Post Job Free
Sign in

Engineer Project

Location:
United States
Salary:
8000-10000usd/month
Posted:
June 25, 2012

Contact this candidate

Resume:

RESUME

NAME : Andy Mavromoustakos

NATIONALITY : U.S. Citizen /E.U. Citizen (Greek)

ADDRESS : *** ******** ********, ******** *****, ATHENS, GREECE

HOME TEL. : +30-210-*******, +30-697*-******),

OBJECTIVE : Pre-commissioning / Commissioning Manager/Project engineer

E-MAIL : ********@*****.**

EDUCATION AND TRAINING

Graduated NAVAL ACADEMY of Greece (1967) BSC Marine Engineering

NEW YORK UNIVERSITY, Diploma in Auto Controls

FOXBORO Co., SPEC 200 Systems, Control Systems Eng.

GENERAL ELECTRIC Co., Speedtronics, Gas Turbine Operation

BAILEY Co., Boiler Operation Controls

CYBEREX Co., UPS

Time Management, effective writing, effective supervision, job perception, effective communications, performance appraisal, coaching and counseling.

PROFILE

As Pre-commissioning/Commissioning Manager

Developed the system and sub system definition tables.

Wrote method statements for leak tests, purging and inerting piping systems and pipeline.

Developed start-up sequences, commissioning schedules, risk assessment documents and

Pre start up safety review activities.

Coordinated the development of the commissioning and pre commissioning manual

Conducted P&ID reviews and hazop studies.

Review and approved sub contractors for their ability to conduct specialized pre- commissioning and commissioning activities.

Follow up of the contract’s milestones and completion dates.

Manage the team of supervisors for the flushing, air blowing and steam blowing of all piping, lube oil flushing of the compressors, lube oil mist systems, solo run of motors and turbines, mechanical run in of pumps and fin fan coolers and pre- commissioning of all instrumentation(esd,dcs,scada)

As instrumentation commissioning engineer:

Coordinated the team for the bench calibration, loop checking, loop testing, continuity and megger tests.

All DCS and ESD signals were verified inclusive the sub stations.

As Instrumentation design engineer:

Developed material requisitions for control valves, On-off valves, relief valves, orifice plates, flow instruments, pressure instruments, level instruments, analyzers, temperature and specialty instrumentation.

Developed cause and effect matrixes, I/O lists and LOGIC diagrams for the DCS & ESD material requisitions. Coordinated with the DCS & ESD vendors for the implementation of complex loops, Controller actions, and fail position of the controllers during ESD.

Mark the P&ID”s for the correct symbols according to I.S.A. check the loop presentation and the relevant piping specs.

Develop and maintain the instrument index, check the design group’s cable and coil schedules, process details, air details, electrical details, steam tracing details and the loop diagrams.

CAREER SUMMARY

Sept.2009 – present Technical Reunidas

Project engineer

Elefsis refinery upgrade(Athens,Greece)

Coordinate all technical activities on assigned project (Vacuum distillation unit).

I coordinate the assigned engineering work and monitor for compliance to applicable codes and accepted engineering practice and the requirements of the contract are being satisfied.

I have the responsibility for the quality and effective execution of the project assigned.

The typical duties are as follows:

Project engineering schedules and forecasts.

Coordination and checking of engineering deliverables.

Monthly project status reports and change orders

Planning, scheduling and coordinating the technical aspects of the project.

Regular contact with assigned project Clients

Client/contractor meetings and resolving Client/engineering and management project issues.

Nov.2008 – June 2009 J&P OVERSEAS

Instrumentation Commissioning suptd.

Nuayim Gosp Riyad Saudi Arabia for Aramco

In charge of all instrumentation commissioning activities.

3500 signals were simulated from the field to DCS,ESD and Substation

January 2007 – June 2008 CCC (CONSOLIDATED CONTRACTORS)

Commissioning Manager

EGDS Project Abu Dhabi, U.A.E.

Natural Gas Distribution System for DOLHIN ENERGY

Developed the system and sub system definition tables based on the Opercom method

Developed the data base for populating TOTAL’s ICAPS software.

