Resume for Robert Carter, *** Rock Road. apt *** Hawthorne NJ 07506 Ph 973-***-****
Pg. 1 0f 2 pages. cell 201-***-**** ********@*********.***
Summary of Qualifications.
• Project manager and estimator of architectural metal and glass work from concept to final installation.
• Innovative designs for metal panels, curtain wall, railings and storefronts & building entrances.
• M S Project scheduling software for all of my projects.
• Purchase orders for all my materials and subcontractors for my projects.
02-14-11 to 07-26-11 Precision Glass & Metal Works Co. Inc
• Estimator for union architectural metal and glass work projects ranging from $50,000 to $1,500,000. Tom Musumeci manager.
05-08-05 to 04-26-09 Clifton Glass & Architectural Metal.
• Project manager for union architectural metal and glass projects in NYC and NJ.
• Scheduling, shop drawing review, job meetings, design, purchasing and estimating.
• Field measuring and collections. Some of the projects completed listed on page 2 of this resume.
03-10-02 to 10-14-05 R G Glass Creations (Carvart Glass).
• Project manager for union NYC projects. Office interiors, retail stores and office building lobbies.
• Glass stair rails and glass and metal canopies.
• Projects were for H & M, Mexx, Christian Dior, North Folk Bank and many office interiors.
2001 Himber and Associates, (General Contractor).
• Site super for 9,000 square feet of new offices and renovation of the sprinkler system for the entire warehouse.
• This project was Sara Lee Coffee and Tea in Teterboro NJ start through certificate of occupancy.
• I was the full charge super for all trades, HVAC, plumbing, electric, carpentry, miscellaneous steel. Roof cutout, structural steel and curb for a new roof heating and AC unit.
• Included were new exterior concrete ramp, stairs. Interior floor coverings and ceramic tile walls.
1999 to 2001 Dafna Construction LTD. (General Contractor).
• Project manager for construction of building entrances at Rochdale Village Queens NY $250,000, the lobby at 20 Cooper Square NYC $125,000. Smith & Lewensky sidewalk cafe NYC $120,000.
• General contractor for V. A. Hospitals, USPS Stations and Port Authority buildings at JFK airport.
1998 Fisher Development (General Contractor).
• Site super in charge of our subs and crews for the construction of the
• Gap and Old Navy retail clothing stores
• from demolition to certificate of occupancy,
• supervising all trades.
1989 to 1998 Koslow Storefronts and Architectural Metal.
• Project manager for all projects from the shop to final installation.
• In house union carpenters (company men).
Education.
• New York University, 8 relevant courses in project management.
• Institute of Design and Construction, 10 relevant courses in construction technology.
• Dale Carnegie sales and management courses.
Resume for Robert Carter, 100 Rock Road. apt 143 Hawthorne NJ 07506 Ph 973-***-****
• Pg. 2 0f 2 pages. cell 201-***-**** ********@*********.***
The following is a partial list of projects I project managed for Clifton Architectural Glass & Metal.
Union County Juvenile Detention Center, $1,000,000.
• Featuring Bendheim channel glass for 5 openings 40 ft wide x 14 ft. high each.
• Kawneer 1600 series curtain wall, steel reinforced and Kawneer wide stile doors.
• Kawneer four sided structural glazed curtain wall.
• Alucobond panels.
• Interior 1/2 thick tempered glass fin wall. 3/4 inch thick glass fins and with a hurculite door and floating door header.
• This project was written up in glass magazine, article by Jane Holtje's.
15 East 26th Street NYC Lobby Renovation, $450,000.
• Ellison Bronze balanced bronze doors for the main lobby entrance doors.
• Blumcraft hurculite doors for the vestibule lobby entrance doors.
• 1/8 inch thick custom bronze panels for the vestibule walls, ceiling and interior columns to a 16 ft. height.
• Concierges desk built with 1/2 thick solid bronze plate panels.
• Custom storefront windows to 16 ft. height built with Kawneer bronze anodized aluminum 4" x 8" snap together tubular members with
• 3" x 7" steel tube reinforcing welded with plates top and bottom to the building spandrel beams.
Apple Computer Offices 401 West 14th Street NYC, $420,000.
• Featuring interior 1/2 thick tempered butt glazed glass partitions.
• Hurculite doors 3 ft. 7 inches wide x 8 ft. 6 inches high with a 7" offset for the pivots.
• Kawneer sliding custom wide stile doors 5 ft. wide x 8 ft. 6 inches high and Hafela top mounted sliding door rollers, 8 doors for a 40 ft wide span.
Sony Museum, 550 Madison Avenue & 56th Street NYC, $150,000.
• 100 linear feet of glass ramp railings engineered with spider fittings to existing steel posts.
• Sliding glass wall 30 ft. wide.
• Engineered free standing HDTV stand of 1/2 inch thick tempered glass and 3/4 inch thick glass fins built with spider fitting construction.
The V. A. Hospital in East Orange NJ, $120,000.
• Kawneer 1600 segmented curtain wall, IGU's,
• extended past the building line on the second floor.
• Alucobond panels.
• Besam ICU interior sliding doors were installed for ten rooms.
The Hackensack Court House Lobby Renovation.
• Kawneer Entra doors and Kawneer 451 framing, glazed.
• One bullet resistant partition.
Ivanka Trump Jewelry Store 685 Madison Avenue NYC.
• Custom engineered glass laminated with a Du Pont interlayer for burglar resistant hurculite doors & windows to meet the insurance companies' criteria without a steel role up gate for protection.
• Interior mirrors. All glass was Starphire glass.