Valente Moreno
Quality Inspector/CMM programmer
Name:
Valente Moreno
Address:
Privada Vernae #22, Agavez Residencial
HERMOSILLO Son, MexicoCP 85010
Contact information:
Email: *********@*******.***
Home: 011 52-166*-*******
Education
Instituto Tecnologico de Hermosillo, Hermosillo
INDUSTRIAL ELECTRONICS ENGINEER, October 1997
PLC programmming
Hi, I am a CMM programmer with GDT experience on precision machining and mechanical inspection for first article development and in process, also have experience on automotive stamped and weld assemblies inspection with CMM, checking fixture certification, aligment of parts in free state or in holding fixtures. I started programming a Zeiss Vista with Calypso, the software that I use on my current job is LK Camio 4.1 on LK LY-90 CMM twin arm, have Faro Arm programming experience too. Aditionally support a local university that have a CMM with Geomeasure 6000 on a Mitutoyo Crista
Work Experience
Company:MAGNA Cosma Intl-,
Hermosillo, Sonora, Mexico October 2004 - Present
CMM Programmer
MAGNA Cosma Sonora Forming tech.
(Automotive plant, providing Bodystructure stamping and assembly parts to Ford Fusion, Lincoln Zephir and Mercury Milan Projects on Ford's Hermosillo Plant)
*CMM Programmer under LK LY90 twin arm and Column LC90 using LK Camio 4.1 software.
*Basic knowledge of CM4D programming to report multiple pieces as SPC, Cp- Cpk, roadmaps and general statistical reports
*LK Studio Reporting for generate Roadmaps and statistical Reports
*Certification and Calibration of Checking and Holding Fixtures used on inspections on presses and assembly lines.
*Faro Arm Programming
*Special programs developments also scanning of parts with faro Arm Laser
*Courses on 2006: MSA 2nd ed., GRR & Anova method, GDT for mechanical inspection *January 2008 Trained inspectors on CMM programming with LK Camio in a Magna Stamping Plant in Saltillo Mexico.*Also have experience in blue scribe of prototype parts for Ford Assembly Plant
*2008 Promoved to Product Engineer where I have responsabilities over Some comodities assemblies including its stamped parts and components, from engineering changes Quotation start up, machine shop coordination with released changes, line implementation and PSW contribution with QA department. And SAP update of parts and end item products.
Also basic design and redesign using CATIA V5 R18, support other deparments with math data conversion to Step or Iges formats
Company: TCM America,
Hermosillo Sonora November 2002 - Oct 2004
CMM Operator/quality technician
* Develop quality test methods for inspect high precision parts appling Geometrical, Distance & Tolerancing concepts
* CMM Programing and modification using a Coordinate Measurement Machine Zeiss with Calypso interface.
* First Article development for every different part number, also for new qualifications parts.
* In charge of Calibration department, developing instructions to certify our company on ISO 9000:2000
* Measuring equipment on calibration program includes, Digital and Analog Micrometers, Calipers, Height Gauges, Dial test indicators, 3D dial indicators, pin gages, block gages, thread gages, ring gages, functional gages, themperature and Ph controllers, and external calibrated eq. like CMMs, and Calibration Standards
* Skilled on mechanical measurings using gages and granite tables, v blocks, 123 blocks, roughness tester, accordig to the part requirements
* Calibration is controlled with an MS Access XP application developed internally.
* Support to Manufacturing area, supervisors and engineers when setups of Mills and Lathes are done for production.
Company: Steward
November 1998 - February 2000
Calibration Coordinator
Creation of a new Internal Calibration Laboratory to meet ISO/QS9000 Norm. Developing SOPs, forms, document control, calibration technicians training.
Buying of calibration standards, labels and manuals of various Inspection Meassurement and Test Equipment.
Search of Secondary Calibration Labs for recalibrating our Cal Standards
Implementation of Calib Program of all IMTE on two facilities and keep documentation of all works made by the Lab
Repairing of PCs, Printers and troubleshooted Win 9X problems
Company: ADFlex Solutions
January 1998 - June 1998
Calibration Engineer
Worked on calibration of various IMTE acording to a weekly calib program, supervising metrology tests and also repairing of electronic controllers
Trained on Calibration of Dimensional gages, microscopes, volt/amp meters, temperature controllers, digital thermometers, pressure process controllers and electrical test equipment.
Trained new technicians for calibration of IMTE
Company: TSI ARYL
June 1998 - November 1998
Computer Technician
Diagnost, repair and trobleshooting of PC problems.
Service of Dot matrix, inkjet and laser printers.
Performed Preventive maintenance of computers
Instalation of LAN, configuration of network cards, hubs and wiring with UTP level 5 network cable.