Wrote method statements for leak tests, purging and inerting piping systems and pipeline. Developed start-up sequences, commissioning schedules and managed the static and dynamic tests.

Coordinated the development of the commissioning and pre commissioning manual, the pre start up safety review activities and issue the ready for commissioning certificates to the client.

Oversee the loop cheks,loop tests, cable tests, sub station cheks,mechanical equipment checks and wrote the relevant risk assessment documentation.

Conducted P&ID reviews to ensure that all required connections, piping and instruments were available for the pre commissioning and commissioning activities.

Review and approved sub contractors for their ability to conduct specialized pre commissioning and commissioning activities.

Follow up of the contract’s milestones and completion dates.

March 2006 – N0vember 2006 CCC (CONSOLIDATED CONTRACTORS)

Pre Commissioning Superintendent

BAHRAIN PETROLEUM COMPANY-MANAMA.

Sulphur unit. Hydrogen unit, Hydrocracker unit

Ensure all necessary Permits, Licenses and other Compliance requirements are in place. Technical data reviews, writing sections of the operating manuals, assisting in preparation of cause and effect charts, in configuration of control systems. Prepare start up philosophies commissioning plans, and application / operating procedures, prepare / set up custody transfer documents for use in the field and ensure that HSE aspects are properly implemented on the project. On site will also include assisting in plant check against technical documents / data, carrying out equipment inspections against specifications, preparing detailed application / operation procedures. With the discipline engineers, carry out, functional tests of equipment and systems.

1990- 2005 ASPROFOS ENGINEERING S.A (Foster Wheeler GREECE)

Commissioning Superitendent - Instrumentation

(At Hellenic Refinery of Aspropyrgos, Greece)

The duties and responsibilities include the following: Organize and conduct construction review meetings, resolve any problems, and approve/record any design modifications. Inspect and verify supplied materials upon delivery at site and prior to be incorporated into the project. Coordinate field inspection activities and witness field-testing. Carry out final inspection of finished works, and provide assistance during the commissioning / start-up of the units. Approve the Site Acceptance Tests of the DCS, ESD, and SCADA Systems. Review/approve the “as built” drawings supplied by the Contractors.

Plants Commissioned

New Boiler, Sulphur unit, Atmospheric & vacuum distillation units, Benzene saturation unit ,P/P splitter, Tame, PVC Pipeline Metering Stations ,Bottom Truck Loading unit, Marine loading arms unit.

1987 - 1990 SELF EMPLOYED

From 1987 started a consulting engineering firm with main activity H.V.A.C. Installations in commercial building.

ARABIAN AMERICAN OIL CO. SAUDI ARABIA (1978-1986)

Superintendent Maintenance Training Division

Managed craft skills training programs. Monitored staff of 80 instructors and 900 trainees. Developed track systems, job standards, and quality control measures. Controlled job perception exercises and needs analyses. Coordinated vendor training and supervised the administration unit. Annual budget of US$ 6mm.

Construction Engineer - Commissioning

Initiated calibration, testing and modification of instrument loops. Reviewed PID’s and PFD’s. Developed operating windows and system curves. Shutdown circuits were simulated and trained plant personnel.

Plants Commissioned

WIP Stations at UTHMANIYA,(frame 5 GE gas turbines)Sea water treatment plant at QHURAIYA, Gosps at ABQAIQ,

Gas plant at SHEDGUM & YANBOO, Stabilizers, Burner management systems for 5 boilers

at ABQAIQ.

(1977-1978) STONE AND WEBSTER ENG. 2 PENN PLAZA NEW YORK, NY

Instrument Engineer Ethylene Plants

(1976-1977) STAUFFER CHEMICALS DOBBS FERRY NEW YORK

Instrument Engineer Thioacid and Intermediates plant

(1974-1976) CHEMICO 2 PENN PLAZA NEW YORK NY

Instrument Engineer NH3 (AMMONIA) Plants

(1970-1974) WESTVACO – 699 PARK AV. NY.

Instrument Engineer – Pulp and Paper

(1968-1970) M.W KELLOGG 711 3rd AV. NEW YORK Piping analytical



Contact this candidate