Post Job Free
Sign in

Quality Control Project Manager

Location:
Melbourne, FL, 32905
Posted:
August 07, 2012

Contact this candidate

Resume:

*** ***** ***** ** ***#*** MELBOURNE, FL *****

MOBILE: 787-***-**** EMAIL: *********@*****.***

JOSE M. MARRERO

OBJECTIVE

Seeking for a Quality or Engineering position in a challenging, prestigious, dynamic and progressive organization where my academic and professional preparation is efficiently utilized in the goals and objectives of the company.

EDUCATION

• University of Puerto Rico – Mayagüez Campus, P.R..

o B.S. Civil Engineer – Completed on December 2006.

• Experience with AutoCAD, MS Office, P6 Primavera, RMS, Adobe and other admin/productivity tools.

PROFESSIONAL CERTIFICATIONS

• Construction Quality Management for Contractors (USACE).

• Concrete Field Testing Technician (ACI Certification).

• Occupational Safety And Health Administration (OSHA - 30 Hours Course).

• American Traffic Safety Services Association (ATSSA) certification.

• Bidwell Paver Certification ( Bidwell Facilities, South Dakota).

• Concrete Finishing Certification - National Center for Construction Education and Research (NCCER Concrete Certification Steamboat Springs, Colorado).

SUMMARY OF PROFESSIONAL QUALIFICATIONS

• Ample experience in concept development, implementation, and execution of engineering problems.

• Able to read and comprehend safety standards, plans, contract documents and specifications.

• Vast knowledge on numerous aspects of quality control processes.

• Mission-oriented skills; can analyze and correct last-minute critical operational problems and can apply solutions to difficult technical issues during field/office deployments.

• Working experience with surveying equipment including GPS.

• Exceptional teambuilding skills; able to establish mission goals, roles, instill membership, and lead.

• Fully bilingual (English/Spanish).

PROFFESIONAL EXPERIENCE

Dragados USA - Davie, FL I-595 Express Corridor Improvements Project - $100 Million

June 2012 – Present

Assistant Project Manager/Engineer

• Responsible for all field activities during the construction of the new I-595 Interstate.

• Assisting Project Manager in different aspects of the job including scheduling, organization, meetings with DOT and coordination with subcontractor to achieve milestones.

• Coordinated all field/office activities and monitor all work performed.

• Creating a good relationship with owner and subcontractors.

Bauer Foundations Co. – Canal Point, FL USACE Herbert Hoover Dike – TO#9 Rehabilitation Project -$4,500,000

December 2011 – June 2012

Contractor Quality Control Manager/Project Engineer

• Mediator for all the Quality Control matters with the US Corp of Engineers Quality Assurance Department.

• Responsible for implementing Contractors Quality Control Program effectively.

• Quality Control Management of all project elements. Responsible for the quality and contract of the construction seepage cutoff wall.

• Prepared submittals required prior to construction including Safety, Environmental and Production.

• Prepared Pre-Construction meetings per every definable feature of work to perform.

• Organized project safety plan per EM385 1.1 required by US Corp of Engineer.

• Prepared Contractor Daily Quality Control Reports an Tracking System.

• Ensured that construction is performed according to US Corp of Engineers Standards specifications.

• Gained experience with US Corp of Engineer Quality Control System management thru US Corp of Engineers Repository Management System (RMS).

Bauer Foundations Co. – Canal Point, FL USACE Herbert Hoover Dike - TO#5 Rehabilitation Project -$7,500,000

April 2011 – November2011

Contractor Quality Control Manager

• Coordinated with BFC employees and Subcontractors for all daily activities.

• Prepared Contractor Daily Quality Control Report.

• Ensured that construction is performed according US Corp of Engineers Standards specifications.

• Updated, maintained and/or verified a variety of project quality controls including Pre-drills track, Survey layouts and Cutter Soil Mixer tracking system as well as the density, viscosity, slurry volume, deviation and depth.

• Implemented a Quality Control Program (Surveying, Work Platform, Cut of Wall Construction and Testing).

• Construction meeting coordination. Prepared meeting agendas, and meeting minutes.

• Quality Control System management through US Corp of Engineers Repository Management System (RMS).

Kiewit Southern Co. – Melbourne, FL. I-95 Design/Build – FDOT Palm Bay Project - $24,000,000

October 2009 – April 2011

Project Engineer - Project Manager

• Coordinated with Subcontractors and lead our team to finish the remaining of the work.

• Developed an understanding of how to maintain quality control in the field and inspected the accomplished work to ensure that was aligned with the project scope of work.

• Ensured compliance with Contract Documents, Submittals and FDOT specifications.

• Created, updated and maintained a variety of project controls that track the status of: change orders, RFI’s, Shop Drawings and Submittals, matters involving quality controls, safety, environmental, financial performance and other aspects of the project.

• Executed all the Cost Forecast and Financial Plan of the job.

