*** ***** ***** ** ***#*** MELBOURNE, FL *****
MOBILE: 787-***-**** EMAIL: *********@*****.***
JOSE M. MARRERO
OBJECTIVE
Seeking for a Quality or Engineering position in a challenging, prestigious, dynamic and progressive organization where my academic and professional preparation is efficiently utilized in the goals and objectives of the company.
EDUCATION
• University of Puerto Rico – Mayagüez Campus, P.R..
o B.S. Civil Engineer – Completed on December 2006.
• Experience with AutoCAD, MS Office, P6 Primavera, RMS, Adobe and other admin/productivity tools.
PROFESSIONAL CERTIFICATIONS
• Construction Quality Management for Contractors (USACE).
• Concrete Field Testing Technician (ACI Certification).
• Occupational Safety And Health Administration (OSHA - 30 Hours Course).
• American Traffic Safety Services Association (ATSSA) certification.
• Bidwell Paver Certification ( Bidwell Facilities, South Dakota).
• Concrete Finishing Certification - National Center for Construction Education and Research (NCCER Concrete Certification Steamboat Springs, Colorado).
SUMMARY OF PROFESSIONAL QUALIFICATIONS
• Ample experience in concept development, implementation, and execution of engineering problems.
• Able to read and comprehend safety standards, plans, contract documents and specifications.
• Vast knowledge on numerous aspects of quality control processes.
• Mission-oriented skills; can analyze and correct last-minute critical operational problems and can apply solutions to difficult technical issues during field/office deployments.
• Working experience with surveying equipment including GPS.
• Exceptional teambuilding skills; able to establish mission goals, roles, instill membership, and lead.
• Fully bilingual (English/Spanish).
PROFFESIONAL EXPERIENCE
Dragados USA - Davie, FL I-595 Express Corridor Improvements Project - $100 Million
June 2012 – Present
Assistant Project Manager/Engineer
• Responsible for all field activities during the construction of the new I-595 Interstate.
• Assisting Project Manager in different aspects of the job including scheduling, organization, meetings with DOT and coordination with subcontractor to achieve milestones.
• Coordinated all field/office activities and monitor all work performed.
• Creating a good relationship with owner and subcontractors.
Bauer Foundations Co. – Canal Point, FL USACE Herbert Hoover Dike – TO#9 Rehabilitation Project -$4,500,000
December 2011 – June 2012
Contractor Quality Control Manager/Project Engineer
• Mediator for all the Quality Control matters with the US Corp of Engineers Quality Assurance Department.
• Responsible for implementing Contractors Quality Control Program effectively.
• Quality Control Management of all project elements. Responsible for the quality and contract of the construction seepage cutoff wall.
• Prepared submittals required prior to construction including Safety, Environmental and Production.
• Prepared Pre-Construction meetings per every definable feature of work to perform.
• Organized project safety plan per EM385 1.1 required by US Corp of Engineer.
• Prepared Contractor Daily Quality Control Reports an Tracking System.
• Ensured that construction is performed according to US Corp of Engineers Standards specifications.
• Gained experience with US Corp of Engineer Quality Control System management thru US Corp of Engineers Repository Management System (RMS).
Bauer Foundations Co. – Canal Point, FL USACE Herbert Hoover Dike - TO#5 Rehabilitation Project -$7,500,000
April 2011 – November2011
Contractor Quality Control Manager
• Coordinated with BFC employees and Subcontractors for all daily activities.
• Prepared Contractor Daily Quality Control Report.
• Ensured that construction is performed according US Corp of Engineers Standards specifications.
• Updated, maintained and/or verified a variety of project quality controls including Pre-drills track, Survey layouts and Cutter Soil Mixer tracking system as well as the density, viscosity, slurry volume, deviation and depth.
• Implemented a Quality Control Program (Surveying, Work Platform, Cut of Wall Construction and Testing).
• Construction meeting coordination. Prepared meeting agendas, and meeting minutes.
• Quality Control System management through US Corp of Engineers Repository Management System (RMS).
Kiewit Southern Co. – Melbourne, FL. I-95 Design/Build – FDOT Palm Bay Project - $24,000,000
October 2009 – April 2011
Project Engineer - Project Manager
• Coordinated with Subcontractors and lead our team to finish the remaining of the work.
• Developed an understanding of how to maintain quality control in the field and inspected the accomplished work to ensure that was aligned with the project scope of work.
• Ensured compliance with Contract Documents, Submittals and FDOT specifications.
• Created, updated and maintained a variety of project controls that track the status of: change orders, RFI’s, Shop Drawings and Submittals, matters involving quality controls, safety, environmental, financial performance and other aspects of the project.
• Executed all the Cost Forecast and Financial Plan of the job.
• Responsible for all subcontracts made on site, payments and change orders of subcontractors.
