Materials Science Engineer with 20 years of experience in Iron & Steel Industries including:
Steel Making Through Blast Furnace And Convertor Route;
Steel Making Through Direct Reduction And Electric Arc Furnace Route;
Hot Strip Mill;
Ferromanganese Production Plant;
Refractories;
Able to perceive and grasp issues and problems combined with the ability to make contributions and to create and implement solutions.
Ability to weigh facts and considerations and render sound decisions regarding on-site problems with minimal impact to the agenda or cost.
Experienced in working with all levels of management to attain assigned goals and objectives.
Adept at building strong productive teams designed to accomplish required agendas.
Proficient at creating effective relationships. Able to promote cooperation and communication between several professional entities.
A high level of enthusiasm and creativity combined with integrity and an “old fashioned” work ethic.
Ability to grasp new concepts and to assume responsibilities as required or needed.
Consistent professional attitude and approach to all management functions.
Collaborated with international companies, e.g.: Gipromez of Russia, Dr. C-OTTO and SGL of Germany, Danieli of Italy, Mecon of India, CMEC of China, Posco e&c of South Korea, SMS-Demag-Tippins of Germany, ASI of Italy, CHMC & CISDI of China, CERI, MCC & SINO Steel of China, Met Prom of Russia.
SUMMARY OF PROFESSIONAL RESPONSIBILITIES
Metallurgical Engineering Activities Including:
Feasibility studies of metallurgical plants
Basic Plant design and equipment
Detailed design of refractories
Bid evaluation
Vendor drawings calculation and design review and recommendation
Coordinating with vendors in regards to technical issues
Request for purchase Order
Coordinate Constructability and Maintainability issues for various metallurgical equipment
Review and evaluate change orders
Update cost matrix
Follow up on delivery schedule versus construction schedule
Equipment and material data verification
Update “as built” condition at site
Technical and pre-shipment inspection of refractories
Site engineering supervision
Engineering and Project Manager Activities Including:
Consultation For Implementation of Metallurgical Plants
Invitation to International Tenders and Concluding Contract
Creating WBS and Planning of the project
Basic And Detail Design Approval
Leading Projects Detailed Designs Including Refractories
Attending in Coordination Meetings With Vendors, Contractors, Client and Different Project Disciplines
Project Scope –Time - Cost and Quality Management
Environmental and Feasibility Studies of Metallurgical Plants
Equipment Clearance And Shipment Tracking
PROFESSIONAL EXPERIENCE
Foolad Technic International Engineering Co. (FIECo.) 1992 to May 2012
PROJECTS:
Esfahan Steel Plant, Esfahan, Iran (2011-2012) Revamping of No. 2 Blast Furnace/Installation of Bell less Top Charging System for 1,400,000 Ton per Year Blast Furnace
Zarand Steel Plant, Zarand City, Kerman, Iran (2008-2012) 1,500,000 Ton per Year Steel Billet/ Blast Furnace, Convertor Steel Making Shop and Continuous Casting Machine and all required auxiliary systems
Mobarakeh Steel Plant, Esfahan, Iran (2009-2010) 2,600,000 Ton per Year Hot Strip Mill/ Electric Arc Furnace, Ladle Furnace and Vacuum Oxygen Degassing + Thin Slab Continuous Casting Machine and Hot Strip Mill stands
Zarand Coke Oven Plant, Zarand, Kerman, Iran (2008-2009) 800,000 Ton per Year metallurgical coke/ Horizontal Coke oven batteries
Azna Steel Plant, Azna City, Iran (2005-2012) 1,200,000 Ton per Year/ Hot Strip Mill, Two Stands Steckel Mill
Esfahan Steel Plant, Esfahan, Iran (2004) Coke Oven Plant/ 900,000 Ton per
Esfahan Steel Plant, Esfahan, Iran; Tavazon Expansion Project (1999-2009) No. 3 Blast Furnace /1,400,000 Ton per Year Blast Furnace and all accessories
Navid Manganese Co., Esfahan, Iran (1998-2000) Revamping of 18,000 Ton per Year Ferro- Manganese Production Plant
Hamedan Blast Furnace, Hamedan, Iran (1998-2000) 70,000 Ton per Year/ Mini Blast Furnace and all accessories
Esfahan Steel Plant, Esfahan, Iran; Saba Expansion Project (1996-2000) 700,000 Ton per Year Hot Strip Mini Mill/ Electric Arc Furnace, Vacuum Oxygen Degassing, Thin Slab Caster, 6 stand finishing mill
Meybod Steel Plant, Meybod City, Yazd, Iran (1994-1998) 300,000 Ton per Year Mini Blast Furnace and all accessories
EDUCATION
Bachelor of Science in Materials Science, Sharif University of Technology, Tehran, Iran, September 1989
COURSES ATTENDED
Welding Technology
Alloy Steels Production
Management Principles
Project Management Body Of Knowledge (PMBOK)
The Guidelines To Manage EPC Projects And Contracts
Claim Management
Letter Of Credit
Principles of Execution of The EPC Projects
Health, Safety And Environment Protection
Internal Audit Of Integrated Management System
Commercial Correspondences
Discussions Skills
COMPUTER KNOWLEDGE
Microsoft Windows XP, Windows 7 and Office
Autodesk AutoCAD
MAJOR LANGUAGES SPOKEN
Excellent verbal and written communication in Persian (Parsi/Farsi) and English
SEMINAR PRESENTATION
Participated in various National and International Seminars
REFRENCES:
References available upon request.