Mark Brahn
*** ******** *****, ***********, ***** 76087
Home phone: 817-***-**** – Mobile: 817-***-****
Email: *******@***.***
Project management experience including migrations of hardware and software plus software upgrades program wide. Work with multiple Integrated Product Teams (IPTs) locally and remote sites, partners, subcontractors and the customer. Hold current Top Secret clearance. IT Lead for Data Center expansion and consolidation projects between facilities department, construction contractors and IT personnel for program. Demonstrate dedication to program and project customer satisfaction, deliveries and relationships going forward. Previous Simulation Lead responsibilities focused on project requirements and deliveries.
TECHNICAL SKILLS
Project Management
Data Center Operations
Windows Servers and Workstations
Microsoft Exchange
Microsoft Office products
Serena Dimensions 9.x, 2009R2
Microsoft Project
VERITAS backup
PROFESSIONAL EXPERIENCE
Lockheed Martin Aeronautics
Fort worth, Texas
Engineer Sr. Staff 2007 to 2012
Lead for project involving multiple departments and disciplines across multiple sites. Created and managed schedules involving multi-year efforts. Interface with partners, subcontractors and our customer on a regular basis. Work with Sr. Management at remote sites to identify and schedule qualified personnel to meet project schedule requirements. Work with IPTs to report status to management and customer as project Hardware Integrator.
• Implemented program wide asset management plan for migration project as Hardware Integrator
Documented hardware and software across the program to create asset baseline
Encompassed in-house, partners and subcontractors sites
Created database to track all computer hardware to be migrated
Minimized downtime for critical systems used for program deliverables
Enabled rapid metric reporting for Sr. Management and Customer
• Managed 3rd party hardware maintenance and parts suppliers
Utilized supplier relationships to identify unique parts to minimize system downtime
Located suppliers for replacement/remanufactured (non-OEM) obsolete parts
Minimized cost and response times for Subcontractor maintenance
• Managed migration Risks and Solutions through mitigation and contingency planning
Project risks varied according to when and if each individual risk was realized
Time estimations were days to unknown
Cost estimations were from $Ks to potentially $Ms
Mitigation plan identified potential points of failure and documented proactive solutions to minimize program impact during project Period of Performance (PoP)
Created Contingency plan to document process to handle risk once realized during or beyond project PoP
Unique assets identified for expediting repairs/replacement of system failures in both Mitigation and Contingency plans
• Led effort to create and maintain program wide document “Project Roadmap” describing multi-year project that spanned multiple contracts
Project has spanned 5 years and 3 contracts – project PoP ends in 2014
Document was delivered on-time and cost as defined in Contract Deliverable Required Line (CDRL) item
Project Roadmap documented individual IPT migration processes
Identified tool migration activities per IPT and cross IPTs
Estimated cost and timing for migration activities used in Integrated Master Schedule (IMS)
Document was revisited annually for process correctness and completions
• Led research for hardware emulation
Emulation has saved the program $M in one of multiple sites
Wrote white paper for justification and approval by customer
Evaluation, testing and ultimately customer approval was completed within 6 months
Emulation is now used in-house, and at subcontractor sites
• Led internal funded hardware migration project
Project justification approved by leveraging from larger contract funded migration project
Used asset management plan and Project Roadmap to identify dependencies between projects
Developed project scope and schedule by involving all known stake holders
Interfaced with IPTs to identify manpower estimates and tasking levels for project schedule
• Support user community with Serena Dimensions configuration management (CM) software as well as interfacing with other products
Lockheed Martin Enterprise Information Systems
Fort worth, Texas
Team Lead/Systems Administrator Sr. 2002 to 2007
Lead for closed environment Data Center operations. IT Lead for Data Center expansion and consolidation project between facilities department, construction contractors and IT personnel for program. Technical Team Lead responsible for servers and desktop systems, as well as day to day operations for multiple closed environments. Interface for new security requirements for all systems on multiple networks. Lead system administrator for all Windows platforms on program closed networks.
• Data Center Operations Lead
Maintained maintenance requirements on all servers
Vendors, manufacturers and other suppliers
Scheduled personnel for PM down time and coordinated with IPTs and users
Interfaced with facilities for repair and maintenance (HVAC and electrical power)
Implement and enforce Automated Information Systems (AIS) security policies as required
Interfaced with sub-contractors for connectivity on multiple closed networks
• Data Center Expansion and Consolidation Lead
Main Point of Contact (POC) for all existing and proposed system requirements
Defined and maintained power and HVAC needs for existing and proposed equipment
Coordinated network moves within center with minimum impact to program
Coordinated all IT changes proposed to program management for review and approval
$1.2M Project was completed on time without impact to any program deliveries
• Technical Team Lead for servers and desktop operations
Responsible for all desktop deployments to users
Coordinated software and system upgrades
Scheduled all server and desktop refreshes
Coordinated with program security to update any AIS security requirements
Supported server applications including Lotus Domino Sametime and Microsoft Exchange
Computer Sciences Corporation
Fort worth, Texas
Systems Administrator Sr. Staff 1991 to 2002
Lead for all Data Center operations and communications for multiple closed environments. Lead for both local and remote computer facilities for closed environments. POC for closed area Y2K update project. Lead for program as AIS IT security POC on initial closed program.
• Data Center Lead for multiple closed environments
Manage replacement parts for all systems to reduce cost and minimize
Operation of all systems (servers and workstations) including UNIX, VMS, Apple’s and PC’s
System maintenance and contracts on systems including local and remote sites
Responsible for all backups, storage requirements, repairs and upgrades
Coordinate and perform multiple moves for local and remote site Data Centers
Included multiple programs, users, software (SW) and hardware (HW) and sites
IT facility requirements, system integrity and network configuration
• POC for Y2K in the closed areas for all platforms
Coordination of all patches required for all platforms
Software upgrades
Licensing requirements and upgrades
• AIS Security Lead for closed area
POC for program inspections by customer
Wrote Information Technology (IT) portion of System Security Procedures (SSP) for program and received Certificate of Commendation from the Department of Defense (DOD) in 1992
General Dynamics
Fort Worth, Texas
Software Engineer Sr. 1982 to 1991
EDUCATION
MS in Project Management
Embry-Riddle Aeronautics University - 2011
Bachelor of Science Degree, Computer Science and Mathematics
University of Texas Permian Basin (UTPB) - 1982