Post Job Free

Resume

Sign in

MEP ENGINEER

Location:
lucknow, UP, 226010, India
Salary:
3000 $ PM
Posted:
June 26, 2011

Contact this candidate

Resume:

MOHAMMAD KASHIF SARKAR

Mobile: +965-******** - Kuwait

Mobile: +91-979******* & 933-***-**** (India)

Email: - sr9ip1@r.postjobfree.com

sr9ip1@r.postjobfree.com

To :

Subject : Application for the post of “MEP Engineer”

Reference No. :

Dear Sir,

I would like to take an opportunity to submit my resume for the post of “MEP Engineer” in your esteemed organization.

Please find enclosed my resume describing all my theoretical and practical capabilities, which would be asset to your firm. My academic qualification and practical experience in various projects and zeal to put in hard work, gives me confidence to shoulder my challenging responsibilities and execute the job to the best of the project requirements.

I trust my qualification and experience will meet your requirement and I look forward for an early reply at your earliest convenience.

Thanking you in anticipation.

Yours truly,

MOHAMMAD KASHIF SARKAR

CAREER OBJECTIVE:

Seeking a challenging career in the quality environment where my technical skills and qualifications as a Mechanical Engineer can be shared and enriched and make a significant contribution to organization with strong work ethics and diligence.

CAREER BRIEF:

Having over 7.8 Years Work Experience in Middle East and in India in Design, Installation, Testing & commissioning of following services.

(A) HVAC (Heating, Ventilating and Air Conditioning):-

Experienced in Central Plant, Package unit and Split Air-conditioning unit installation works, also comprising planning, scheduling, Co-coordinating with main Clients, contractors, Sub-contractors, interacting with consultants, Heat Load Estimation (HAP-Carrier), Equipment selection, Duct Design & Sizing (ASHRAE, BS, SMACNA, DW 144/142/141/171 etc), CHW Pipe Design & Sizing (BS, ASHRAE), ESP Calculation, Pump Head Calculation, Workshop Drawing & Material Submittal preparation, Materials & Fittings take off and Execution of Installation, Testing & Commissioning of Air Handling Unit with Heat Recovery Wheel, Fan Coil Units, Ventilation Fans, Air washers, Air Curtains, Package Unit, Chillers, CHW Pumps, BMS Control and Control Valves etc.

(B) Plumbing (Water Supply, Drainage and Storm water):-

Workshop Drawing and material submittal Preparation, Pump Head calculations, Pump, water Heater and sanitary items selection, loading Unit Calculations & Pipe Sizing, Materials, Fittings and Valves quantity take off and Execution of Installation, Testing and Commissioning of Water supply Pipeline, Drainage Pipe Line, Storm Water Pipeline, Water Tank, Water Heater, Booster Pump, Transfer Pump, Sump Pump and controls etc.

(C) Fire Fighting (Sprinkler System, Hose reel and Clean ):-

Workshop Drawing Preparation, Pump Head calculation, Materials, Fittings & Valves quantity take off, Execution of Installation, Testing & Commissioning of GI Pipeline, Sprinkler, Hose reel, Dry Risers, Wet Risers, Foam System, Halogenated Extinguishing Agent Systems & Fire Pumps (Diesel Pump, Jockey Pump & Electric motor Pump) as per Civil Defense Regulations & standard )

EDUCATIONAL QUALIFICATIONS:

Passed SSC(XII) from U.P.Board of Education, in the year 1999

TECHNICAL QUALIFICATIONS:-

B.TECH. in Mechanical Engineering from Ram Manohar Lohia University UP India, in the 2003.

COMPUTER SKILLS:

MS Office, HAP 3.05 (Carrier), Revit MEP 8.1, AutoCAD 2007 & Primavera

DRIVING LICENSE:-

** Holding a valid Kuwait Driving License.

** Holding a valid Saudi Arab Driving License.

WORK EXPERIENCE:-

Having over 7.8 Years work experience with following companies:-

A. Presently working as a MEP Engineer ( HVAC, Plumbing & Fire fighting) with M/s Samsung SDS Ltd. Kuwait (Since Dec. 2010 to till date)

B. Worked as a Project Engineer ( HVAC, Plumbing & Fire fighting) with M/s Saudi Oger Ltd. Saudi Arab (Since August 2009 to Dec.2010)

C. Worked as a HVAC Project Engineer with M/s Sahara Air-conditioning Co. Kuwait (Since July 2005 to June 2009)

D. Worked as a Project Engineer HVAC (Design & Execution) with M/s Fairair India pvt.ltd. (Since Aug.2003 to June 2005)

JOB PROFILES:

• Assisting the General Manager in the Project Work from the beginning stage till the submission.

• Detailed study of scope of work, Specification, Equipment Schedule and BOQ (Tender) etc.

• Design of Mechanical System in two step(65% Design and 99% Design)

• Design Submission and Preparation of Design and Analysis Report to submit the client.

• Pump Head and ESP calculation for Pump & AHU selection respectively.

• Preparation of Bill of Quantities and floating the enquiries to the venders.

• Mobilization of manpower for execution of the project.

• Preparation of Workshop Drawing and Material submittal for consultant approval.

• Preparation of Daily & Weekly program based on one month look ahead program.

• Preparation of Daily, Weekly and One Month progress report.

• Preparation of the detailed Site quantities requirement based on the consultants approved drawings.

• Preparation of Work Method Statement as per specification and standard norms.

• Supervision of installation of HVAC, Plumbing & Firefighting items as per standard norms.

• Floating Request for Inspection of installations to Consultant and rectifying if any snag works / comments.

• Floating request to consultant for material inspection as per submittals and specification.