• Responsible for all subcontracts made on site, payments and change orders of subcontractors.

August 08 – October 2009

Bridge Superintendent

• Supervised and directed subordinate personnel and craftsmen in construction activities for the bridge work.

• Oversaw the Quality Control, Safety and the Environmental part of the job.

• Supervisor for the Demolition Operation of existing bridges on I-95.

• Built work includes Driven Piles, Mass Concrete Footers, Columns, Pile Caps, Girders setting, Abutments, Approach Slabs and Bridge Deck operation.

• Scheduled every activity to perform onsite including materials from subcontractors to meet our schedule

• Supervised all the safety issues of the crews including access, equipment needs, scaffolding and fall protection systems.

• Prepared work-plans for major tasks including Demolition Plan, Critical Lift Plans and Bridge Deck Pours.

• Managed all FDOT Pre-activity meetings for all major activities performed.

• Responsible for all the bridge work performed onsite and maintaining a safe environment in the project.

Kiewit Southern Co. – Cocoa, FL I-95 Design/Build - FDOT Cocoa Beach Project - $154,000,000

December 2006 – June 2008

Field/Office Engineer

• Responsible for creating work plans for field work, site inspections of work, Pre-pour inspections and equipment needs for the task.

• Complied with all safety and environmental requirements specified in the contract.

• Maintained first-level quality assurance of the installation of all work within discipline is in accordance with the plans and specifications including complying with all the environmental requirements.

• Managed all quantities tracking of subcontractors for the bridge departments including scheduling of material and services.

• Implemented Trend Charts of every major operation to track Cost and Man-hours utilized in the job.

Prepared pay form packages of subcontractors for payment.

Bauer Foundations Co. – Canal Point, FL USACE Herbert Hoover Dike - TO#5 Rehabilitation Project -$7,500,000

April 2011 – November2011

Contractor Quality Control Manager

• Coordinated with BFC employees and Subcontractors for all daily activities.

• Prepared Contractor Daily Quality Control Report.

• Ensured that construction is performed according US Corp of Engineers Standards specifications.

• Updated, maintained and/or verified a variety of project quality controls including Pre-drills track, Survey layouts and Cutter Soil Mixer tracking system as well as the density, viscosity, slurry volume, deviation and depth.

• Implemented a Quality Control Program (Surveying, Work Platform, Cut of Wall Construction and Testing).

• Construction meeting coordination. Prepared meeting agendas, and meeting minutes.

• Quality Control System management through US Corp of Engineers Repository Management System (RMS).

Kiewit Southern Co. – Melbourne, FL. I-95 Design/Build – FDOT Palm Bay Project - $24,000,000

October 2009 – April 2011

Project Engineer - Project Manager

• Coordinated with Subcontractors and lead our team to finish the remaining of the work.

• Developed an understanding of how to maintain quality control in the field and inspected the accomplished work to ensure that was aligned with the project scope of work.

• Ensured compliance with Contract Documents, Submittals and FDOT specifications.

• Created, updated and maintained a variety of project controls that track the status of: change orders, RFI’s, Shop Drawings and Submittals, matters involving quality controls, safety, environmental, financial performance and other aspects of the project.

• Executed all the Cost Forecast and Financial Plan of the job.

• Responsible for all subcontracts made on site, payments and change orders of subcontractors.

August 08 – October 2009

Bridge Superintendent

• Supervised and directed subordinate personnel and craftsmen in construction activities for the bridge work.

• Oversaw the Quality Control, Safety and the Environmental part of the job.

• Supervisor for the Demolition Operation of existing bridges on I-95.

• Built work includes Driven Piles, Mass Concrete Footers, Columns, Pile Caps, Girders setting, Abutments, Approach Slabs and Bridge Deck operation.

• Scheduled every activity to perform onsite including materials from subcontractors to meet our schedule

• Supervised all the safety issues of the crews including access, equipment needs, scaffolding and fall protection systems.

• Prepared work-plans for major tasks including Demolition Plan, Critical Lift Plans and Bridge Deck Pours.

• Managed all FDOT Pre-activity meetings for all major activities performed.

• Responsible for all the bridge work performed onsite and maintaining a safe environment in the project.

Kiewit Southern Co. – Cocoa, FL I-95 Design/Build - FDOT Cocoa Beach Project - $154,000,000

December 2006 – June 2008

Field/Office Engineer

• Responsible for creating work plans for field work, site inspections of work, Pre-pour inspections and equipment needs for the task.

• Complied with all safety and environmental requirements specified in the contract.

• Maintained first-level quality assurance of the installation of all work within discipline is in accordance with the plans and specifications including complying with all the environmental requirements.

• Managed all quantities tracking of subcontractors for the bridge departments including scheduling of material and services.

• Implemented Trend Charts of every major operation to track Cost and Man-hours utilized in the job.

Prepared pay form packages of subcontractors for payment.



Contact this candidate