Position :INSTRUMENT AND TELECOM COMMISSIONING TECHNICIAN

Name: Noel J. Martin

Date of Birth: February 11, 1972

Nationality: Filipino

Mobile No.: +639*********-Philippines

Passport No: EBO7209375

Address: Blk.5 Lot 14 Toledo Ext. MENZYLAND Subdivision,

Malolos City Philippines, Postal Code: 3000

SUMMARY OF MY QUALIFICATIONS:

• Registered Electronics and Communication Engineer in the Philippines with licensed no.002713

• Understand and knowledgeable the Basic Principle of Instrumentation, Electrical and Electronic Circuits

• Understand and knowledgeable in Digital Logic Circuits and Analog Logic Circuits

Have some knowledge and basic understanding of Foundation Field Bus, Hart, Profibus.

• Understand and able to read PID,PFD and have knowledge in Process Control System

• Understand the Basic Principle of Instrumentation and Control and able to calibrate Process Instruments

• Understand the Basic Principle of Programmable Logic Controller and able to program and troubleshoot PLC Siemens S7-200

• Understand and have Knowledge in Human Machine Interface Programming(HMI)

• Exposure and experience in DCS Control Environment in the plant ABB, Siemens.

• Knowledge in troubleshooting and constructing Motor Control Circuits ( DOL, Wye-delta, and Forward Reverse)

• Familiar with the Instrument and Electrical Testing Equipment which includes HART Communicator, Process Calibrator, Hi –Pot Tester, DC Low Resistance Meter, Impedance loop tester, Multi –meter, primary and secondary current injector.

• Extensive hands on experience in troubleshooting of Electrical and Instrumentation Control Fault and well verse in using the Ladder Diagram in control circuits.

• Flexible in the different kind of working Environment.

• Knowledge in AUTOCAD

AFFILIATION:

• International Electronics Engineers of the Philippines

Year: September 2009 –September 2012

WORK EXPERIENCES:

COMPANY: SPIE OIL AND GAS SERVICES INC.-MALAYSIA

TEL.NO: +861**********

POSITION: COMMISSIONING ENGINEER-E/I

DATE: September 07, 2010 – September 18, 2011

NAME OF THE PROJECT: HANAS CHINA LNG PROJECT

DUTIES & RESPONSIBILITIES:

• Lead the group of E/I technicians to ensure the following E/I pre-commissioning and Commissioning work will be properly executed

Loop Checking a Loop Testing of Instrument

Calibration of Instruments

Testing of Fire and Gas Detection System

Testing of CCTV

Functional testing of Control valves

Testing of Fire and Gas Detection System

Checking of all interlocking

Primary Injection and Secondary injection of CT and VT

Circuit Breaker Testing

No load and load test of motor including the interlocking

Lighting Illumination Test

Cable insulation, continuity and Hi pot Test

• Attend and witness factory acceptance tests, site acceptance tests, rotating equipment test runs and other testing and acceptance activities as required.

• Reports to Commissioning Manager regarding the Pre-commissioning and Commissioning activities

• Preparation of pre-commissioning procedures for onshore

• Participate to the construction of the operational tests procedure with the commissioning team for each equipment .

• Follow-up the punch list items issued during the pre commissioning and commissioning activities and if deems necessary issue additional items which shall be recorded in the ICAPS system, and follow-up the clearance as per the OPERCOM procedure.

• Witness pre-com activities performed by construction team and ensure that, for his discipline, each subsystem dossier has reached the “ready for Commissioning” and “ready for start-up” status with associated punch list.

• Liase with other disciplines to the construction of all the commissioning

documents, including Operational Test procedures in cooperation with other disciplines

• Participate to the construction of the commissioning Database as per OPERCOM

METHODOLOGY with the ICAPS engineer

• Manage the identification of Instrumentation, system and sub system battery limits and the breakdown into Mechanical Completion (MC) packages.

• Monitor construction/completion activities and pre commissioning to ensure compliance with commissioning expectations

• Provide supervision and guidance during the commissioning of discipline related activities.

