Post Job Free
Sign in

Project Manager Engineer

Location:
United States
Posted:
March 14, 2012

Contact this candidate

Resume:

ANDRES NALIM FERIA HUERTA

Address: *** **** ****** ****, *** Marcos Tx. Cp 78666

Double Nationality

Relocation

Age: 28

Phone number: 512-***-****

Objectives:

Based on my academic training and my professional experience in the automotive and metallurgical industry, I ll apply the knowledge gained to contribute to exceed the objectives and goals of the organization by continuous improvement, quality cost reduction and be part of a highly effective, inclusive and result-oriented.

Education:

2011 Universidad Popular Autónoma del Estado de Puebla México, Puebla

• Master s degree in Logistics management and supply chain

2007 Universidad Popular Autónoma del Estado de Puebla México, Puebla

• College s degree in industrial engineering

Professional Experience:

2012 CARPENTER – STEELS. Process Engineer (Metallurgy)

Carpenter is a leader in the development, manufacture and distribution of cast/wrought and powder metal stainless steels and specialty alloys including high temperature (iron-nickel-cobalt base), stainless, superior corrosion resistant, controlled expansion alloys, ultra high-strength and implantable alloys, tool and die steels, and other specialty metals as well as cast/wrought titanium alloys.

• Directly responsible to meet the demand and specifications of our client GE-TOSHIBA (GTTC). Production planner and coordinator, monitoring processes and implementing control charts (average and ranges) to meet, control and compare the corrective actions for the process variation, meeting sales targets and company standards of quality specified. Material Handling (correct identification and status), inventory control, entry and exit of materials. Follow-up claims by and applying analysis tools for non-occurrence, achieving a system of continuous improvement in the process. Management and coordination of personnel. Active participation to obtain certification in Standard AS 9120. Productivity and efficiency rises by 20%, performing balancing lines, developing suppliers and standardizing cutting parameters.

2009 KIEKERT DE MEXICO Quality Engineer (Automotive)

Company dedicated to the assembly of door latches for the automotive industry, major customers Ford, Chrysler, General Motors and Volkswagen. Monthly production of about 1 million door latches per month.

• Q1 recognition achieved 7 Ford assembly plants where latches are sent. First time that the company gets 0 PPM in Ford history (5 consecutive months). Responsible for implementing the analysis area of rejected pieces in the process. Implementation of Ford IPM (In-Process Metrics) for monitoring of metrics such as process capability, planning review of documentation APQP (PC and FMEA-P), coordination of engineering changes and follow up on problem solving (8D's) Deployment Ford "Paynter Chart" at the plant level for evaluation of defects and scrap reduction through the generation of corrective actions focused on the implementation of error-proof devices to prevent recurrence. Responsible for monitoring and calculating process capability on critical stations using control charts for decision making. (10 production assembly lines) responsible for blocking/put on hold suspicious material and campaigner for various situations inspection quality.

Professional Service:

2008 PEMEX Petro chemistry. Assistant of coordinator Quality Management Systems

• Responsible for monitoring systems ISO 9001-2000, ISO 14001-2004, Security System and Environmental Protection. Responsible for tracking corrective and preventive actions arising from external and internal audits. Responsible for monitoring and control of the objectives board of the Quality department. Effective audits developer in security issues. Implementation of operational discipline (procedures). Report development and collaboration of the National Quality Award.

2006 Textile Plant.

• Time and motion studies

Knowledge:

• Norm ISO14000, ISO TS16949 e ISO9000, AS9120

• Lean Manufacturing Tools (VSM, 5S’s, SMED , TPM, SW)

• Statistics applied to production processes (SPC)

• SAP R/3 Versión 4.7 Octubre 2008

• Control Plan

• Flowchart

• AMEF Process

• Ford – Paynter chart, IPM

• 8D s

• 15 Why s

• PPAP

• APQP

• Office, Microsoft Project

Skills:

• Divergent thinking and systematic.

• Perseverance and decided to achieve goals.

• Ability to learn quick and change adaption.

• Ability to work in teams.

• Ability to work under pressure and result oriented.

• Good negotiator and leadership.

Personal References:

• Paul Childs, Quality Engineer. Keykert USA.

Cell. +001-810-***-**** E-mail: ****.******@*******.***

• Antonio Maldonado García Program Quality Leader “Faurecia USA”

Cell, 205-***-**** E-mail: *******.*********@********.***

• Brian Couture, Project Manager. Keykert USA.

E-mail: *************@**********.***



Contact this candidate