Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Qatar
Posted:
September 19, 2012

Contact this candidate

Resume:

M O H A M M E D A L I S A A D

Address: - * Hassan Refat St, sidi Beshr, Alexandria.

- El moez street, Edkou, Elbehira.

E-Mail: tqu6b6@r.postjobfree.com

Mobile: +2-012******** / +2-011********.

PERSONAL INFORMATION:

1 Date of Birth : 17/2/1982

2 Marital Status : Single.

3 Military Status : Exempted.

4 Nationality : Egyptian.

5 Driving License : Yes

EDUCATION:

■ B.Sc. Mechanical Engineering.

Graduation project "water treatment stations”: excellent.

WORK HISTORY

COMPANY : KHARAFI NATIONAL (KN) (EPC) (NOV 2010 till NOW)

(For Mechanical& Electrical Works S.A.E)

PROJECT: ELSHABAB SIMPLE CYCLE GAS TURBINE UNITS (G.E) (Fast track project) (Power Project).

CLIENT: EAST DELTA COMPANY (EDEPC).

CONSULTANT: PEGASCO.

ABOUT THE PROJCT: The project is one of power plant projects to build a new 1000-MW (G.E ) eight units simple cycle gas power plant at ELSHABA (ISMAEALIA).

JOP TITLE: -QA/QC ENGINEER.

TASKS: - RESPONSIBLE FOR THE QUALITY CONTROL ACTIVITY OF THE MECHANICAL CONSTRUCTION WORKS IN ALL 9E TURBINES UNITE (AUX., TURBINE, GENERATOR, PIPING, STACK (PLATE WORKS), STEEL STRUCTURE AND OTHER SKIDS).

COMPANY : PROCTER & Gamble (P&G). (JAN 2010 till SEP 2010)

PROJECT: THE NEW PRODUCTS EXTENTION (BAR SOAP BIULDING) (projects).

ABOUT THE PROJCT: The project one of new extensions for the Cairo plant to serve the production targets, the project contains c.s & s.s piping(Faire Fighting and compressed air system), equipment (compressors, blowers,cheliers and pumps),HVAC,ducts,plat work in the dust control systems and steel structure work.

JOP TITLE: - SITE MECHANICAL MANAGER (Resident Engineer for the Client).

TASKS: - RESPONSIBLE FOR MANAGE, ARRANGE, MONITORING AND RECEIVING THE MECHANICAL CONSTRUCTION WORKS (EQUIPMENTS, PIPING AND STEEL STRUCTURE) AND FOLLOW UP THE CONTRACTORS PERFORMANCE.

(Safety, Quality and progress).

COMPANY : (VSA) Consortium (QATAR). (EPC) (DEC 2008 till DEC 2009)

Veolia water (P) Saipem(E) Aljaber(C)

CLIENT: SHELL & QATAR GAS

PROJECTS: PEARL GTL (Gas to Liquid)(Oil &Gas field).

ABOUT THE PROJCT: The project is the world's largest gas to liquids (GTL) plant; Pearl GTL is a major step towards meeting the world’s growing demand for cleaner energy.

The plant, a joint development by Qatar Petroleum and Shell.

JOP TITLE: -SENIOR QA/QC ENGINEER (workshop &site).

TASKS: -RESPONSIBLE QA/QC PIPING AND PAINTING TASKS.

(SHELL STANDARDS)

Piping

Responsible for the piping works:-

- Metallic C.S, S.S.

-Non metallic GRP.

(Fabrication and erection) According to SHELL specifications and standards.

Attend in piping two star audits.

Applied the weekly Surveillance for piping FSI (flawless startup initiative) with shell representative and taking the corrective action.

Painting

Monitoring the painting subcontractor (KAEFER) to apply SHELL painting systems in the gulf area ambient conditions with all respect to SHELL requirements in FSI and preservation. With HEMPEL as paints vendor.

Attend in painting star audits.

COMPANY : ALEX FIBER (AFCO). (AUG 2008 till DEC 2008)

PROJECTS: - LINES II &III.( petrochemical)

ABOUT THE PROJCT: The project is the only Acrylic Fiber plant in Africa and Middle-east region, The plant has the most modern acrylic fiber manufacturing technology from Japan Exlan. The basic engineering done by Kawasaki Heavy Industries Limited, Japan.

The basic work conditions same as the petrochemical plant.

JOP TITLE: - QUALITY CONTROL MANAGER(for the client).

TASKS: -RESPONSIBLE FOR ALL QA/QC TASKS (PIPING, INSTRUMENTES, TANKS,

PUMPS AND EQUIPMENTS) AND FOLLOW UP THE CONTRACTORS PERFORMANCE.

