CURRICULUM VITAE
Pandi. R
Email to; - *******************@*****.***
Phone; - +971-**-*******, +91-989*******
Objective:-
To apply my combined Engineering experience in the industry towards a meaningful and challenging position.
Profile Summary:-
• More than 15 years of Experience in the Field of Electrical and Instrumentation for the Offshore Facilities, OIL & Gas, Power Plant industry as supervisor, Electrical engineer.
• Responsible for erection and commissioning of all electrical and instrument Equipments.
Planning, monitoring & controlling all site activities including manpower planning, resource planning & material planning and finalization of responsibility matrix for site engineers.
• Ensuring all site activities are carried out as per technical specification and quality plan.
Monitoring and keeping a track of record of the day today on going activities carried out by EPC Contractors at the site. Implementing a periodic MIS reporting of site progress.
Analyzing the major scope of work at site (as per the Contract) and discussing with various disciplines for criticalities & strategies for timely completion of site work.
Coordinating & monitoring with various site contractors
Attending site coordination meeting with client on regular basis (weekly) for reviewing site progress & resolving problems.
Making correspondences on regular basis with Client to build Customer relationship and sort out any disputes (technical or commercial) at site.
Responsible for Project site activities.
Control on site activities for erection and commissioning progress and resolving site discrepancy reports with engineering. Coordinating with Procurement department for shortage damage report.
Educational Qualification:-
• Degree in electrical & electronics engineering with Elective
1. High voltage Engineering
2. Renewable energy sources.
• Diploma in electrical and electronics engineering
• Electrical supervisor competency certificate-Govt of India.
• Certification course for AB micrologix PLC-1000 and Siemens PLC.
Working Experience:-
• Electrical Engineer/supervisor more than 15 years experience in India and Middle East in electrical and instrumentation projects and operation in offshore facilities , oil and gas, power plant and manufacturing industry in the field of Supervision and Project Management.
• Including installation and commissioning of New build Jack up drilling Rig ,High Voltage 4.6kv /800KW ,4.6 KV /400 KW Electrical submersible pump for well Modification, Installation of Electrical 110 KV Single circuit Tower, construct and commissioning of electrical substations up to 110 kV and power plants 2.5MW,8X2 MW and 1.48MW furnace oil and natural gas engine with 11KV/110 KV ,2MW Kirloskar transformer.Erection and commissioning including primary, secondary injection of control bays, protection relays, schematic check, testing of AC/DC distribution panels, protection and control panels, execution and attendance of FAT for control and protection equipment supplies, Experience in commissioning co ordination for jack up drilling rig. Engineering, factory acceptance testing, and installation, Supervision, site acceptance testing, Commissioning and documentation.
• Activity involved in trouble shooting/installation of equipments /operation and maintenance of large motor control centers up to 450KW HV DOL starter /switch boards/ synchronization of power panel for 5X1.5MW Cummins diesel power generator / large capacity of motors 450KW HV, 800KW LV motors.
• Preparation of pre commissioning and commissioning procedure /QC inspection, construction (E&I) of the new jack up drilling rig and offshore platform.
• Prepare computerized preventive maintenance schedule for the entire plant.
• Knowledge in operation& Maintenance of electrical apparatus including Protective relays and, MCCB and High voltage breaker, Transformer, CT and PT,Synchronizing panel.
• Operation and maintenance of High voltage transformer.
• Operation and maintenance of large capacity reverse osmosis plant and oil purifying system.
• Operation and maintenance of higher capacity ACB, VCB and SF6 Breaker and higher capacity
MV change over panel with large distributed sub switch boards, distributed Boards and motor
Control centre with automatic start and stop operation.Thyristor drive Motor control panels.
• Responsible for construction and Commissioning of all electrical Equipments.
• Planning, monitoring & controlling all site activities including manpower planning, resource planning & material planning
• Ensuring all site activities are carried out as per technical specification and quality plan.
• Analyzing the major scope of work at site (as per the Contract) and discussing with various disciplines for criticalities & strategies for timely completion of site work.
• Control on site activities for erection progress and resolving site discrepancy reports with engineering. Coordinating with Procurement department for shortage damage report
Professional experience.
Project: FB redevelopment and upgrade DCS system.
• Construction of commissioning activities for FB –redevelopment in Dubai petroleum offshore production facilities.
• Installed 2nosXSOLAR CENTAUR 2X3.162 MW, 14450 rpm axial flow gas turbine with all accessories.
• Construction and coordination with vendor for commissioning of Invensys Foxboro IA series DCS, Redundant Triconex (sil3) F&G and ESD system.