COMPANY: PARSON BRINCKERHOFF -PB

TEL.NO: +974*******

POSITION: Instrument and Control Inspector (Project Management ConsultancyMC) FOR INSTALLATION AND COMMISSIONING

DATE: November 9, 2008 – July 28, 2010

NAME OF THE PROJECT: MESSAEED 2000MW COMBINED CYCLE POWERPLANT PROJECT

DUTIES & RESPONSIBILITIES:

• Represents the Client in witnessing the Pre-Commissioning and Commissioning of all the following system:

Gas Turbine and Steam Turbine Instrumentation and Control equipment

Steam Turbine

DCS System

Heat Recovery and Steam Generation (HRSG)

Auxiliary Boiler

Fire and Gas Protection System including the proper operation of the Diluge system with reference to cause and effect matrix

Telecommunication and CCTV System

• Oversees, inspects, evaluates, and comments on Instrumentation work performed by the Contractor and sub-contractors to ensure that the work is being executed in accordance with project specifications, Company standards, and regulatory requirements.

• Facilitates effective execution of Instrumentation related activities that align with the project's

• , goals, objectives, and procedures.

• Assures accurate and timely communication among the Project Team on civil activities, progress, and issues

• Monitor the Daily activities of the Contractor and submit reports of the carried out and ongoing activities of the Contractor to my Manager.

• Review, evaluate and give my recommendation/comments to any modification or changes to the construction design submitted by the contractor for approval of my Senior Engr. and Site Manager.

• Report any safety related issues to our Safety Manager or Safety Officer in the plant.

• Ensure that the Mechanical Completion Activities have been carried out and prior to Commissioning.

• Involve in walk down activities prior to Turn-over to Pre-commissioning or Commissioning.

• Review any pending design issues that need to be resolve.

• Coordinate and Liase with the Quality Control Inspectors of the Contractor.

• Report and write site memo to any non-conformities observed and not given an immediate and proper attention by the contractor

• Report any safety related issues to our Safety Manager or Safety Officer in the plant.

COMPANY: SIDEM COMPANY (POWER AND WATER CONTRACTOR)

TEL.NO: +973********

POSITION: Instrument Engineer (Commissioning and Warranty)

DATE: OCT.8, 2007 –OCT.7, 2008

NAME OF THE PROJECT: HIDD POWER STATION PHASE 3 DESALINATION PROJECT

DUTIES & RESPONSIBILITIES:

• Execute pre-commissioning activities and ensure that the following data are inserted to Commissioning Protocols.

• Witness and Accept Functional Acceptance Testing from the vendor.

• Ensure that the Permit to Work is applied and on hand prior to work.

• Ensure that the Instruments and Control equipment are in good condition and available and in service prior to start-up.

• Liase with the Client Instrument and Control concerning the clearing of defects and punch list.

• Perform Checks and Maintenance activities during Shutdown period of the units.

• Checks the DCS programs and the different interlocks during loop testing.

• Attend daily instrument and electrical control defects reported by the DCS Operator

• Calibrates Equipment, Process Instruments, Water and Carbon Emission Monitoring System Analyzer.

• Assist DCS and local operator during start-up of the Boiler and desalination Units.

• Assist and help the Client and Instrument in clearing and tracing of Fire Alarm System fault.

• Perform troubleshooting with the Client Instrument/Electrical technician in equipment and system fault.

• Write Commissioning and Maintenance Procedures for Electrical/ Mechanical and Instrumentation and Control.

• Assist the concern Mechanical in no load and load test of the motors.

COMPANY: ABV ROCK GROUP KB K.S.A (OIL and GAS PROJECT CONTRACTOR)

ADDRESS: P.O BOX 1684 ALQASSIM BURAYDAH K.S.A

TEL.NO: (03) 391-2225

POSITION: Instrument and Control Engineer (Assistant Commissioning Engineer)

DATE: May 04, 2006 – May 04, 2007

NAME OF THE PROJECT: SAUDI STRATEGIC STORAGE PLANT (Underground storage tunnel project for Jet A1,Kerosene and Diesel )

DUTIES & RESPONSIBILITIES:

• Perform Field Activities in accordance with the objectives and strategies of the section under the Supervision of Lead Instrument Commissioning Engineer.