August 08 – October 2009
Bridge Superintendent
• Supervised and directed subordinate personnel and craftsmen in construction activities for the bridge work.
• Oversaw the Quality Control, Safety and the Environmental part of the job.
• Supervisor for the Demolition Operation of existing bridges on I-95.
• Built work includes Driven Piles, Mass Concrete Footers, Columns, Pile Caps, Girders setting, Abutments, Approach Slabs and Bridge Deck operation.
• Scheduled every activity to perform onsite including materials from subcontractors to meet our schedule
• Supervised all the safety issues of the crews including access, equipment needs, scaffolding and fall protection systems.
• Prepared work-plans for major tasks including Demolition Plan, Critical Lift Plans and Bridge Deck Pours.
• Managed all FDOT Pre-activity meetings for all major activities performed.
• Responsible for all the bridge work performed onsite and maintaining a safe environment in the project.
Kiewit Southern Co. – Cocoa, FL I-95 Design/Build - FDOT Cocoa Beach Project - $154,000,000
December 2006 – June 2008
Field/Office Engineer
• Responsible for creating work plans for field work, site inspections of work, Pre-pour inspections and equipment needs for the task.
• Complied with all safety and environmental requirements specified in the contract.
• Maintained first-level quality assurance of the installation of all work within discipline is in accordance with the plans and specifications including complying with all the environmental requirements.
• Managed all quantities tracking of subcontractors for the bridge departments including scheduling of material and services.
• Implemented Trend Charts of every major operation to track Cost and Man-hours utilized in the job.
Prepared pay form packages of subcontractors for payment.
Bauer Foundations Co. – Canal Point, FL USACE Herbert Hoover Dike - TO#5 Rehabilitation Project -$7,500,000
April 2011 – November2011
Contractor Quality Control Manager
• Coordinated with BFC employees and Subcontractors for all daily activities.
• Prepared Contractor Daily Quality Control Report.
• Ensured that construction is performed according US Corp of Engineers Standards specifications.
• Updated, maintained and/or verified a variety of project quality controls including Pre-drills track, Survey layouts and Cutter Soil Mixer tracking system as well as the density, viscosity, slurry volume, deviation and depth.
• Implemented a Quality Control Program (Surveying, Work Platform, Cut of Wall Construction and Testing).
• Construction meeting coordination. Prepared meeting agendas, and meeting minutes.
• Quality Control System management through US Corp of Engineers Repository Management System (RMS).
Kiewit Southern Co. – Melbourne, FL. I-95 Design/Build – FDOT Palm Bay Project - $24,000,000
October 2009 – April 2011
Project Engineer - Project Manager
• Coordinated with Subcontractors and lead our team to finish the remaining of the work.
• Developed an understanding of how to maintain quality control in the field and inspected the accomplished work to ensure that was aligned with the project scope of work.
• Ensured compliance with Contract Documents, Submittals and FDOT specifications.
• Created, updated and maintained a variety of project controls that track the status of: change orders, RFI’s, Shop Drawings and Submittals, matters involving quality controls, safety, environmental, financial performance and other aspects of the project.
• Executed all the Cost Forecast and Financial Plan of the job.
• Responsible for all subcontracts made on site, payments and change orders of subcontractors.
August 08 – October 2009
Bridge Superintendent
• Supervised and directed subordinate personnel and craftsmen in construction activities for the bridge work.
• Oversaw the Quality Control, Safety and the Environmental part of the job.
• Supervisor for the Demolition Operation of existing bridges on I-95.
• Built work includes Driven Piles, Mass Concrete Footers, Columns, Pile Caps, Girders setting, Abutments, Approach Slabs and Bridge Deck operation.
• Scheduled every activity to perform onsite including materials from subcontractors to meet our schedule
• Supervised all the safety issues of the crews including access, equipment needs, scaffolding and fall protection systems.
• Prepared work-plans for major tasks including Demolition Plan, Critical Lift Plans and Bridge Deck Pours.
• Managed all FDOT Pre-activity meetings for all major activities performed.
• Responsible for all the bridge work performed onsite and maintaining a safe environment in the project.
Kiewit Southern Co. – Cocoa, FL I-95 Design/Build - FDOT Cocoa Beach Project - $154,000,000
December 2006 – June 2008
Field/Office Engineer
• Responsible for creating work plans for field work, site inspections of work, Pre-pour inspections and equipment needs for the task.
• Complied with all safety and environmental requirements specified in the contract.
• Maintained first-level quality assurance of the installation of all work within discipline is in accordance with the plans and specifications including complying with all the environmental requirements.
• Managed all quantities tracking of subcontractors for the bridge departments including scheduling of material and services.
• Implemented Trend Charts of every major operation to track Cost and Man-hours utilized in the job.
Prepared pay form packages of subcontractors for payment.