• Construction and commissioned New well head safety panel with -25 Well racks.
• Construction and commissioning of F&G, ESD system (87 F&G-smoke, Flame, H2S, LEL, Line of sight ,e2s Sounder and beacon, Manual alarm call point and ESD push buttons ).
• Construction and commissioning of New Local equipment room comprising with 1600A, 2Tier Baltwin&Francis MV panel with 9 cubicles including generator Control relay GE Multilink G60, protective relay MICOM225, M123.M225 protective relays..
• Construction and commissioning of 2x2000A, 1x800A LV Panel with 63 cubicle MCC with MM200 MMS system .Small lighting power including Emergency and normal power distribution panel.
• Carryout construction and commissioning of 230V, 120V (Dual power with bypass), 48V, 24V (Dual power with bypass system), 12 V Chlorinator UPS system.
• Cold termination of Single core and three cores HV cable into 2 X Arevo 1650KVA transformers, 2X3.2MW IDEAL Generator.
• Coordinate vendor for high pressure and hi pot test of HV cables. Primary and secondary injection testing of breaker, Protective Relay logic and set point, CT saturation test.
• Construction and commissioned of single srubber and two filter Fuel with Heater controlled Repco Fuel Gas skid.
• Coordination with vendor for testing of 50KW Thyristor drived fuel gas heater panel.
• Construction and commissioning of new Fog horn and Nav aid system.
• Coordination with vendor for testing gross leak test and CO2 dump test both 3MW turbines.
• Coordinate wood group vendor to modify Turbine control panel (change off all wiring inside Control panel as per Wood group drawing).
• Hook up all field equipments like Crane, chemical pumps, well head safety panel, booster pump, production separator, test separator, well head safety panel, import and export header into New integrated control system (ICS –combine of DCS and ESD).
• Installed and commsissiong of Neutral earth resistance panel.
• Construction and commissioning coordination with Vendor To commissioned HVAC system –Five fan handling unit, three compressor (EACH HAS 82 KW) two Cooling pumps (2X10KW) and 9 heat exchanger fan. System fully controlled by ICS.
• Testing and commissioning of safety system testing, HI bot testing for 2X1.6MVA transformer.
• Construct and commissioned CO2 system.
• Commissioned 90kw soft starter for turbine starter motor.
Project: commissioning co ordination of Jack up drilling Rig. (UAE)-2 Nos, 600v/60Hz
Client: Sea wolf, Hull-104, 105
Project: commissioning co ordination Of Jack up drilling Rig (UAE)
Client: KS energy
• installation and Commissioning responsible for implementation of Electrical commissioning scope of work for new build Jack up drilling rig which including
• Coordination with vendor /client for commissioning of E&I System for New jack up drilling rig.
• Post procurement activities include co-ordination, field support, site acceptance testing and
Commissioning.
• Post commissioning activities include system handover, completion of as-built
drawing and project documentation.
• Installation and termination drawings as build deliverables, inquiry requisitions,
negotiation with vendors and client.
• Control and operation testing of synchronizing panel including 5X2500KW capacity generators.
• Load performance test of engine (5X2500KVA) as per ABS Standard with power factor 0.7at100% load response, power factor 0.8at step responses and power factor 0.8 to 1 at load sharing response.
• Load performance Test of Transformer, motor control centre and endurance test.
• Installation and operation of higher capacity transformer, circuit breaker, System including 600V /60HZ main switch board with auto synchronization of Caterpillar engine. Normal and emergency sub switch boards and Top drive system, transformer and Harmonic filter, ABB drives for 4X1500KW for Mud pump and draw work system. Emergency generator, Living quarters and HVAC system. Helipad perimeter lighting system, Bop system, supply and exhaust fan, Endurance and ESD.
Offshore production Facilities
Project: Asmari gas degasser project
• Construction and commissioning coordination of electrical and Instrument equipments for Asmari Gas project. 72 Field instrument including Level/pressure/temperature/flow /differential and Gas detector with all indication display with New sensitive system.
• Installation of heater/thyristor panel/Invensys I/A series DCS system and triconex sil 3 ESD PLC, Fire and gas system.
• Loop checking /precommissioning and commissioning coordination with vendor for DCS system.
• Precommissioning and commissioning of electrical and instrument system.
Project: Electrical submersible Pump
• Modification of wells installed Electrical Submersible Pump instead of Gas lift.
• Construction of 2X 448 KW Baker Hughes ESP (Electrical submersible Pump) drives with step down (480v) and step up (5KV) transformer.
