Post Job Free
Sign in

Electrical Estimator J Braukus

Location:
Orwigsburg, PA, 17961
Salary:
75000-85000 PY
Posted:
May 19, 2009

Contact this candidate

Resume:

JOSEPH G . BRAUKUS

ELECTRICAL DISTRIBUTION DESIGNER / ESTIMATOR

PROFILE :

I have over 20 years experience as a high voltage Lineman working with voltages from 4 Kv to 34 Kv. I also supervised field crews on various line and Substation projects.

I have over 5 years experience in Electrical Distribution Design. I have designed Overhead and Underground systems ranging from 4 Kv to 115 Kv. I am well versed with NEC, NESC and OSHA practices and regulations. I can read and understand electrical

diagrams, drawings and prints. I am proficient in the use of Construction Standards used

by various Utility's.

I have over 6 years experience as an Electrical Estimator. Estimating and managing projects in the Industrial, Commercial, Utility and Public Works Projects. I have experience in working with Customers on Design / Build projects. I have experience with Estimation software such as Estimation, Accubid and using spreadsheets and job histories. I have experience with other office software such as Word, Excel, PowerPoint, Outlooks and such. I have used CAD and Micro station design software as well.

I am very personable and I work well with my co-workers and clients. I have the ability to meet with new and existing clients and to be able to establish a close working relationship with them. I also have experience working with vendors to be able to obtain the lowest price on materials and equipment in order to win contracts. And then be able to get better prices on the buy-out.

PROFESSIONAL EXPERIENCE :

Employer : Patrick ESI Wayne Pa. May 2007-February 2009

Project : PECO SUMMER CRITICAL PROJECT

Objective : To up grade existing Overhead and Underground 4 KV Distribution Systems

to 34 Kv due to customer growth.

Duties : Review PECO Engineered scope of work provided by text and one line

diagram of the area to be up-graded. Field engineer the job and determine

how many poles would need to be installed or replaced, Wire size needed

for up-grade, transformer and fuse co-ordinations. Confirm correct clearances

of other utilities on the pole or structure. Draw new one-line diagram for

PECO approval. Upon approval from PECO , I would design the job using

PECO’s design and project management software (Passport), co-ordinate

any outage required to complete the job and apply for any permits needed

such as Right of Way on Public or Private properties. Submit a construction

design to be used during construction and final approval of the Utility. Upon

completion of the project, submit to the mapping department of the utility all

as built drawings needed to upgrade the existing drawings.

PAGE 2

Project : 115 Kv Dual Feed Substation Northeast Utilities

Objective : Estimate new Dual feed Substation for new Bag House at Merrimac

Generating Station

Duties : Using specifications supplied by Northeast Utilities, my responsibilities

included contacting vendors to obtain prices on the Substation Incoming

structure, Circuit Breakers, Transformers, Control and Relay Room and

all related materials for the project. I also estimated the man hours needed

to install the equipment. All estimating was done using an Excel spreadsheet

and job history from a related project. The estimated job cost 3.5 Million

Dollars.

Employer : Westside / Hammer Electric ( Local 743 IBEW) Allentown Pa. March 2000-

June 2006

Project : Business Complex

Objective : Estimate new Professional Building

Duties : Estimate new professional office complex by doing take off on all electrical

systems including Service equipment, conduit and lighting, receptacles and

lighting controls as well as fire and security systems. All estimation was

done by using spreadsheet and job history. I was also responsible in laying

out the construction method to be used. The estimated job cost 600,000

Dollars

Employer : Plateau Electric Raleigh NC Oct 1999-March 2000

Project : New Pier Construction

Objective : Project Manage new pier prototype for US Navy at Virginia Beach Navel

Yard Va.

Duties : Project manage the installation of electrical components of a prototype pier

for the Dept. of the Navy. I was responsible for coordinating the equipment

manufacturing and deliveries which included sled mounted Substations,

fiberglass conduit, all portable cables used in powering ships after docking.

I was responsible for the tracking of monies used in the purchase of said

materials and labor costs. I was responsible for all change order requests.

The estimating of all extra work cost using Accubid software and Primavera

project managing software. I was responsible for coordinating any and all

electrical outages needed in connecting to the existing electrical system on

Base.

PAGE 3

Employer : B.J. Baldwin Electric Narvon Pa. August 1986- October 1999

Project : Carmuse LLC (Design Build Project)

Objective : Complete plant Automation installation and Electrical upgrade

Duties : Using drawings and sketches provided by the equipment supplier

I designed all of the electrical requirements needed to install a

complete automated material handling system which included

extraction of raw material from the on site quarry thru separation,

processing and storage of the product to transportation. The project

included the installation of a new 69Kv to 13.2 Kv Substation addition,

complete re-construction of the Overhead electrical system, Numerous

Pad-mounted transformers, Electrical Control rooms, and the Master

Control Room. The project also included a new lime palletizing plant.

I was responsible managing all material buy outs and labor management.

All estimation was done on site using a spreadsheet method . All design

was done using ink & pen and my knowledge of conduit fill and NEC

standards. Total Electrical cost : 5.5 Million Dollars

Project : Perrier Inc.

Objective : New plant addition and process equipment installation

Duties : Using Estimation software and plans supplied by Perrier. I was able to

do all take offs of equipment and labor to win this project. I was also

responsible for the project management for the construction of the

electrical system in the addition which included new switchgear and

controls. The swift installation of the electrical portion of the project

satisfied the client to the extent of their awarding BJ Baldwin with

additional work and to becoming the COC of the corporation in the area.

Total Electrical cost : Approx 1.5 Million Dollars

Project : Allentown Cement

Objective : Coal stacking Conveyor System

Duties : Using Estimation Software and drawings supplied by the client. I was

able to win this project for BJ Baldwin. I was also responsible for the

purchase of materials and all labor management which included the job

lay-out. I was also responsible for the complete cost management. The

management of the plant were very pleased with the timely completion

of the project as well as the professional work done by BJ Baldwin that

Baldwin was awarded COC status. Total Electrical Cost 250,000 Dollars

PAGE 4

Project : Craftex Mills

Objective : Installation of air conditioning System

Duties : Acted as GC for entire project which included sub contracting concrete

work, Steel building construction, Equipment installations as well as a

new High Voltage service which included a new pad mount Transformer,

secondary cable installation for a new 1200 Amp service, switch gear and

Motor Control Center, 600 amp Buss duct. My responsibilities included all

equipment and material purchases, Labor and cost management. I was

also responsible with coordinating all outages needed to complete the

electrical up-grade. Total Electrical cost Approx 1.5 Million Dollars

Project : Alcoa Aluminum

Objective : Multiple plant projects

Duties : My responsibilities included close interaction with plant Engineering Dept

which included many design build projects from Transformer replacements,

Press Installations and upgrades, Plant lighting, New equipment services,

and building additions. These projects allowed B.J Baldwin to obtain COC

status and day to day work for many years.

EDUCATION :

Nativity BVM H.S. Graduated 1970

U.S. Air Force Tech School Electrical Outside Plant Completed 1971

U.S. Air Force Management School Completed 1984

IBEW Apprentice Program Completed 1978

Penn State Adult Education Program : Project Management 1994

PAGE 5

PROFESSIONAL REFERENCES :

Dave Emigh

Large Projects Manager

Patrick ESI

267-***-****

Dave McCann

Sr. Project Manager

Patrick ESI

610-***-****

Rick Lettich

Sr. VP

Miller Brothers Constructors

570-***-****

Jim Artz

President

Artz & Swaggert Constructors

570-***-****

Dave Paskowski

ABA

Local 743 IBEW

610-***-****



Contact this candidate