1. Pre –Commissioning and Commissioning of the following Units:

Inert Gas System

Fire ,Gas and Safety Devices –i.e ANX Fireguard safety system ,Gas Detectors, Addressable Smoke detectors and Flame detectors and Halon Gas Units.

Process Instruments like Pressure Transmitter, Flow Transmitter, Temperature Transmitter, Air operated valve

HVAC Control System

Pumping Control Unit

HV ,MV and LV Switchgear

HV and LV Transformer

• Implement the performance of the Commissioning Acceptance Test Sheet

Loop Checking and Testing of All analog and Digital loops

Functional and performance testing of DCS Inputs and Outputs

• Liase with the other discipline personnel and support staff of the section under the directives of the Supervisor

• Attend and witness Functional Acceptance Testing done by the vendor

• Ensure the section’s adherence to safety procedures

• Report Real and perceived deviations to agreed time schedule and quality in due time.

• Analyze Technical Problems and initiate remedial action

• Review completed System Commissioning Acceptance Test Sheets

• Participate in OJT training in fire fighting and rescue situations

• Encourage continuous development and improvement of working method

COMPANY: FAISAL MOHAMMED QAHTANI INC.

ADDRESS: P.O BOX 3162 ALKHOBAR 31952 KINGDOM OF SAUDI ARABIA

TEL.NO: (03) 814-0404

POSITION: ELECTRICAL/INSTRUMENTATION ENGINEER

DATE: May 04, 2004 – DEC. 24, 2005

NAME OF THE PROJECTS: (All SAUDI ARAMCO Projects)

• QATIF Maintain Potential Pipeline Upgrade in Rastanura ,

• Shedgum NGL Plant Khauffgas line Upgrade in Aindar,

• East –West Oil and Gas Pump Station Upgrade in Riyadh

DUTIES & RESPONSIBILITIES:

QATIF MAINTAIN POTENTIAL PIPELINE UPGRADE

Assists in performing Pre-commissioning and Commissioning activities which

• Loop checking and Loop Testing of analog and Digital inputs and outputs

• Calibration and configuration of Control Valves

• Fire and Gas detection System Commissioning

• Calibration and configuration of Process Instruments and Analyzers

Supervise the following Electrical/Instrumentation works in the pipeline.

• Bench and Field Calibration of Instruments

• Installation and Termination of Power, Control & Instrument Cables for Oil wellheads and pipeline.

• Installation of Cable trays

• Installation of Control and Safety Instruments

• Prepare permit to work

• Installation of Field Instruments i.e Differential Flow Transmitters, Level and Pressure Instruments.

Report to Construction Superintendent on progress of activities and interface with the Pre-commissioning

Perform Commissioning works of the following control and safety Instruments;

• H2S Detectors

• Motor Operated Valves

• Electro-Pneumatic Safety Shutdown and Control Valves

SCHEDGUM NGL PLANT KHAUFFGAS UPGRADE

Supervise the following Electrical/Instrumentation works in the field:

• Installation of Power and Control Cables of the Gas Surge Drum

• Installation of Cable Tray in 15 meters High pipe rack.

• Termination of Power and Control Cables in Motor Control Center

• Bench and Instrument Calibration of Differential Pressure Transmitters

• Liaise with the SAUDI ARAMCO Engineers with regards to Project Discrepancies

• Electrical and Instrument Material take-off

EAST TO WEST OIL AND GAS PUMP STATION IN RIYADH

Supervise of the following Electrical/Instrumentation works in the field:

• Installation and Termination of Power and Control cables in Control Buildings.

• Installation of Control and Safety Instruments inside the Plenum of Gas Turbine Engines.

• Perform Commissioning of Control Instrument and Safety Devices

COMPANY: ADVANCE TECHNOLOGY SYSTEMS INC.

ADDRESS: 78 BAESA ROAD QUEZON CITY PHILIPPINES

POSITION: INSTRUMENT AND CONTROL ENGINEER

DATE: November 04, 2002– March 04, 2004

DUTIES & RESPONSIBILITIES:

Rehabilitate and Fabricate Processing Equipment which include the following Electrical/Instrumentation works:

• Fabrication of Control Panel

• Commissioning of the sold –out Equipment

• Pre-commissioning of the equipment

• Installation of Electrical and Instrument Components

• Design a control Logic for Pre – fabricated machines.

