ISLAM AHMED SALAH AL-DIEN
PERSONAL DETAILS
Date of Birth Nov 5th 1984
Nationality Egyptian City Al-Khobar - Dammam
Gender Male Country Saudi Arabia
Mail t1myeq@r.postjobfree.com Mobile +966-***-**-****
OBJECTIVES
Having position that will meet my work experience, education, training and acquired skills in electrical protection power system engineering in order to attain further knowledge and relations for improving my experience and personal skills and career.
Finally, Adding value to myself and to the organization
BUSINESS CONTACT ADDRESS
Company Alstom Grid (COGELEX - AREVA).
Position SAS design engineer
Department SAS department
City Riyadh & Al-Khobar - Dammam
Country Kingdom of Saudi Arabia (KSA)
PROFESSIONAL EXPERIENCE
From
To
Position
Dept Apr 12
Present
CCS design engineer (Panel automation engineer) /
SAS department. Organization
City
Country Alstom Grid (COGELEX - AREVA).
Riyadh / Al-Khobar - Dammam.
Kingdom of Saudi Arabia (KSA)
Responsibilities
• Engineering/Technical review of the project scope
• Preparation of the projects base design (Substation main one line diagram, Protection logic diagram, interlock logic diagram).
• Preparation of the relays CT & VT calculation requirements.
• Analysis of the Risk / Deviation as per project specification
• Preparation/Review of the Panel List / Relay List AC/DC Load
• Preparation/Review of the BOQ
• Base Design Preparation / Review of Base Design
• Detail Design Preparation / Review of the Detail Design for the Control and Protection Panels
• Ordering of the material for the project scope
• Coordination with Customer, Consultant and Contractor/sub-contractor for the timely approval of the drawing / documents
• Attending the meeting with Customer, consultant and contractor for the technical clarification
• Coordination with Panel Manufacturer / factory.
• Coordination with Testing and Commissioning Team
• Coordination with Procurement & Project Management Team
• Following up the project schedule
• Optimizing the project cost by analyzing the customer requirement appropriately
• Executing the project in order to meet customer expectation.
• Preparation of the relay setting calculation.
• Supporting secondary application design team in the preparation of (Single line diagram, Protection logic, Interlocking diagrams, CT/VT calculation, panels interfacing, short circuit / relay setting calculations, SAS signal list, fault recorder point list & SCADA point list, etc.
From
To
Position
Dept Oct 08
Mar12
Substation Protection design engineer (380/110/33/13.8KV).
Protection department Organization
City
Country DAR-Engineering (Al-Fanar Co.)
Jeddah
Kingdom of Saudi Arabia (KSA)
Responsibilities
• Study the scope of work & project specification requirement.
• Preparation of the projects base design (Substation main one line diagram, Protection logic diagram, interlock logic diagram).
• Preparation of the relays CT & VT calculation requirements.
• AC/DC auxiliary system design calculation (AC/DC circuit breaker sizing calculation, LV AC/ DC cable sizing calculation).
• Preparation of B.O.Q of the substation control & instrumentation cables.
• Thorough examination/panel review of the vendor’s control & protection panels detail design and work necessary modifications for the panels.
• Review the technical offers as per IEC, ANSI & SEC standard specifications.
• Control and protection panels design
• Preparation of the panels interfacing and terminations.
• Modify the exciting protection and control schemes for old substations (remote end S/S's) to be matching with the new protection scheme requirement.
• Preparation of all substation required signals for (SER, SCADA, TFR and Annunciation) systems.
• SAS design review.
• Preparation of the relay setting calculation (Distance, Differential, Restricted EF, Back up O/C & EF relays, ect.). (ABB, SIEMENS, SEL, MICOM…) relays.
• Protections relay co-ordination.
• Power system analysis studies (load flow & short circuit).
• ETAP power system analysis and relay settings calculation.
• Aspen short circuit and relay setting co-ordination.
• Microstation v.8
• Site visit survey.
• Client & vendors Co-ordination.
• Attending for design review meeting.
From
To
Position
Dept Sep 07
Oct 08
Electrical power Engineer
Protection dept. Organization
City
Country Electrical Power System Engineer Co.
Cairo
Egypt
Responsibilities
• Electrical Substation Control design.
• Electrical Substation Automation design.
• Protections relay co-ordination.
• Power system analysis studies (load flow, short circuit, electrical losses, and electromagnetic interference studies).
ACHIEVED PROJECTS @ ALSTOM GRID
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
132/13.8KV TIYYAM-2 S/S, 132/13.8KV NUZHA-2 S/S & 132/13.8KV HINDAWAYA S/S.
SEC WOA / ALSTOM Grid.
