Post Job Free

Resume

Sign in

M.Tech.,Instrumentation & Control Systems, JNTUK

Location:
Kakinada, AP, India
Salary:
30000k
Posted:
August 02, 2012

Contact this candidate

Resume:

Rajesh Mugada Email: wkpzeo@r.postjobfree.com

M.Tech.,Instrumentation & Control Systems Mobile :( +919*********)

Experience Summary

Having 5+ Years of Experience in Maintenance, Execution and Planning.

Experience in Design, Documentation, Implementation, Enhancement, Production support and Testing.

To provide technical assistance and resolution.

Preparing Of Mobilization Plan & Organization Chart and managed day-to-day Operations and Management of manpower allocation.

Responsible for gathering the project remarks from the site engineers and update the same to the site project manager.

Project Execution Quality / Compliance.

Handled complaints including physically visiting the sites and collaborating with production supervisors to identify and solve the issues and Demonstrated strengths in oral and written communications.

Work Experience

Working as an Engineer(Execution and Planning) in SPML Infra Ltd., NTPC Simhadri Super Thermal Power Plant Stage II (2x500MW), Visakhapatnam.

Worked as a Mentor in Avineon India Pvt Ltd. and Apex Knowledge Technologies pvt Ltd., Hyderabad.

Worked as a Maintenance Engineer Vincent Electro Controls (TRF), Visakhapatnam Port Trust.

Scholastics

M.Tech in Instrumentation and Control Systems from University College of Engineering, JNTUK, Kakinada, 2012 with an aggregate of 70.00%.

B.Tech in Electronics and Communication Engineering from JNTU in Lenora College of Engineering Rampachodavaram, 2005.

Intermediate from Board of Intermediate Education(BIE), from Pragati Jr College, Kakinada, 2000.

S.S.C. from Board of Secondary Education, from Tagore Convent, Kakinada, 1998.

Technical Skills

Windows 98/2K/XP/07, MS Office

Auto CAD, MS Projects, Primavera

Professional Experience

Project #1

Client : NTPC Simhadri Super thermal Power Plant Stage II

Role : Execution and Planning (Piping)

Period : Feb-2011 to Till Date

ROLES AND RESPONSIBILITIES:

To manage all the Pipeline activities (AG & UG)- Materials planning, planning, co-ordination with design & operation groups, field execution as per standard & specification of ANSI/ASME 31.1 with technical input from engineering consultant.

Maintaining all the daily site progress, gradual monitoring and allocating the project materials and assigning the resources by using Microsoft Project software.

Preparing As made Drawings, Miter Bends, Reducers, Fabrications and documentations.

Monitoring Tasks Wrapping Coating, Pipe laying and Fitups.

Planning Activities like Adhesion test, holiday test, Dye penetrate test (DPT) and Hydro static test.

Responsible for gathering the project remarks from the site engineers and update the same to the site project manager.

Assigned to find the project delayed status and responsible for fixing the breakdowns.

Preparing engineering plans, drawings and specifications.

Daily meeting and reviewing with PMC, Contractor for the successful completion of the Project.

Assisting in survey work needed for design and Erection of pipeline of projects.

Preparing Of Mobilization Plan & Organization Chart.

Daily Drawing Updating, drawing Correspondence Handling & Distribution.

Project #2:

Clients : BRITISH TELECOM and QWEST

Role : Technical Consultant, Mentor, QA

Board Area : GIS-Telecom

Software Used : AutoCAD, C image

Period : June'06 to May'08 and June’08 to Oct’09

ROLES AND RESPONSIBILITIES:

Project Execution Quality / Compliance.

Provided daily operational review/quality control as it relates to the customers requirements.

Managed day-to-day Operations and Management of manpower allocation.

Wire drawing of cables. Conversion is the process of posting of telecom data using AUTO CAD.

Tasks Inventory, Scrubbing, Posting, QC. Conversion is the process of posting of telecom data (Capture the data as per the source).

To fulfil customer’s satisfaction through qualitative approach on “TELECOM PROJECT”, with an effective quality control and quality assurance.

QC Operation is implemented where all the data is checked as per the source. Reviewing designs, identifying deviations and making relevant modification.

Project #3:

Client : TATA ROBIN FRASER, Visakhapatnam Port Trust

Role : Maintenance Engineer

Period : May '05 to May '06

ROLES AND RESPONSIBILITIES:

Attending Break downs round the clock specially in SIEMENS Master Drives (VVVF) and ABB ASTAT-84 Thyristor Drive Panels and ASTAT-9 Thyristor Drives and taking corrective action to avoid further failure.

Handled complaints including physically visiting the towers and collaborating with production supervisors to identify and solve the issues and Demonstrated strengths in oral and written communications.

Operations of ELL (TRF) Cranes 15T & 10 Ton. Distribution of Job according to the skills of the work force.

Academic Project (M.Tech., Instrumentation and Control Syatems)

Design of Series lagging Correction PI-Pd Smith Predictor for Position Control application with Time Delay.

(IJAEST) INTERNATIONAL JOURNAL OF ADVANCED ENGINEERING SCIENCES AND TECHNOLOGIES Vol No. 11, Issue No. 1, 196 - 201

Software : MATLAB Simulink

To improve the Control action and analyze the performance Simulation studies (or) results between the PI-PD Smith predictor and the Smith predictor with different techniques and Controllers for a time Delay system.

Personnel Dossier

DOB 24th April, 1983

Father Name John

Languages Known English, Hindi and Telugu

Passport No. G1359370



Contact this candidate