• Panel wiring and re-wiring

• Calibration of Instruments

Involve in their Plant Expansion which includes the ff. Electrical/Instrumentation works:

• Testing of Electro-Pneumatic Valves

• Wiring of Motor Control Center

• Installation of level sensors, Controllers, Frequency Inverters,cable trays

• Installation and testing of Motor for Conveyors, Motor Pumps

COMPANY: SMK ELECTRONICS PHILIPPINES

ADDRESS: LOT C-4 CLARK PREMIERE INDUSTRIAL PARK PHIL.

TEL.NO: (045-*******

POSITION: ASSISTANT MAINTENANCE ENGINEER

DATE: March 2001 – Sept., 2002

DUTIES & RESPONSIBILITIES:

• Involves practical, hands-on engineering, problem-solving

• Involve in equipment development process by working to incorporate efficient methods of maintaining new equipment or plant, and involved in the installation and commissioning process of equipment.

• Assist in improving the useful life of plant, equipments and machineries in production phase

• Assist the Maintenance Engineer in making plans for the routine maintenance of plant, equipments and machineries.

• Attend breakdowns, diagnose faults and oversee time critical repairs on the equipment.

• Assists in writing maintenance strategies to help with installation and commissioning guidelines

• Directing, instructing and supervising maintenance technicians and fitters to get the job done correctly.

• Help Maintenance Engineer in monitoring and controlling maintenance costs

• Assists in controlling maintenance tools, stores and equipment

• Involves practical, hands-on engineering, problem-solving, and assists supervising technical staff.

COMPANY: SMK ELECTRONICS JAPAN

ADDRESS: MACHI NEIGUN TOYAMA KEN JAPAN

POSITION: TRAINEE

DATE: April 2000 – Feb.2001

DUTIES & RESPONSIBILITIES:

Study Touch Panel Production Process which includes:

• Machine familiarization and Operation

• Translation of Japanese form into English

• Safety Procedures familiarization

COMPANY: UNIVERSITY OF THE EAST CALOOCAN CITY

ADDRESS: Sangandaan Road Letre Caloocan City Philippines

POSITION: ELECTRONICS ENGINEERING INSTRUCTOR

DATE: April 1999 – March 2000

COMPANY: AMA COMPUTER COLLEGE CALOOCAN

ADDRESS: Sangandaan Road Letre Caloocan City Philippines

POSITION: MATHEMATICS INSTRUCTOR

DATE: April 1999 – March 2000

COMPANY: CEMBAG PLASTIC MANUFACTURING INC.

ADDRESS: LINGUNAN ROAD VALENZUELA PHILIPPINES

POSITION: ELECTRICAL /INSTRUMENT MAINTENANCE TECHNICIAN

DATE: Nov. 1998– March 1999

DUTIES & RESPONSIBILITIES:

• Performs schedule maintenance, installation and integration of different types of process control instrumentation equipment for example transmitters controllers. Craft repairs to electrical power, motor and motor control circuits.

• Attend and troubleshoot Electrical/Instrument fault in the plant

• Performs routine maintenance which includes but is not limited to the following:

Field calibration of instrumentation utilizing appropriate test equipment

Complete repair in shop environment to comprise component replacements, alignments and calibration to specifications of record.

Fault examination of hardwire relay logic, motor control circuits, motor power circuits , general utility / lighting circuits

Fitting of new control circuits, modification of open instrument/electrical systems as requested

COMPANY: AIRLINK INTERNATIONAL AVIATION SCHOOL

ADDRESS: Domestic Airport Road Pasay City Philippines

POSITION: PART-TIME INSTRUCTOR (Aviation Technical Subjects)

DATE: May 1995– Sept.1998

COMPANY: PHILIPPINE SCIENCE AND TECHNOLOGICAL CENTER

ADDRESS: Samson road Caloocan City Philippines

POSITION: ELECTRONICS AND ELECTRICAL TECHNICAL INSTRUCTOR

DATE: April 1995– April.1996

EDUCATIONAL QUALIFICATION:

Course: Bachelor of Science in Electronics and Communication Engineering

School: University of the East Samson Road Caloocan City Philippines

Yr. Graduated: October 1998

Course: Bachelor of Science in Aircraft Technology

School: PATTS COLLEGE OF AERONAUTICS Domestic Rd Pasay City Phil.