Piping

Responsible for all piping works (fabrication and erection)

MECHANICAL (Equipments, Pumps, Tanks)

COMPANY : ARESCO (ASEC). (AUG 2006 till AUG 2008)

POWER PROJECTS

PIPING

PROJECTs: - EAST DELTA ELECTRICAL PRODUCTION

CAMPANY (NEW TALKHA) (CMI) (workshop)

ABOUT THE PROJCT: The project is one of power plant projects to build a new 750-MW combined cycle power plant at Talkha.

JOP TITLE: Quality Engineer& Quality coordinator.

Responsible for the final release and all documentation package for power station plant projects

(Dimension, traceability, visual, internal cleaning, painting, NDT, ASME list for U or P stamp by dealing with A.I)

1 Visual inspection for welding connections.

2 Inspection for NDT methods.

CEMENT PROJECTS (EPC).

MECHANICAL,PLATE WORK AND STEEL STRUCTURE (workshop). (AWS D1.1)& (FLS spec.)

PROJECTS: - SINA GRAY PHASE 2, (workshop& site)

- MAINTINANCE OF AMRIA FOR CEMENT (workshop),

- EL TAKAMOL – CEMENT – SUDAN (workshop),

- MASGORDN – CEMENT – SUDAN (workshop).

JOP TITLE: Deputy Q.A/Q.C Head (Q.C site manager).

TASKS: - RESPONSIBLE FOR THE QUALITY CONTROL ACTIVITY OF THE MECHANICAL CONSTRUCTION WORKS IN ALL CEMENT PLANT, HANDLING OVER TO THE CLIENT AND THE COMPANY REPRESENTITIVE IN THE OFFICIALY MEETING.

COMPANY : (I.B.S.F) INTERNATIONAL COMPANY OF MANUFACTORING

BOILERS AND STEEL STRUCTURE. (DEC 2005 till AUG 2006)

PROJECTS : - NORTH CAIRO POWER STATION (NEM) (Power Project),

- METKA (ALSTOME) (Power Project).

JOP TITLE: Quality Engineer

Fabrication the drums and the main piping of boilers.

Fabrication the main steel structure for boiler (built up sections)

The main coordinator Between (I.B.S.F) and (ESACO):

COMPANY : ARESCO (ASEC). (NOV 2004 till DEC 2005)

Piping

PROJECTS: - ALEX FIBER (sit) LINE I. (ASME B 31.3)

Quality Control Engineer.

Attending the (Alex fiber) start up until finishing.

CERTIFICATIONS &QUALIFICATIOS courses

QUALITY :

CSWIP 3.1 (Cert. NO. 55285)

(EXIPIRY: 18 02 2015)

METHOD OF VISUAL TEST (VT

METHOD OF RADIOGRAPHIC TEST (R.T).

METHOD OF ULTRASONIC TEST (U.T).

METHOD OF MAGNETIC PARTICLE TEST (M.T).

METHOD OF LIQUID PENETRANT TEST (P.T).

SAFETY:

OSHA GENERAL INDUSTRY SAFETY & HEALTH TRIANING.

RISK ASSESSMENT & HAZARD CONTROL.

(SHELL/BRITISH COURSES):-

INTRODUCTION TO HSSE & LEADERSHIP.

SUPERVISION WITHIN LIFE CRITICAL ACTIVITIES.

LIFTING & RIGGING.

TRAIN THE TRAINER.

INCIDENT AND INJURY FREE SUPERVISOR SKILLS.

HAS THE BRONZE BADGE FROM PEARL GTL.

OTHER:

TANK DESIGN AND MAINTENANCE.

Attending 30 hours in Enppi.

PAINTING &COATING.

Attending 30 hours in Enppi.

MANUFACTURING OF (HRSG) PRESSURE AND NON PRESSURE PARTS.

Attending the Cairo north power station // project (NEM).

QUALITY AWARD.

VSA CONSURTIME / project GTL (Gas to Liquid). ETP (Effluent Treatment Plan) (C08). (SHELL).

MANEGMENT AND PLANNING:

PRODUCTIVITY THROUGH PLANNING & ORGANISING.

PRIMAVERA.

SKILLS:

Language Skills:

1 Arabic : Mother Language.

2 English : Excellent.

3 Italian : good.

Computer Skills :

Primavera.

Matlabe.

Microsoft XP.

Microsoft word.

Microsoft Excel.

Internet.

OTHER SKILS AND HOBBIES:

1 Ability to learn new tasks quickly. And to take Responsibility.

2 .Ability to work as an efficient member in teamwork.

3 Ability to work under pressure.

4 Computer, Internet, Reading, Sports.



Contact this candidate