JUANCHITO C. MEDELLIN
Current Location: Block ***, 07-315
Bukit Batok East Avenue 3, Singapore 650280
Mobile Number: +65 97164647
**********@*****.***
EDUCATION BS in Electrical Engineering, March 1996
University of Mindanao, Davao City, Philippines
Registered Electrical Engineer - April 1997 License No. 0010466
Career Summary:
Over thirteen years Project Execution, Supervision on Electrical Installation, works with Electric distribution and Petrochemical Projects, Inspection and Installation of HV/LV switchgear, and Operation & Maintenance of Electrical Equipment. Monitoring, trouble shooting, reports generation, hands-on maintenance, Installation, Inspection and Testing/Commissioning of electrical and field instrument equipment. I also have several skills training which I believe aided my professional growth as a licensed Electrical Engineer. I am professionally meticulous driven and output oriented.
SKILLS:
Microsoft Office Application (Excel, Word, Access, Power Point, Outlook), Distribution System Loss Segregator, AutoCAD, Synergee Electric Engineering Analysis, ETAP Powerstation, Power quality monitoring software’s such as Ametek Load Logger, Switchgear and Transmission line, Distribution equipment thermal scanner Thermoviewer X-15. GE Metermate, GE Multilin Software for programming, Pancea Control, Calport 100/200 meter calibrator, Primary & Secondary injector test set, Hi-pot,Megger, and other Electrical and Instrument test Equipment.
Work Experience:
Instrument Inspector May 23, 2010 – Present
Singapore Parallel Train (SPT) Project
Exxon Mobil Chemical Singapore, 100 Jurong Island, Singapore
• Client representative assigned to Olefins and Utilities, responsible and monitor the works of Contractors.
• Responsible for all field inspection and verification of field instrument installation including electrical panel for instrument, according to ExxonMobil global and international practice.
• Conduct inspection such as Control and On-off valves, Transmitters (Flow, Temperature, Level, Pressure, Vibration and others)
• Witness field Calibration and Loop checking.
• Check Loop Folder prior to Loop checking.
• Visual inspection of the instruments to determine any defects or damage and ensure compliance to specification.
• Liaise with Contractor on all Quality aspects of the project.
• Coordinate and supervision at contractor quality work.
• Ensure implementation of company Quality plans throughout the Project;
• Solve any Quality related problems that may arise.
• Inspection at systems and signed off MCR’s (mechanical completion records) for instrument calibration, installation, cable installation and termination, following project specification and standard of quality.
• Raising punch lists and monitoring punch lists clearing.
• Supervision and witness at instrument calibration in calibration shop or in field to ensure that all instrument checked are as per data sheet and in conformity with project standard.
• Visual inspection for complete and correct installation of instruments, cables, and junction boxes.
• Visual inspection for complete and correct installation of unit control panels, systems and termination cabinets.
• Detailed visual inspection of all hazardous area Ex certified instrumentation to ensure installation and equipment meet the relevant standards.
• Supervision and witness at pressure testing of air supply tubing, pneumatic impulse and hydraulic instrument tubing.
• Inspection and supervision that work is done as per drawings and documentation and, when is necessary, it is,, as built’-ed.
Electrical Inspector March 21, 2010 – April 7, 2011
Sanko Singapore (PTE) LTD., Exxon Mobil-Singapore Parallel Train (SPT) Project (Electrical), Jurong Island, Singapore
• Responsible for all field quality verification and inspection activities according to method of statement, inspection and test plans (ITP) in assigned area.
• Surveillance and inspect of on-going electrical installations as per standard / drawing and project specifications.
• Prepare Dossier/Turn-Over for the Client.
• Ensure the effective coordination with the client related to inspection, testing activities and documentation.
• Coordinate and assist to other Engineering discipline to resolve or prevent problems related to inspection and testing activities to meet schedule and avoid any delay of activities.
• Check installation of earthing, lighting protection (earth rod, earth bus bar, earth ring bus bar, cable earthing and earth terminals) as per approved project specification and local or international code and standard.
• Loop impedance test, luminance testing and cathodic protection testing.
• Motor preservation and MV-Motor PI test (winding resistance and IRT test, RTD’s, space heater, and thermistor)
• Transformer oil testing
• Conduct and Inspection of Winding Transformer Testing.
• Inspections of Switchgear Testing such as Ducter Test, HI-POT Test, CT Test, and VT Test.
• Check Control LV, MV & HV cable prior to installation, prior to backfilling as per Quality Control procedure.
• Check cable tray, cable ladder installation as per standard and specification.
• Check cable glanding and termination as per standard and manufacturer recommendation.
• Check installation of electrical equipment, MCC, control panel, switchgear, transformers, neutral earthing resistor, local control panel, capacitor bank, UPS and cathodic protection.
• Check installation of lighting panel, junction boxes, light and power conduits.
• Witness and assist pre-commissioning & commissioning of switchgear, motor control center, motors, transformers, neutral earthing resistors.
• Document all the testing result in project approved installation and inspection test.
• Prepare all As-Built Drawings for Inspection.
• Invite client for witness and hold point in inspection / test.
• Keep and maintain all Quality Control Report.
Instrument Inspector September 2008 - March 2010
Sanko Singapore (PTE) LTD., Shell Houdini Ethylene Cracker Complex Project (Instrumentation), Pulau Ular, Singapore
• Responsible in field quality verification and inspection activities according to method of statement, inspection and test plans (ITP) such as cable pulling and termination of Instrument cables, installation of cable tray, installation of field mounted Instrument such as Pressure, Flow, Temperature, Level transmitter, CCTV, Flame and Gas detector, witness calibration check of Instrument to higher accuracy and standards for process control measurement.