Yr. Graduated: October 1992

Course: Aircraft Maintenance Technology

School: PATTS COLLEGE OF AERONAUTICS, Domestic Rd. Pasay City Phil.

Yr. Graduated: April 1990

High School: Graduate

School: Jose Abad Santos High School Meisic Road, Binondo , Manila Phil.

Yr. Graduated: March 1988

Elementary: Graduate

School: Pedro Guevarra Elementary Sch.,San Nicolas Binondo Manila Phil.

Yr. Graduated: March 1984

SEMINARS/TRAINING COURSES ATTENDED:

AUTOCAD

CONDUCTED AT : TESDA

COURSE DURATION: NOVEMBER 21,201- DEC 16,2011

ADVANCE PROGRAMMBLE LOGIC CONTROLLER WITH HMI

CONDUCTED AT : MECHTRONICS PHILIPPINES INC,UP DILIMAN

COURSE DURATION: SEPTEMBER 28- NOVEMBER 5,2010

BASIC PROGRAMMABLE LOGIC CONTROLLER

INSTRUCTOR : CHARLES VALENCIA

CONDUCTED AT : MERALCO FOUNDATION INSTITUTE

COURSE DURATION: 42 HRS(May 7-24,2007)

CALIBRATION FOR PROCESS INSTRUMENTATION

INSTRUCTOR : ENGINEER RONUELO PANUELOS

CONDUCTED AT : MERALCO FOUNDATION INSTITUTE

COURSE DURATION: 36 HRS.(May 7-17,2007)

OPERATING AND MAINTENANCE PROCEDURES OF CHEMICAL WARFARE DETECTORS.

CONDUCTED BY : ABV ROCK GROUP

CONDUCTED AT : ABV ROCK GROUP KB AL QASSIM ,BURAYDAH K.S.A

COURSE DURATION: 1 DAY-Feb.15, 2007

SAFETY INDUCTION COURSE

CONDUCTED BY : ABV ROCK GROUP

CONDUCTED AT : ABV ROCK GROUP KB AL QASSIM ,BURAYDAH K.S.A

COURSE DURATION: 1 DAY-MAY 8, 2006

BASIC SAFETY TRAINING

CONDUCTED BY : FAR EAST MARITIME TRAINING INC.

CONDUCTED AT : FEMT U.N AVE. MANILA

COURSE DURATION: JAN.17-JAN.19, 2006

GENERAL TANKER FAMILIARIZATION

CONDUCTED BY : PHIL.SEAFERER TRAINING CENTER

CONDUCTED AT : PSTC BLDG. RECTO MANILA

COURSE DURATION: JAN.23-JAN.31, 2006

SHORE – BASE FIRE FIGHTING

CONDUCTED BY : PHIL.SEAFERER TRAINING CENTER

CONDUCTED AT : PSTC BLDG. RECTO MANILA

COURSE DURATION: FEB.2- FEB.3, 2006

ORIENTATION TO EMERGENCY RESPONSE PLAN

CONDUCTED BY : HUMAN RESOURCES DEV. DIV. SAUDI ARAMCO

CONDUCTED AT : SCHEDGUM GAS PLANT

DATE : MARCH 9, 2005

WORK PERMIT RECEIVER COURSE

CONDUCTED BY : SAUDI ARAMCO LOSS PREVENTION

CONDUCTED AT : SAUDI ARAMCO ABQAIQ ADMINISTRATION OFFICE

DATE : MAY 21, 2005

DIGITAL ELECTRONICS

CONDUCTED BY : MERALCO FOUNDATION

CONDUCTED AT : MFI BLDG. ORTIGAS

DATE : FEB. 16-20, 1998