Post Job Free
Sign in

Having 6.7 Years exp. on telecom GSM field

Location:
India
Posted:
August 11, 2011

Contact this candidate

Resume:

SANJAY KUMAR SINGH

E-Mail: **************@*****.**.**

Mobile No: 095********/099********

CARRER OBJECTIVE

• To Excel in a highly competitive environment and attain a high profile status by joining an organization of repute, which offers a conductive and synergistic environment for mutual growth and development.

PROFESSIONAL QUALIFICATION

• B. Tech with Electronic & Communication from IEC College of Engineering & Technology, Gr. Noida completed the Degree in June 2006.

• Pursuing M.B.A in Telecom Management from Indian Institute of Telecom Management, New Delhi.

• Getting one week training regarding TDD-LTE.

Technical Skill Summary

• Getting one week training about TDD-LTE technology (Basics, Installation & Commissioning)

• Hand On experience of Two GSM Turn Key Project and One multi IP sharing GSM Project.

• Experience in ZTE Equipments & NOKIA Equipments.

• BSS (I&C, Quality Standards, Operation & maintainace).

• MW (I&C of PDH network (ZTE), basic technical knowledge of PDH & SDH)

• OMCR (Alarm Management, Configuration Management, Performance Management & Radio Resource management).

• Site Engineering (Civil & electrical knowledge with guideline of NSN & ZTE).

• Documentation (Command over Excel, PDF, Power Points & MS-Word).

PROFESSIONAL EXPERIENCE

• Organization: ZTE Telecom India Pvt. Ltd.

Date of Joining: September 2009 to till data.

• Organization: Nokia Siemens Networks.(On the payroll of Denave)

Date of Joining: 23rd July 2008 to September 2009.

• Organization: ZTE Telecom India Pvt. Ltd.

Date of Joining: 2nd April 2007 to 22nd July 2008.

• Organization: TYCO Electronics India Pvt. Ltd.

Date of Joining: August 2006 to 31st march 2007.

• Organization: Nutek India Pvt. Ltd.

Date of joining: October 2001 to May 2003

PROJECT-5

S-TEL LIMITED.

Location: BIHAR AND JHARKHAND

Duration: September 2009 to Ongoing

Designation: Cluster Lead

SYNOPSIS

• Implementation, integration, operation, maintenance of BSS/BTS/BSC

Co-ordination with different (GSM or CDMA) vendors and

Liasioning with local authority.

• Responsible for timely rollout of Network (BTS, BSC, IBS & Repeaters) at Cluster level.

• On Field execution & Coordination of all activities pertaining to Rollout (i.e Responsible for all the activities of Bhagalpur & Purnia Cluster, Covering 3 BSC'S & 11 districts including network rollout, site installation quality, RFI check, ATP, TMA scanning, RU power measurement, SCFT and MS Handover).

• Single point of contact and wholly responsible for alarm clearance/rectification of all sites of Bihar & Jharkhand.

• Successful completion of all the 1525 Sites SCFT in S Tel Bihar & Jharkhand Network.

• Tracking the TMA scanning/RU voltage measurement and Alarm extension of all sites of Bihar.

• To interface with the passive infrastructure and bandwidth partner to ensure timely delivery of sites in the respective cluster.

• To interface with GSM vendor and other partners for timely delivery and execution in the respective cluster.

• Network Optimization in consultation with RF & Network planning team.

• Interacting with sales & marketing team regarding coverage issue and Customer complaints.

• Providing Technical Solution to Sales & Distribution team to enhance the site Utilization.

PROJECT-4

BHARTI AIRTEL LIMITED.

Location: BIHAR AND JHARKHAND

Duration: JULY 2008 to September 2009

Designation: Site Supervisor-Telecom Implementation

SYNOPSIS

• Responsible for the checking the SDR (Site Delivery Report) sent by Subcontractors.

• Responsible for the coordination with Warehouse Team for correct material dispatch and within timeline.

• To follow up with Field Engineers for BTS & BSC Installation, Commissioning & Integration with proper guidelines of NSN.

• To prepare the debit note and SRN Report on Monthly basis of sample sites of each TI partners.

• Supervising Installation, Commissioning, Integration & Maintenance of BTS, M/W.

• Experience on Nokia BTS (Ultra & Flexi).

• Responsible for resource management (TI-partner, Installation material).

• I was responsible for Outdoor & Indoor installation of Telecom Equipments in terms of RF feeder cable routing, Make connector and its groundings, IF cables routing and make connector , GSM & MW antennas at particular height and tilt, BTS & MW, TMA, Surge arrester, EGB, IGB and etc.

• I take care regarding power connection are done properly with all equipment.

• I also supervise Pre-AT for our vender and AT for our customer.

• I also responsible for Indoor equipments was installed as per specified layout.

• I am responsible for project rollout to achieve monthly target with quality.

• Supervising all activity related with TI-Installation material disp. For site.

PROJECT-3

. ZTE-AIRCEL TELECOM LIMITED.

Location: Purnia cluster Bihar

Duration: April 2007 to July 2008.

Designation: BSS Engineer

SYNOPSIS

O&M Phase.

• Handling of OMCR ZTE in BIHAR for AIRCEL.

• Responsible for database creation of sites and BSC.

• Hands on experience of various managements i.e. Fault management, Configuration management etc.

• Responsible for commissioning of ZTE BTS & Microwave.

• Call Testing, Call blocked/Unblocked.

• Handling E-1 Path routing for the upcoming Sites (BSC-New BTS).

