Construction Project Manager/Engineer

Location:
荒川区, Canada
Salary:
negotiable
Posted:
October 25, 2010

Contact this candidate

Resume:

RESUME OF

ROBERT BALASBAS

Professional Qualification:

CSWIP 3.1 (Level II) Welding Inspector, Certificate No.22560

CSWIP 3.2 (Level III) Sr. Welding Inspector, Certificate No.42127

PCN RT Film Interpreter Level II Cert.No.GO09S3622720, PCN No.305981

SNT-TC-1A – LPT Level II Cert. No.QNIT/ASNT/27-PT

SNT-TC-1A - MPT Level II Cert. No.QNIT/ASNT/43-MT

Saudi Aramco Certified Inspector, SAP No.70003078

Phased Array UT Images Analyst, Cert.No.OIAG/VI/2010-026

Bachelor of Science in Mechanical Engineering

Objectives:

To pursue operational excellence through implementation of integrated quality systems those focus on preventing problems and assure the reliability, efficiency and extended life of facilities

Summary of Work Experienced:

More than eighteen (18) years professional work experienced in the field of Quality Control Management and Engineering, Maintenance and Construction works for Oil & Gas and Power Industries. Familiar with the different phases of the Project such as design /drawing review Procurement, Construction. Jobs included Fabrication, Installation, Examination & Testing and Commissioning of Mechanical works and Equipment for Mechanical Projects. Familiar with the National and International Codes and Standard such as: ASME I,II,V,VIII,ASME IX,ASME B31.1,31.3, AWS D1.1, API 1104, API650,API 620,ASTM,BS PD5500, Saudi Aramco ‘s Standards (SAES, SAMSS, SAEP, SATIP, SAIC), SHELL DEP, Exxon Mobil GP and others.

COMPANY: Mitsui Engineering & Shipbuilding Co. Ltd.

Position Held: Sr. Welding & Piping Inspector/RT Film Interpreter

Phase Array UT Analyst by using Tomoview

Inclusive Date: March 14, 2010 up to present

Project: Singapore Parallel Train Oleffin Furnaces Project

Exxon Mobil Chemical Plant Pte Ltd.

Jurong Island, Singapore

COMPANY: CB&I Lummus-Toyo Engineering Corporation Joint Venture

Position Held: Piping (Boiler & Process) & Tank Welding Inspector

RT Film Interpreter

Inclusive Date: January 13, 2008 – Feb.28, 2010

Project: SHELL HOUDINI Ethylene Cracking Complex Project

Shell Eastern Petroleum (Pte.Ltd.)

Pulao Ular, Pulao Bukom , P.O. Box.1908

SINGAPORE 903808

COMPANY: CHIYODA TECHNIP JOINT VENTURE (CTJV)

Position Held: Piping,Tank & Welding Inspector/RT Film Interpreter

Inclusive Date: January 31, 2007 –November 29, 2007

Project: QG 3&4 Project Qatar Gas Liquefied On-shore Project

(Qatar Gas, Conoco Philips & Shell) QCS Project,

Ras Laffan Industrial Park,Qatar

COMPANY: SAUDI ARABIAN OIL COMPANY

Kingdom of Saudi Arabia

Position Held: Q.C. Mechanical/Piping/Welding Inspector

Q.C. Vendor Inspector /QC Engineer

Inclusive Date: February 2002 up to December 25, 2006

Project Involvement:

KHURSANIYAH PRODUCING FACILITIES

BI No. 08014 - Saudi Aramco

Khursaniyah (Saudi Aramco)

WR Two Grades of Gasoline and Additional Capacity Requirement for Seven Bulk Plant (Fabrication QC- Welding Inspector )

Contract No. 660*******/660*******

BI : 03548/00069- SAUDI ARAMCO

Tabuk Bulk Plant, Duba Bulk Plant, Turaif Bulk Plant, Al-Jouf Bulk Plant,Abha Bulk Plant, Najaran Bulk Plant, Jizan Bulk Plant

Fire and Safety Upgrade & Oily Water System

Contract No.660*******; BI/JO: 10-03758

Najran, Bulk Plant (Saudi Aramco); Najran, K.S.A.

Integration of New Power and Steam Generation Facility

Contract No.660*******; BI-3540

Riyadh Refinery (Saudi Aramco); Riyadh, K.S.A

T&I Works for HIJ Area for September 2003 Shutdown

Requisition No. 300*******

Riyadh Refinery (Saudi Aramco); Riyadh, K.S.A

South Refining Plants T&I Planning

( April 2004 Shutdown)

Contract No. 660*******; Service Order No. 651*******

Rastanura Refinery (Saudi Aramco); Rastanura, K.S.A.

COMPANY: RIOFIL CORPORATION/KAWASAKI STEEL CORP.(Philippines)

Position Held: QC Engineer/Piping/Welding Inspector

Inclusive Date: March 1998 to December 2001

Project: San Lorenzo 500 MW Combined Cycle Gas Turbine (CCGT)

BSII – Steel Making Plant & Bar Mill Plant

BIPC – Industrial Port (Marine Works)

COMPANY: ATLANTIC GULF AND PACIFIC Co. of Manila-Philippines

Position Held: Q.C. Piping Inspector

Inclusive Date: November 1994 to March 1998

Project Involved:

Name of Project: Osaka Power Station

Main Contractor: Babcock-Hitachi (Philippines) Inc.