• Internal surveillance inspection during installation phase.
• Preparation and documentation of Instrument check sheet as per ITP requirements.
• Preparation of Field Inspection Request (FIR) and attend field inspection and assist client recommendation and comments for immediate rectification.
• Verification of Site Instructions and Field Change Sheet issued by the Engineering for modification or rectification.
• Responsible for the preparation of all inspection report in assign area prior for the acceptance of the client.
• Review of all instrument accepted documents such as Instrument data sheet, vendor drawings, Piping and Instrument diagram with latest revisions, quality control inspection report documents signed by EPCM QC inspector and Owner representatives.
• Responsible for punch list clearing to ensure that the installation of instruments are complete and accepted by the client.
• Check/inspections of materials vendor/seller delivery at site.
• Prepare the QC forms and attach all pertaining documents for smooth inspection at the site.
• Ensures that all construction materials are approved for used.
• Ensures all instrument installed complies with specification in data sheet.
Technical Supervisor, April 2001-September 2008
Davao Del Sur Electric Cooperative, Inc. (DASURECO)
Digos City, Philippines
• Develops plans, specifications, and cost estimates for the installation, maintenance, repair and expansion of the Electric Coop 69/13.2KV electrical overhead and underground distribution system, including substation.
• Inspect and Supervise in installation of HV/MV electrical equipment and related facilities.
• Hands on testing and calibration of Electronic and Electro-mechanical relays
• Hands on testing and calibration of Electronic and Electro-mechanical single phase and poly phase kilowatt-hour meters.
• Monitor the electric system performance.
• Supervise Power Switching operation such as Breaker, recloser, regulator, capacitors, load break switches, power fuses and disconnecting switches.
• Prepare job studies, reports and recommendations pertaining to the overall electric energy system operation.
• Advise developers and contractors regarding technical requirements.
• Respond to emergency conditions and assist in restoring the electrical distribution system to normal operation.
• Respond to citizen complaints and questions.
• Coordinate the work of crews engaged in the operation and maintenance of structures, distribution lines and substations.
• Develop specifications for material purchases and construction standards.
• Recommend construction practices and procedures.
• Calculate customer loads for sizing transformer banks and services.
• Perform system planning studies.
• Meet with customers/contractors to identify and solve voltage and construction problems.
• Manage the maintenance and capital improvements of the distribution system, substations, switch yards, sectionalizing devices, relays, and communication systems.
• Manage the operation and maintenance of a six (6) Powers substation
• Perform system protection and coordination studies.
• Lead Junior Engineer in preparation of distribution system loss segregation.
Electrical Engineer, September 1999-April 2001
P.G. ANG AND SON RICE &CORNMILL, INC.
General Santos City, Philippines
• Performs designs, estimates and supervision for the implementation of plan for the ongoing construction of the expansion Apopong Rice milling plant.
• Computation of the desired transformer size and cables for the entire system and voltage drop computation for cables not to exceed 3%.
• Estimation of the desired materials needed for the project.
• Supervision for the scope of works needed for the project which include cable pulling, piping, cable insulation testing (meggering), panel board erection and any related electrical works.
• Supervise and manning for the erection and construction Motor Control Center and Central Control Room.
• Panel board installations, meggering, cabling and termination of cables.
• Erection of medium voltage switchgear 13.2 kV and installation, cabling and termination of transformer, 3-333 kva, 13.2kv, 480/240 volt oil cooled.
Senior Engineer, October 1997- May 1998
NATIONAL POWER CORPORATION (NPC)
Southwestern Mindanao Area, Philippines
• Operate & Control 50 & 30 MVA power transformer which both have a primary voltage of 138KV stepped-down to 69KV.
• Assist Technical Services Division during testing of 138/69KV Power / Instrument transformer, Circuit Breakers, Disconnecting switches.
• Implements/ Coordinates Maintenance schedule on 138KV substation and Transmission lines.
• Conduct daily meter reading and report to Load dispatching area.(KWHR, AMP,MW)
• Conduct daily checking of substation equipments at switchyard for preventive action and maintenance.
• Prepare Monthly Power Interruption Report.
• Coordinate line maintenance in sectionalizing the line.
COMPETENCY AND TRAINING CERTIFICATE
Safety Orientation Course (Oil & Petrochemical)
NUTC Workplace Safety & Health Training Centre, Singapore
Professional Supervisory Course Training
Learning Hub / Shell Houdini ECC Project, ECC Training Center, Pulau Ular, Singapore
Hawke Cable Glands Training
Hawke Singapore
Train the Trainers Course (HEARTS &MINDS)
Shell Eastern Petroleum Corporation (SEPC), Singapore
Building Construction Supervisors Safety Course
NUTC Workplace Safety & Health Training Centre, Singapore
Power Distribution System Modeling & Analysis
University of the Philippines, Diliman, Quezon City Philippines
a) Power System Reliability Analysis
b) Short Circuit Analysis
c) System Loss Analysis
d) Load Flow Analysis
Distribution Utility Economics
University of the Philippines, Diliman, Quezon City, Phlippines
PERSONAL DATA
Sex : Male
Birth Date : June 24, 1972
Civil Status : Married
Age : 39
Religion : Baptist
Nationality : Filipino