• Installation and commissioning of intermediate control panel for ESP operation wells
with Baker Hughes and Dubai petroleum system engineer.
Project: UPS power for OPCON.
Project: Multiphase Metering Project. (AGAR and Haimo)- 9 Platform.
Project: Export and Booster Pump.
Project: Knock out Pot project
• Moisture separation from inlet gas to the header.
Project: Permanent pigging Falah-A (satellite platform to Gas lift -2(complex).
• Installed instrumentation around the pig access and receive platform to monitor the
Importance of safety around the platform.
Project: Helideck lighting /navigation aid lighting.
• Installation of new BAYARD’s heleideck and perimeter/wave off lighting and windsock
Lighting system.
Project: Additional night crane operation lighting Project -13 Platforms.
• Improve the transportation at nightshift for shifting Wire line/slick line and E-line Job.
Improve the productivity.
Project: Tetra communication project.
• Marine safety and communication link to Dubai police, introduce the Atlas system with connect Existing system.(Platform to platform and to onshore.
Project: H2S project.
• Safety for the platform
Project: Temporary power aggreko generators with CO2 dump.
• Construct and commissioned 2x1MW Temp aggreko generator with HAVEN Fire and safety system
•
Project in India
Project: Tamilnadu electricity board –
o Improve electricity distribution by Tamil nadu government to rural area.
Erection of 32 x 110KV single circuit Distribution tower and installed 110kv/22/11KV
Substation.
Project: Working in textile processing industry
• Working in an ISO-9002, 5S certified process &manufacturing industry producing 1,400,000 tons of yarn and 36 million meter of denim /year in south India.
• operating in charge of electrical and electronics, large sized motors/transformer/motor control centers/synchronizing panel/power panel/thyristor drives and highly automatic third generation electronic sensitive equipment including length measuring /process control devices ,instrumentation Plc and touch screen display with higher technology automation equipment.
• Preparing computer based Maintenance schedule and manage more than 20 technicians.
• Monitor regular process and prepare corrective and preventive documented control system for the electrical department as per ISO Quality system.
• Conduct review meeting with management for the required resource for the electrical department and implement system based corrective action for reducing electrical break down and improve productivity.
Captive power plant project in textile processing industry.
Project: 1.482 MW Wartsila Furnace oil engine
Project: 2.5 MW Wartsila furnace oil engine installation.
Project: 2.5MW MAN Engine operating with Furnace oil.
• Installation /commissioning /operation and maintenance of 1.438 / 2.43 MW WARTSILA engine operated with Heavy fuel oil 11 KV output power plant including all accessories (KG Group of companies in Coimbatore tamilnadu, India).
• Installation and testing of FIRE and GAS system ,Installation of field instruments like LCS, RTD, Thermocouple, flow meter, Transducers & MOV’s.
• Functional testing of MV switch gear and primary, secondary protection setting, sequence testing of power and control panels for various process systems.
• Testing of cables like HI pot test.
• Installation & connection of bus duct with transformer. Installation and loop checking of Load shedding system panels.
Training:
• Bosiet /Helicopter underwater escape training in GTSC in Abu Dhabi .Current certificate valid up to 2016.
• Dubai petroleum HSE orientation, permit to work system,
• Stop training, H2S, SCBA training, fire fighting and safety training programme for offshore platform.
• Attend training for Task risk assessment in Dubai petroleum (offshore facilities).
• Training for Operation & maintenance of Vacuum & SF6 Kirloskar Breaker at their manufacturing unit in Mysore, Karnataka state, India.
• Safety One day programme conducted by Govt of Tamil nadu, INDIA.
• Energy audit Programme Conducted by SIEMA (South India Textile
Manufacturing Association.)Coimbatore, India. Programme about 5S and
Quality Policy ISO-9002 standard.
• Knowledge on HSE. Familiar international safety system and procedures and have undergone extensive training on safety programs like ASA & Fire Fighting.
COMPUTER LITERATE:
• Operating knowledge of MS-Office Packages. Windows operating system.
CONTACT INFORMATION:
• Permanent Address : Site No24, MGP.Maruthi town, Edayarpalayam road, pappampatty, coimbatore-16, Tamil Nadu, India.
Phone to India : +91-989*******
Phone to UAE : +971-**-*******
PERSONNEL PROFILE:
• DOB : May 16th, 1974
• Nationality : Indian
• Current Company : Maritime industrial services co.ltd .Inc(MIS)
• Current Location : UAE
• Current position : E& I project supervisor.
• Notice Period : one month
• Visa status : Oil Field supply center
• Passport Detail : E-8405534 valid up to Feb, 2014.