Destination: Osaka, Japan

Name of Project: HBI-DRI GAS GENERATION PLANT

Main Contractor: Broken Hills Proprietary (BHP Australia)

Destination: Port Headland, Australia

Name of Project: SEAVAM HOECST &ACETYLS

Main Contractor: Flour Daniel Pacific Inc.

Destination: Singapore

Name of Project: GHRUBAH POWER & DESALINATION PLANT

Main Contractor: HITACHI ZOSEN CORPORATION

Destination: Sultanate of Oman

COMPANY: TAIHE ALLTECH CONTRACTOR Inc.-Philippines

Position Held: Millwright/Pipe fitter

Inclusive Date: March 1992 to March 1994

Name of Project: 300 MW Coal Fired Thermal Power Plant

Main Contractor: Marubeni Corporation

Location: San Rafael, Calaca, Batangas, Philippines

DETAILED WORK EXPERIENCE:

Welding, Piping, Tank Inspector and RT Film Interpreter

 Witnessed on behalf of EPCM Contractor all weld procedure qualification test, including laboratory conducted mechanical and destructive test.

 Witnessed on behalf of EPCM Contractor Welder Performance Testing.

 Monitored on a daily basis that welding is being correctly applied to specific job tasks and that it is being carried out in accordance with the relevant WPS.

 Monitored of various welding process like GTAW, FCAW, SAW, EGW and SMAW for different type of material such as 9%Ni (A553Type II), Al, Cu-Ni, Cr-Mo (P11, P22,P5, P91),16 Mo3,C & SS( Duplex & Austhenetic ) and others.

 Monitored those welding consumables handling is following the relevant WPS and Manufacturer’s recommendations, such as in storage, issuing control, pre baking etc.

 Day to day monitoring of welding activities in general, especially in areas where safety is of paramount importance.

 Reviewed weld tracking (Weld History Sheet) on a daily basis ensure entries are correct.

 Ensured where applicable that post heating and post weld heat treatments are being executed in accordance with approved procedures.

 Checking the Punch listing items as per P & ID and Isometric such as Pipe supports, Valves, Guides, Shoe supports and NDT Completion and approving releasing packages for Hydro test

 Witnessed, reviewed of documents and approved all Pneumatic and Hydrostatic testing on behalf of EPCM Contractor.

 Reviewed the Radiographic Films on behalf of EPCM Contractor according to

 Analysis of Phase Array UT Images using Tomoview.

 Conducted random Positive Material Identification counter check.

WELDING QC COORDINATOR

 Direct reporting to Field QC Manager and Assistant QC manager

 Attend QC Coordination meeting with Sub-Contractors & Clients.

 Interfaced with Field QC Manager, Assistant QC Manager, Welding Inspectors, Construction Supervisors, QA/QC Client Personnel, Certifying Authority, Implementation Contractor Personnel, Engineering Personnel, NDT Operators (Third Party).

 Provide assistance to the production personnel to overcome technical welding and fabrication problems.

 Reviewed and comment on Sub-Contractor technical documents.

 Reviewed of final Construction Dossier (MDB) prior to Client submittal and hand over.

PERSONAL INFORMATION:

Date of Birth: July 27, 1971 (39 Years old)

Nationality Filipino

Civil Status Married

Singapore Permanent Resident with PR No. S7168660D

EDUCATIONAL ATTAINMENT/ TRAINING AND SEMINAR ATTENDED:

FEATI UNIVERSITY Bachelor of Science in Mechanical Engineering

Sta. Cruz, Manila, Philippines

March 1992

TWI Certification Ltd. Classification Scheme for Welding Inspection Personnel 3.1 Level II

Granta Park Great Abington,Cambridge CB21 U.K.

September 2005

Classification Scheme for Welding Inspection Personnel 3.2 Level III

Granta Park Great Abington,Cambridge CB21 U.K.

September 2009

British Institute of NDT PCN Radiographic Interpretation of Welds, Level II (GEN 3.4)

1 Spencer Parade,Northampton, NN1 5AA, U.K.

June 2009

Q-NET Institute of NDT ASNT for Magnetic Particle Testing-NDT Level II

ASNT for Liquid Penetrant Testing-NDT Level II

238,Bukit Batok East Ave.5,Singapore,650238

May 2008

OCEANEERING International A.G.

(Singapore Branch) Application & Analysis of PHASE ARRAY IMAGES using Tomoview

OCEANEERING INSPECTION OFFICE

14 Soon Lee Road, Jurong 628077, Singapore

March 2010

SAUDI ARAMCO

LP Worked Permit Receiver Course

Riyadh Area Loss Prevention Division, Saudi Aramco

Saudi Aramco Vendor Inspector Examination

Vendor Inspection Division, Saudi Aramco, Flour Arabia Building Al-Khobar K.S.A.

NTUC Learning Hub

(Ministry of Manpower Accredited Training Provider- SINGAPORE)

Safety Instruction Course for Supervisor (Manhole)-March 3, 2008

Safety Orientation Course for Workers (Oil/ Petrochemical)-May 23, 2009

SAUDI ARAMCO INSPECTOR QUALIFICATION:

Site & Vendor Inspector – Approved by NAPIS,WRPIU and Remote Area Projects Inspection Units- SAP #70003078

 QM 03 Mechanical – Gen.(01-04,13,31,32)

 QM 07 Valves (04)

 QM 08 Fittings (03)

 QM 09 Gaskets (06)

 QM 15 Structural Steels (12)

 Welding Inspector

 Mechanical & Piping Inspector

 QC Engineer



Contact this candidate