CIVIL/STRUCTURAL ENGINEER
SUMMARY
• Civil / Structural Engineer, with experience in civil structural design, and project control
• Engaged in major areas in the engineering design of commercial and offshore facilities
• Preparation of construction documents, project control, review engineering designs, reports, construction drawings, attending construction meetings with clients and contractors
• Critical Path Method, and Scheduling using Primavera
• Computer-aided design in structural analysis, details design
• Self-motivated team worker
EDUCATION
Bachelor of Science- 2006
Civil Engineering and Construction Management
Academy of Science & Technology
KEY PROJECTS
HFG-Engineering US, Inc. - 2008 - Present
• Centrica Lincs Wind Farm, Offshore Substation:
Structural Engineer – Assisted in the design of the topside module 3-D modeling, stability analysis for in-place, installation condition analysis, transportation and lifting analysis, responsibility also include details design, drawing review, and weight report.
• Nord E.ON 1 Offshore:
Structural Engineer – Assisted in platform 3D model In-place, installation, transportation and lifting analysis. Responsibilities also including crane pedestal analysis, steel water tanks design and analysis. Engineering design included miscellaneous structures – pad eye design, helicopter platform, cable trays support, ladders, stairs and walkways, pipe supports design, steel details design and reviewing structural design report, and weight report.
Client(s): ABB
Advantek International, Houston: Feb 2008-July 2008
• Tengiz Sulphur disposal
Project Control Engineer – Developed, analyzed, and maintained schedules using Primavera Project Planner. Responsible for workload distribution and performing critical path analysis. Along with producing project work breakdown structures and schedule baselines. Recommending solutions or recovery plans to delays or schedule impact. Developed schedules meeting client standard work flow and guidelines. Resourcing and cost loading, integrating costs and cost estimates with schedules
Client(s): Tengiz-Chevron
Arabia for Building and Construction, Egypt: 2006-07
• Multiple Projects
Project Engineer – Coordinated the electromechanical & final finish work for a multi-million dollar project, including 2 public hospitals; the factory for Procter & Gamble Manufacturing Corporation and an International bank.
Supervised major renovation projects for a military pipeline and ammunitions warehouse, and the execution of turn-key projects including a military dormitory and military base extension. Estimated project costs, prepared
and developed project proposals, working directly with the General Contractor.
Client(s): Various
Engineering Consulting Group, U.A.E: 2004-2005
• Multiple Projects
Civil Engineer - Participated in the project control and project management of residential and commercial construction projects. Responsibilities included work program development, reviewing vendor’s submittals and approval, contributed in updating the structural design and drawings. Major projects Include $18 Million training center, $2 Million housing construction project, and water treatment plant in Abu Dhabi
Client(s): ADNOC OIL and Gas Company
Project planner – Participated in the preparation of bill of quantities and specifications, Conducted meetings with suppliers and material approvals, Evaluated new suppliers and evaluated competing bids, for the new Cairo international airport terminal project.
Client(s): Egyptian Civil Aviation Authority
Proposal Manager – Participated in technical and financial proposals, preparation for new construction projects, including commercial and touristic projects, airport terminals, and environmental projects.
Client(s): Various
AMANA Steel, U.A.E: 2003
• Covered multi-sport court
Site Engineer Intern – supervised several construction stages, including steel placing for main structural members, steel reinforcement and concrete pouring and finishing for ground slabs, Monitored installation process of building finishes including block-work, plastering, ceramic tiles, painting, granite and marble, false ceilings and vinyl flooring, as well as some electromechanical components, worked on the daily inspection and testing report, ensured progression of work as per schedule, submission of monthly report, procurement and material control, and provided coordination between project and head office to identify and resolve issues
Client(s): ADGAS Abu Dhabi
Modern Interiors, Egypt: 2002
• Multiple Projects
Project Control Internship – Created schedules for the construction of large entertainment complexes, which included a theme park, amusement park, along with the food court and traffic area. Prepared bill of quantities for finishes on $4.5 and $35 Million construction projects
SOFTWARE
SACS, STAAD- Pro, Primavera, Auto-Cad and Microsoft suit, MS Project