Alex R. Grippe
**** ******** **** *******, ** *8027
********@*****.*** 704-***-****
SUMMARY OF QUALIFICATIONS
PROJECT MANGEMENT CONTRACT ADMINISTRATION SITE EVALUATION
BOUNDRY SURVEYS WATER & SEWER DESIGN STORMWATER DESIGN
Comprehensive knowledge in project management, engineering, plan design, contract documents and specifications as well as permit expediting. Able to establish rapport and credibility with diverse groups ranging from private contractors to State and Federal agencies. Experience in leading a project from inception to completion and on-site inspection. Effective in creating a positive productive work environment. Able to plan and work within project budgets and timelines.
PROFESSIONAL EXPERIENCE
BP Barber Charlotte, NC
Engineering Associate III April 2008-June 2010
Effectively managed, designed, and coordinated a diverse range of projects with private contractors, as well as State and Federal agencies. Responsibilities included contract management, analysis and design of sewer and water systems (municipal and residential. Other responsibilities included evaluation of manufacturer’s and contractor’s proposals, as well as ensuring client’s budgets and timelines were met by the design team.
KEY PROJECTS AND SELECTED ACCOMPLISHMENTS
• Successfully designed and led the site development for the IBHS Research Facility
• Planned and designed water, sewer, and storm water for various dialysis centers
• Re-designed a loading area to alleviate storm water run off for the Frito-Lay Corporation of Charlotte while allowing Frito-lay to remain operational during the construction phase
WK Dickson Charlotte, NC
Engineer June 2007-February 2008
Planned, managed, and coordinated a wide range of projects from private contractors to regulatory agencies. Responsibilities included analysis and design of sewer and water systems (municipal and residential), as well as evaluation of manufacturer’s and contractors proposals and site evaluation.
KEY PROJECTS AND SELECTED ACCOMPLISHMENTS
• Successfully re-designed a low-pressure sewer system along Lake Norman minimizing the impact of construction utilizing water-modeling software
• Effectively designed and carried out contract administration of 1,400 LF of water line in the University Area of Charlotte, NC
• Accomplished design of 10,000 LF of 12” sewer line along creek embankments as well as directional drilling across state highways
Alex Grippe Page 2 of 2
PROFESSIONAL EXPERIENCE CONTINUED
Laberge Group Engineering Albany, NY
Engineer June 2005-June 2007
Accountable for planning, organizing, and managing various projects. Responsibilities included design and analysis of sewer, water and storm water systems (municipal and residential), road and stream crossing, site evaluation, inspection of sewage disposal installations, and contract administration. Other responsibilities included coordinating between sub-consultants and local municipalities.
KEY PROJECTS AND SELECTED ACCOMPLISHMENTS
• Successfully re-deigned a sewer system for a 49 home subdivision incorporating low-pressure sewage pumps to meet the changes set forth by homeowners
• Developed a storm water pollution prevention plan for a 67 acre seasonal soccer camp in the Adirondack Park and effectively coordinated on-site inspections and field engineering
• Developed a plan for a water main extension servicing 45 homes in the Town of Plattsburgh, NY and incorporated horizontal directional drilling under the New York State Interstate
Praetorius & Conrad, PC Saugerties, NY
Project Engineer January 2002-June 2005
Effectively planned, organized, and managed various projects. Responsibilities included design and analysis of sewer and water systems (Municipal and residential), site evaluation and soil testing, inspection of sewage disposal installations, full-time construction inspection, and contract administration. Other responsibilities included performing field and office work in boundary, construction, aerial photography and topographic surveys.
KEY PROJECTS AND SELECTED ACCOMPLISHMENTS
• Full-time supervision of the Onteora Central School sewage upgrade, including the installation of gravity sewer lines, manholes, duel sand filter beds, and metering manholes
• Designed a 5 lot, 50 acre subdivision incorporating a 2,000 ft road extension and individual sewage disposal system for the 5 lots
SKILLS/TRAINING
• Computer: AutoCAD 2005, Landesk 2008 HydroCad, Civil 3D 2010, and Office XP and 2007
• Proficient with Arcview software version 9.3 and geospatial technology
• Personal: Goal and Task Oriented
EDUCATION
Bachelor in Science Civil and Environmental Engineering December 2011
Clarkson University Potsdam, NY
Associate in Applied Science in Mathematics and Science December 1999
Hudson Valley Community College Troy, NY