PROJECT MANAGER
PROFESSIONAL REGISTRATION
PE AZ # 38792 TX # Pending
PROFESSIONAL EXPERIENCE
Newland Communities – Phoenix, AZ August 2006- Present
Project Manager
Responsible for project management of large water, waste water, and paving infrastructure projects in Estrella master planned community
Managed the construction of 5 million gallon water storage and booster facility
Managed the design of 1 million gallon reverse osmosis water treatment facility with brine disposal facilities
Managed the design and construction of several miles of 16-inch to 30-inch water transmission and distribution mains
Solicited bids and awarded contracts for water, sewer, paving, concrete, and irrigation installations for infrastructure and builder parcel projects
Monitored community for 404, Dust Control, ADWR and ADEQ compliance and proper permitting
Responsible for cash flow management of all construction projects
Put together budgets used in Performa’s for future land projects
Ashton Woods Homes – Scottsdale, AZ November 2005- August 2006
Land Development Director
Responsible for all seven current and all future Ashton Woods Communities throughout the Phoenix Metro area
Managed the delivery of finished lots in several master planned communities including: DC Ranch, Verrado, Vistancia, Estrella Mountain Ranch, Morrison Ranch, and Marley Park
Coordinated between Master Developer and Ashton Woods Vertical personnel for proper completion and delivery of lots and finished homes
Solicited bids and awarded contracts for paving, concrete, and irrigation repairs and installations for all builder parcels
Monitored all communities for Dust Control and ADEQ compliance and proper permitting
Put together budgets used in Performa’s for all future land transactions that Ashton Woods was looking to purchase
CMX – Phoenix, AZ June2003 – November 2005
Assistant Project Manager
Member of the Civil Group conducted and wrote feasibility, due diligence, drainage, sewer, and water reports. Evergreen feasibility projects included 27th Avenue and Carefree Highway in Phoenix and 107th Avenue and Broadway Road in Avondale
Helped manage two master planned communities for Pulte Homes and Lennar in North Phoenix, supervising the production of all construction documents and necessary engineering reports associated with final plats including submittal for City Review and approval for the entire second phase of Stetson Valley Community
Worked for a year on Prasada for Fulton Homes and Westcor in Surprise Arizona producing the rezoning and minor plan amendment documents associated with the residential and commercial portions of the property
Responsible for taking residential and commercial projects from the conceptual planning phase through final design and agency approval
Stantec Consulting, Inc. – Phoenix, AZ September 2001 – June 2003
Project Engineer
Member of the Commercial and Drainage groups, responsible for design, coordination, and writing all engineering reports that are associated with the development of residential and commercial projects (including Glenhurst 130 acres, Madrid 57 acres, TASH 67 acres, and Various Safeway Commercial Corners)
Took projects from preliminary design and report phase to final approval on drainage plans, water plans, sewer plans and associated reports
Conducted feasibility and due diligence reports on various parcels of land for commercial and residential development
Kimley-Horn & Associates, Inc. – Phoenix, AZ August 1999- September 2001
Analyst
Design of master plan communities and Big Box retail centers (projects included Laveen Meadows 90 acres, Maracay at Pecos 25 acres, Golf Club at Scottsdale 110 acres, Arrowhead Industrial Park 45 acres, Glendale Northwest Wal-Mart)
Took projects from conceptual phase all the way through drainage design, grading, earth balance, sewer design, and final reports on drainage
LJA Engineering and Surveying – Houston, TX August 1998 - August 1999
Graduate Engineer
Design of master plan communities and major public works facilities (Woodlands Master Plan, Sienna Plantation Master Plan)
Took projects from conceptual phase all the way to final plans, bid packages, and contract documentation
Spent 8-10 hours a day on Micro-Station designing, levees, ditches, and subdivision sections
Responsible for reviewing preliminary plans and bid documents
Coordinated between a team of ten CAD operators and other design professionals to ensure that adjacent projects tied together properly
EDUCATION
Masters of Civil Engineering University of Houston - August 1999
Bachelor of Science in Civil Engineering Texas A&M University - August 1997