Serge M. Migdal
Pleasantville, NY ***** *********@***.*** 914-***-****
Outstanding record of process improvement with a focus on business requirements
SUMMARY
Logistics & Supply Chain Planning Specialist
- Expertise in developing and directing multi-site production, distribution, inventory plans and implementing marketing initiatives
- Worked within a brand team to provide coordination and liaison across the supply chain; materials management, marketing, sales/merchandising, manufacturing and distribution to ensure timely availability of ongoing and new products in the market
- Performed least cost sourcing analyses.
Manufacturing Engineering Professional
- Demonstrated ability to identify, evaluate, and implement process improvement initiatives and programs across multiple sites
- Experience in identifying productivity opportunities in manufacturing and warehousing.
- Annual savings $1MM -$5MM
Experience in:
- Production planning - Kaizen
- Inventory reduction - Economic analysis of projects
- Capacity analysis - Single Minute Exchange of Dies
- Distribution warehouse principles - Process Mapping
and practices - 6 Sigma
- Changeover reduction analysis - Value Stream Mapping
- Productivity & process improvement - Workplace Organization (5S)
PROFESSIONAL EXPERIENCE
BAKERS PRIDE OVEN CO. 2006-7/2009
Business Industrial Engineer, Facility Maintenance Mgr., Safety Coordinator
Provide Industrial Engineering support for process & quality improvement, and equipment installation. Oversee facility and equipment maintenance and repair. Coordinate safety program.
- Project lead for installation $600,000 numerical control stamping equipment.
KRAFT FOODS 1970-2006
Area/Sector Staff Manufacturing Engineer (1998-2006)
Provided staff level Industrial Engineering support for developing, implementing and managing productivity projects and programs in the Northeast area and the Desserts/Beverage business sector. Conducted productivity ideation sessions. Provided business and facility capacity analyses for strategic planning of future requirements. Led changeover time reduction work teams using Continuous Improvement (Kaizen), Single Minute Exchange of Dies (SMED) and Workplace Organization (5S) techniques.
- Project lead for sector-wide evaluation and implementation of automated truck
loading using Self Guided Vehicles. Savings of $800M.
- 20%-40% reduction in changeover time across multiple facilities.
- Process Map of package damage for a major business across Kraft’s internal supply
chain.
- Co led Kaizen teams together with Sanitation to improve equipment sanitation.
Process Optimization Specialist & Corporate Industrial Engineer (1994-1998)
Led and participated in optimization studies to audit processes and work practices in manufacturing, distribution and warehouse operations to improve productivity and reduce costs. Provided manufacturing engineering support for capital expenditure planning.
- Led and participated on teams conducting optimization studies across multiple US &
Canadian distribution facilities identifying $1-$5MM annual savings over several years
Serge M. Migdal 914-***-**** (C) Page 2
Industrial Automation Group and Administrative Design Engineer (1986-1994)
Internal consultant in developing Computer Integrated Manufacturing plans within manufacturing facilities and business units. Developed functional specifications and requirements for individual projects. Industrial Engineer for distribution and warehouse operations.
- Developed Computer integrated Manufacturing strategies within divisions to identify
common technology needs
- Developed Computer Integrated Manufacturing and quality systems requirements for
two facilities.
Planning Manager/Logistics Applications Specialist (1975-1986)
Supervised five people in developing multi-facility productions plans. Liaison between logistics practitioner and systems in developing and implementing logistics projects.
- Assigned plant service areas to minimize costs.
- Chaired discussions between Brand Management, Sales/Merchandizing and
Operations to ensure consensus in sales projections and provide a basis for sourcing,
producing, planning and delivery of requirements.
- Project lead in implementing a centralized production planning system across two
divisions.
Production Planner (1973-1975)
Provided weekly finite schedules & distribution requirements across multiple plants and distribution centers to ensure target inventory and customer service levels were attained. Ran linear program for multi plant produced products to assure least cost sourcing.
- Lowered inventory 10% while maintaining the same service level
- Provided lead for cross functional coordination and liaison between marketing,
research, sales, purchasing, and manufacturing in establishing timetables to assure
timely retail availability of new and promotional products.
- Developed and maintained continuous Plan vs. Actual reports to track actual
production, sales & inventory against planned targets and adjust plans accordingly
- Planned and executed seasonal builds and determined warehouse requirements for
major national branded products.
Industrial Engineer (1970-1973)
Facility Manufacturing Engineer
EDUCATION
Pace University Management Science MBA
Lehigh University Industrial Engineering BS
PROFESSIONAL DEVELOPMENT WORKSHOPS & SKILLS
- Production Planning in the Process industry - Warehouse/Distribution Center Layout
- Principles and Practices of Distribution Warehousing - Value Stream Mapping - 6 Sigma - Excel, Word, PowerPoint
PROFESSIONAL AFFILIATION AND HONORS
On Board of directors & member of local APICS Chapter
Six Sigma green belt certification obtained
CPIM certification obtained
Delta Mu Delta Business honorary
Keywords: Industrial Engineer, Lean, JIT, Kanban, Supply Chain, Continuous Improvement, Takt Time, Spaghetti Diagram, Production Planning & Scheduling, Kaizen