• Coordination with all other services like Architectural & Electrical, etc towards successful completion of project.

• Coordinating with Architect / Contractors during the execution of the project.

• Attending the weekly site meeting with consultant and sub contractors.

• Preparation of appropriate documents for handing over the Project (Mechanical Services).

WORK EXPERIENCE IN DETAIL:

(A) During Tendering:-

• Reporting to General Manager - MEP

• Assisting the General Manager in the preparation of the tender from the beginning stage till the submission

• Attending Site Visits.

• Detailed study of the Scope of the Tender, Drawings, Schedule of Equipments, Specifications, Quantity take off and Estimation as per the bill of quantities for tendering purposes.

• Prepare questionnaire to the Consultant / Client in case of discrepancy in the tender documents.

• Preparation of bill of quantities in Excel format for Lump sum projects as per Principles of Measurements (International).

• Pricing of the complete job from the basic details, market and with latest plant, labor & material cost using Excel.

• All post-tender process for winning jobs including value engineering & supplier negotiation.

• Preparing Discrepancies between Tender drawings and Construction drawings, claiming variation to Consultant.

(B) During Execution:-

• Mobilization of manpower for execution of the project.

• Prepare the detailed Site quantities requirement based on the consultants approved drawings.

• Preparation of workshop drawing and submit to consultant for approval.

• Preparation of material submittal for consultant approval.

• Coordinating with the back office staff and / or supplier towards timely delivery of materials on site.

• Supervision of Duct fabrications as per DW142 / SMACNA standards and its installation.

• Supervision of installation of HVAC, Plumbing & Firefighting items as per standard norms.

• Participating in site meetings with client / consultant.

• Floating Request for Inspection of installations to Consultant and rectifying if any snag works / comments.

• Coordination with all other services like Architectural & Electrical, etc towards successful completion of project.

• Actively participating with third party during Testing and commissioning of Mechanical system.

• Preparing appropriate documents for handing over of the Mechanical services.

PROJECTS HANDLED:-

** PUBLIC AUTHORITY OF INDUSTRY (PAI)-KUWAIT

Design, Supply, Installation, Testing & Commissioning of HVAC system for Electrical Control Building, Diesel Generator Room and Header & Valve Chamber of Pumping Station-C with Complete HVAC works comprising C.A/C unit having capacity of 15 Tr.along with Ducting, Insulation, Smoke Detector, Motorized Fire Damper & Building Automation system for all HVAC equipments.

** UPGRADING OF A/C INSTALLATION AT AL-TAMEER BLD. -KUWAIT

KOC CONTRACT NO.-29128

Supply, Installation, Testing & Commissioning of HVAC system comprising 4 Nos.of Air cooled chiller(550 TR) ,4 Nos.pump, 7 Nos AHU,with electrostatic filter,UVC emitter & Ionization generator, pre insulated BS pipe, Exhaust/Ventilation fans and BMS.

** KUWAIT OIL COMPANY –AHMADI KUWAIT

Design, Supply, Installation, Testing & Commissioning of Package unit of capacity of 20 Tr.for the New PMC Office at Al Tameer Annexes, KOC.

** DAELIM INDUSTRIAL CO. LTD-KUWAIT

Worked as a HVAC project engineer with Daelim company on project Replacement of 9 crude filling line comprising Supply & Installation of 2 Nos.Central Split unit Along with required refrigerant piping connection work, ducting,BMS at RMU Substation and Local control room of Burgan area.

** MINISTRY OF INFORMATION (RTV, MAGWA, KABD TV STATION) - KUWAIT

Complete Installation of HVAC system comprising 3 Nos. Air cooled Chiller of capacity 120 Tr. along with allied equipments like Pump, Expansion Tank, Air Separator, AHU’s, Fan Coil Unit ,VAV boxes, Piping Insulation & Cladding at all location with proper planning.

** KOC BEACH HOUSE AT AL-ZOOR KUWAIT

Complete Installation of HVAC System comprising 4 Nos. Air cooled Chiller of capacity 150 Tr, 4 nos. Pumps, Expansion Tank, Air Separators, AHU’s, Fan Coil Unit and VAV boxes along with Valve, Piping, Ducting, Insulation etc.for the KOC Beach House

** PRINCES NOURA BINT ABDUL RAHMAN UNIVERSITY (PNUW) - SAUDI ARAB

Installation of District cooling System comprising 20 Nos.Chiller of capacity 150 Tr, Pumps, Expansion Tank, Air Separators, AHU’s, Fan Coil Unit and VAV boxes along with Valve, Piping, Ducting, Insulation etc.for the College of social science, College of art & design, College of humanities, College of family, College of computer science & College of art & humanities.-PNUW

** INTEGRATED SECURITY SYSTEM FOR ALL KOC FACILITIES (Current project)- KUWAIT

Installation of Package A/c unit, Mini split unit, VAV, Piping, Ducting, Insulation and also comprising the plumbing, Fire fighting works, Elevator, Lift and EOT crane for all KOC facilities-Kuwait

PERSONAL DETAILS:-

Date of Birth : 11th Dec. 1981

Marital Status : Married

Nationality : Indian

Languages : English, Hindi & Urdu.

Permanent Address : Vijay khand 2 Gomti Nagar Lucknow UP, India.

PASSPORT DETAILS:-

Passport No. : H-4510400

Date of Issue : 02/04/2009

Date of Expiry : 01/04/2019

Place of Issue : Lucknow-UP India

DECLARATION:-

I hereby declare that the above-furnished details are true to the best of my knowledge.

Yours truly,

MOHAMMAD KASHIF SARKAR

Date:



Contact this candidate