor and outdoor painting, and roofing repair.
Quality Control Manager – Hal Hays Construction
Ref: Brian Javier (Government FEAD Engineer Supervisor) 619-***-****
Hugo Moreno (Project Architect) GMH Associates 619-***-****
Various Roofing MACC Projects ($18M - 2/08 to 5/10)
Replace various kinds of roofing systems to include tile, asphalt shingle, steel seam, modified built up, hot mop, and cold applied.
Twentynine Palms, Camp Pendleton, Seal Beach, Moreno Valley, Norco, San Diego
Superintendent / Quality Control Manager / SSHO – VT Griffin
Ref: Mark Sarles (Western Region Project Manager) 760-***-****
DeCA Commissary Refrigeration / Architectural Upgrades ($4.5M – 2/07 to 2/08)
West Point, New York
Upgrade of all refrigeration, HVAC, electrical power and lighting, plumbing, fire sprinkler system, 52 product cases replacement, and 18 gondola shelving relocation. Included underground utilities, as well as architectural,
roofing repair, replacement of walls, soffits, ceilings and chases.
Superintendent / SSHO - VT Griffin
Ref: Maurice Elliott (North East Project Manger) 203-***-****
USMC Base Camp Pendleton Various Mechanical Projects ($9.5M – 3/06 to 2/07)
Included were: A new sewage lift station, various underground water valve replacements, roof exhaust systems, mess hall air curtains, addition of A/C units to various administration buildings ( 1 ton to 100 ton capacity ) to include electrical, underground gas line replacement, and various small projects from light fixtures to basic plumbing fixtures.
Quality Control Manager- VT Griffin
Ref: Reuben Ceballos (Government FEAD Engineer) 760-***-****
Naval Amphibious Base Coronado, Ca.
Bldg. 220 Construct Mezzanines ($800K – 3/05 to 3/06)
Construct a new I Beam steel indoor structure for work stations and equipment storage to support Navy Seals training. Installation of new plumbing, electrical, pneumatic air line system, spill containment area for fluids, and an attached two story support office structure with HVAC, electrical lighting, switches and recepticles, doors and windows, vinyl and carpet flooring.
Quality Control Manager- TPI Construction
Ref: Dave Wilkens (Government FEAD Engineer) 619-***-****
March Air Reserve Base, Ca.
Bldg. 355 Alter Life Support Building Improvements ($1.5M – 2/04 to 3/05)
Convert an existing airplane hanger building to a workshop with offices, showers, bathrooms, break room, with an I beam steel mechanical equipment mezzanine to support a 30 ton HVAC system and electrical control panels.
Quality Control Manager- TPI Construction
Ref: Joe Flynn (Government FEAD Engineer Supervisor) 951-***-****
MCAS Miramar Bldg. 7550, Miramar, Ca.
Centigrade Inc. - HVAC Installation Foreman ($1.75M – 11/02 to 2/04)
New installation of a 250 ton chiller, 9 roof top air handlers, 25 VAV units, a de-humidifier unit, with all electrical and plumbing.
Centigrade Inc. HVAC Superintendent / Quality Control / SSHO
Ref: Chuck Greenan Jr. (Government FEAD Engineer) 858-***-****
Point Mugu Naval Base, Ventura, Ca.
101 Capehart Houses Heating Installation, Base Housing ($1.2M – 08/01 to 11/02)
Installation of 101 new heat furnaces, all duct work, thermostats, and 500 Solar tube skylights.
Centigrade Inc. - HVAC Installation Foreman
Ref: Jess Montooth (Regional Project Manager) 805-***-****
MCAGCC Twentynine Palms, Ca.
Remove/Replace Exhaust Systems and Barometric Dampers in 50 Buildings ($700K – 03/00 to 08/01)
Remove old roof exhaust fans, replace with new, hook up electrical, and test rotation. Install new dampers.
Centigrade Inc.- HVAC Installation Foreman
Ref: Dave LaFrancesca (Government FEAD Engineer) 760-***-****
Computer Management Systems Utilized
Orbits, Web CM, RMS
Experience – 1995 to 2000
Construction Foreman for Centigrade Inc. Responsible for Job Coordination and Field Quality Control.
Experience – 1980 to 1995
Machinist Foreman and Service Coordinator for California Refurbishing Corp. Soda System installation /repair.
EDUCATION
4 Years – Refrigeration Service Engineers Society
(Air Conditioning, Refrigeration, Mechanical, Electrical, Plumbing)
3 Years – Regional Occupational Trades Program College Courses
(Air Conditioning, Refrigeration, Heating, Solar, Plumbing, Electrical, Carpentry)
2 Years - Palomar College, San Marcos, Ca.
(General Business Math and Business Management)
(Basic Welding, Soldering, Brazing)
S.D.G.E. Courses on Energy Efficiency Management Systems on
(HVAC Code, Electrical Code, and Plumbing Code Compliance)
High School Graduate from Fallbrook Union H.S., Fallbrook, California
(General course studies; including Auto Mechanics, Carpentry, and Electronics)
CERTIFICATES
U.S.A.C.E. Construction Quality Management for Contractors, EM385 40 Hour Safety Course,
OSHA 30 Hour and 10 Hour Safety Course, Confined Space Competent Safety Person,
Fall Protection Safety Course, Red Cross CPR and First Aid Course, Forklift Safety Course,
F.O.D. Course – Foreign Object Debris for Airfield Safety, N.A.S.A. Confined Space Entry Training,
ECATTS – Environmental Compliance Assessment Training and Tracking System