OBJECTIVE
A responsible position in Industrial Engineering
SUMMARY
More than 16 years of progressive experience in Industrial Engineering/ Manufacturing Engineering.
PROFESSIONAL EXPERIENCE
SURFACE EQUIPMENT – Kilgore, Texas 2010 – 2011
Purchasing Agent
• Developed new suppliers for key commodities improving both cost and delivery
• Worked with multi-functional team to help develop and document the procurement process
• Coordinated with the shop and accounting management to optimize inventory and delivery timing
• Created and maintained a graphic procurement schedule of all projects for the management team
CHICAGO BRIDGE & IRON – Tyler, Texas 2007 – 2009
Project Materials Manager
• Responsible for content and delivery of project materials and modules for major refinery upgrades for high profile clients in the U.S and South Korea.
• Worked closely with in-house shops, outsource vendors, Procurement, Expediting, Engineering and Project Management using a team approach to ensure on-time delivery.
• Projects executed were at the $10 million to $20 million level for customers such as Exxon Mobil, Caltex, and Conoco Phillips.
QC MANUFACTURING – Kilgore, Texas 2006 – 2007
Materials Manager
• Determined materials, screened vendors, and purchased $360,000 worth of steel, valves, and other flow equipment saving at least $54,000 annually.
• Developed sources for steel suppliers, large machining, water jet cutting, and specialty valves.
• Found the primary input source for their rubber recycling machine saving $36,000 per machine per year.
TROXEL MANUFACTURING – Tyler, Texas 2004 – 2005
Quality Manager
• Specified and purchased production gages through outsource machine shops optimizing delivery & cost by collaborating on material cost and design.
• Was invited to participate in Carrier's value engineering team, which opened technical communications between the companies.
• Negotiated design change with a fan motor vendor to resolve major assembly failures.
MADIX, INC. – Terrell, Texas 2001 – 2004
Manufacturing Engineer
• Responsible for handling corrective action requests from the shop floor.
• Developed a successful team atmosphere between shop and Engineering for problem solving.
• Initiated cost savings projects saving over $50,000 through setup reduction and material handling improvement.
HAWORTH – FIRST SOURCE FURNITURE – Henderson, Texas 1998 – 2001
Manufacturing Engineer
• Specified and purchased material handling equipment
• Designed material handling stations for Kanban project resulting in improved part protection and quicker assembly.
PERRY EQUIPMENT – Mineral Wells, Texas 1989 – 1998
Estimating Supervisor
• Responsible for ASME vessel estimating. This included determining materials to meet customer specs, and coordinating outsourcing as needed.
• Selected and justified capital equipment saving $300,000 annually.
• Initiated purchase of laser-cut blanks to enable cellular processing of orifice plates.
EDUCATION
Bachelors Degree in Industrial Engineering – Texas A&M University
ISO Internal Auditor Certification
Setup Reduction