• Responsible of fault troubleshooting for various cards in BTS, BSC & GPRS.

• Download of data from BSC

• Preparing DDF plan for BSC-BTS connectivity.

• Analyze KPI Reports on daily basis doing necessary required changes also suggesting same to R.F Engineer.

• Supporting R.F Engineer for optimization of network.

• Responsible for VSWR & Power measurement and calibration.

• Ability to analysis the Daily Network outage report and implement necessary action to rectify the problems.

• Responsible for all activity related to O&M (i.e. BTS, Battery bank, Power plant, Microwave antenna and D.G monthly health check up).

Project Phase: -

1. I was responsible for 60 BTS and 01 BSC Installation & Commissioning of ZTE equipment for AIRCEL GSM Bihar.

2. Did the work on ZXG10- PDH MW for the AIRCEL GSM BIHAR.

Job Profile:

• Did the installation and alignment done of ZTE microwave (PDH) for AIRCEL GSM BIHAR.

• Did the configuration and commissioning of MW IDU for AIRCEL GSM BIHAR.

3. Did the supervision of Infra, Electrical and Telecom installation work for the AIRCEL GSM BIHAR

Job Profile:

• I Did the supervision of Tower foundation (RAFT & PILE), Shelter and DG foundation works, Template casting, grouting of tower legs, earth pits works & its connections with GI strips, DG commissioning work, groundings, Electrical installation.

• Also I did the supervision Tower & Shelter Erection work.

• I was also responsible for Outdoor & Indoor installation of Telecom Equipments in terms of RF feeder cable and its groundings, IF cables, GSM & MW antennas at particular height and tilt, BTS & MW IDUs installation, battery bank, AC and stabilizer installation, TMA, Surge arrester, EGB, IGB and Aviation lamp installation.

• I also extended the external alarms for DG, Main Supply, Smoke Detector, Battery bank etc.

PROJECT-2

Tyco Electronics India Pvt. Ltd.

Location: Bihar & Jharkhand

Duration: August 2006 to March 2007

Designation: Project Coordinator for TATA INDICOM O&M from 1st January 2007. Earlier doing Quality Acceptance Test (QAT) in Bihar/Jharkhand for Bharti from August 2006 to 31st December as a Site Engineer.

SYNOPSIS

• Perform Quality Acceptance Test at site.

• Check the following equipment and its testing

Shelter: Shelter Condition, AC: AC working Condition and its quality test

Power Interface Unit (PIU): PIU QAT, Functional test and Load test

Phase Change Module (PCM): PCM QAT and functional test

Diesel Generator (DG): DG QAT, Fuel consumption test, Noise test and Load test, Electrical: Electrical QAT

Earthing: Earthing QAT and earth resistance measurement.

• Make the Punch Point (Annexure) of the site where QAT is performed

• Generation and submission of Reports and Annexure of all the test done above to Tyco Electronics, Bharti, O&M of Bharti (NOKIA) and other vendors of Bharti (ACME, KIRLOSKAR, MAHINDRA, etc.)

• Monitoring and Checking of Annexure clearance from NOKIA and other vendors.

Responsibility in TATA INDICOM O&M

• Report handling and escalating the problem to Project Manager.

• Maintain all the reports of sites and escalate the problem.

• Work as a bridge between TYCO ELECTONICS & TATA INDICOM

• Report Generation and Submission to the Project Manager and TATA INDICOM

• Escalate each and every problem occurred at site to both.

• Ability to analysis the Daily Network outage report and implement necessary action to rectify the problems.

• Resource management (manpower, vendor, spare).

PROJECT-1

Nutek India Pvt. Ltd

Location: Uttar Pradesh

Duration: October 2001 to May 2002

Designation: Site Engineer.

SYNOPSIS

• I was responsible for Outdoor & Indoor installation of Telecom Equipments in terms of RF feeder cable routing, Make connector and its groundings, IF cables routing and make connector , GSM & MW antennas at particular height and tilt, BTS & MW, EGB, IGB and etc.

TRAININGS ATTENDED

Attended Training on:

• NOKIA: Nokia BTS (Flexi + Ultra), Site Engineering and Telecom Installation Standards of Nokia.

• Nokia: Attended the two days training session on Quality Standards at Patna.

• ZTE: GSM SYSTEM, BTS (V2) OF ZTE at KOLKATA.

• ZTE: CELLULAR COMMUNICATION, GSM SYSTEM, BSC AND BTS (V2 ONLY), OMCR OF ZTE at BANGLORE.

• ZTE: Training attended for Civil and Tower Installation. Types of Foundation types of tower by Aster teleservices limited on the behalf of ZTE Telecom India Private Limited.

IT SKILLS

OPERATING SYSTEM: Windows, MS- DOS.

PROGRAMING LANGUAGES: C,

SOFTWARE PACKAGES: MS-Office, Power Point, Adobe Photoshop etc.

Functional Knowledge of GSM, RF, GPRS etc.

STRENGTH

• Quick learning capability.

• Capability of executing challenging assignments with right blend of intelligence, diligence and patience.

• Good verbal and written communication skills

• Comprehensive problem solving abilities.

• Ability to deal with people diplomatically

• Willing to relocate anywhere in India.

PERSONAL PROFILE

Name : Sanjay Kumar Singh

Father Name : Mr. Ram Vijay Singh

Date of Birth : 9 January 1981

Sex : Male

Permanent Address: Ramnagar, Kadma, Jamshedpur, Jharkhand.

Date: Sanjay Kumar Singh

Place:



Contact this candidate