380/132/13.8KV AD-DAWADMI S/S
SEC COA / SSEM.
KING KHALED MILITRY CITY (KKMC) POWER PLANT EXTENTION ADD ONE GAS TURBINE.
KING KHALED MILITRY CITY (KKMC) / ACC
REPLACEMENT OF ELECTROSTATIC PROTECTIVE RELAYS STSTEM BY FULL NUMERICAL RELAYS FOR TWO GTG UNITS.
MARAFIQ / ALSTOM
132/33KV SABYA NORTH S/S.
SEC SOA / ALSTOM Grid.
380/33KV PP12 S/S
SEC WOA / ALSTOM Grid.
ACHIEVED PROJECTS @ ALFANAR CO.
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Owner/contractor
Project Name
Project Mission
Project Name
Project Mission
Project Name
Project Mission
Project Name
Project Mission
Project Name
Project Mission 380/110/13.8KV MAKKAH NORTH substations & related remote end substations
SEC WOA / Al-Tokhi construction Co.
380/110/33/13.8KV HARAMMEN substations ( six S/S’s)
SEC WOA / AL-FANAR Co.
REINFORCEMENT OF HAIL-3 POWER PLANT
SEC WOA / AL-FANAR Co.
132/13.8KV Saline Water Substation (Three S/S’s) & 33/13.8KV Sealing
Water Substation (Three S/S’s) / AL-DAR ENGINEERING
SWCC / AL- GIHAZ Co.
380/110/13.8KV HIGH VOLTAGE MAKKAH SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-FANAR Co.
132/33/13.8KV SHUQIAQ-2 SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-GIHAZ Co.
132/33/13.8KV AHAD RUFFAIDAH SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-GIHAZ Co.
33/13.8KV HABIL SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-GIHAZ Co.
380/110/13.8KV NEW MAKKAH WEST SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-FANAR Co.
380KV Rabigh-2 Switching Substation / AL-DAR ENGINEERING
SEC WOA / AL-FANAR Co.
Extension for 380/110/13.8KV SOUTH AZIZIAH Substation/ AL-DAR ENGINEERING
SEC WOA / NATEL Ltd Co.
380/110/13.8KV HVE / AL-DAR ENGINEERING
SEC WOA / AL-FANAR Co.
380/110/13.8KV JEDDAH NORTH SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-FANAR Co.
380/110/13.8KV SOUTH AZIZIAH SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-FANAR Co.
380/110/13.8KV NEW MADDINAH EAST SUBSTATION / AL-DAR ENGINEERING
SEC WOA / AL-TOKHY Co.
REINFORCEMENT OF HAIL-2 POWER PLANT
SEC WOA / AL-FANAR Co.
ACHIEVED PROJECTS @ EPS CO.
Project Name
Owner/contractor
Project Name
Owner/contractor
ABO SANNAN (The General Petroleum Company)
General Petroleum Company
KHALDA Petroleum Company
KHALDA Petroleum Company
EDUCATION BACKGROUND
2002 -07 College
Graduation Project
Category
Grade
Contents
Faculty of Engineering ….Helwan University
B.Sc of engineering in "Electrical Machine and Power Eng.Dep."
(The degree of 3rd year is very good)
(The degree of 4th year is very good)
(Over all degree is good)
Shunt Active Power Filter
Power Electronics Application
Excellent 98%
• Limitation for sharp harmonic orders& spikes
• Improving the power factor
• Power analysis for the network
ADDITIONAL CERTIFICATES AND COURSES:
DATE COURSE OFFERED BY
Dec 07 PLC programming 2 (SIEMENS) & SCADA – DCS A.D. Panasonic Centre
Aug 07 The management of human resources and feasibility studies Cairo University
July 07 PLC programming (LG) A.D. Panasonic Centre
July 07 Traditional Control ( Classical control ) A.D. Panasonic Centre
Aug 04 Microcontroller Architecture Programming (AT90S) & Interfacing Cairo university
July 04 Operation & maintenance of
Steam power plant – gas power plant – combined cycle power plant. Cairo South power station
July 03 Electrical machines maintenance Techno pyramids Factory
Aug 03 Faculty of engineering (workshops training) :
Electrical motors, cables, lighting, electronics & control Helwan University
COMPUTER SKILLS / SOFTWARE'S
Very good user for :
• EDSA
• ETAP
• ASPEN
• E3 Series Program
• ABB software (PCM)
• SIEMENS software (DIGSI)
• ATP
• Auto cad
• MATLAB
• Lab view
• Adobe Photoshop
• MS office programs (Word- Excel- PowerPoint…).
• Familiar with Windows 95, 98, 2000, Me, Xp & Vista
• Internet browsing, emailing, web search etc
REFERENCES: Available upon request.