Post Job Free

Resume

Sign in

Quality Control Plant Manager

Location:
Taylorsville, NC, 28681
Salary:
50,000
Posted:
August 31, 2011

Contact this candidate

Resume:

Objective

Experience

*/** ** *******

*/** ** */**

*/** ** **/**

*/** ** */**

**/** ** */**

*/** ** **/**

Stephen L. Brown

** ******* ***** ****

Taylorsville, NC 28681

Home: 828-***-**** Cell: 828-***-****

E-mail: rubqnz@r.postjobfree.com

To gain employment in a challenging environment that will utilize, test and enhance my skills.

Carpenter Company Taylorsville, NC Supervisor/Electrician

I am responsible for the supervision of 1st shift production which includes

24 employees. I also handle all electrical issues in the facility.

Self Employed: Running an electrical contracting business doing Residential, Industrial and Commercial jobs. Due to economy I had to find full time employment.

Shook Building Supply Hickory, NC Maintenance/Electrician

My responsibilities include all Building and machine

maintenance, Electrical and machine installations for Shook Building Supply Facilities and the Hickory Truss plants located in Hickory and Mooresville. I worked part time during 2005 to get contracting business started.

GKN Sinter Metals Conover, NC

Facility Coordinator/ Environmental Management Rep

While performing all prior assignments, I have assumed the

responsibilities of Facility Coordinator and Environmental Management Representative. I was responsible for keeping track of all assets, scheduling of contractors, equipment relocation, and implementing ISO 14001 into the facility. I also had the responsibility of implementing a TPM program and Preventive Maintenance program through the PMC 2000 software.

GKN Sinter Metals Conover, NC

Plant Electrician/Maintenance Supervisor

My responsibilities included taking care of all electrical problems in the building. I can read blue prints, do control wiring, install new equipment and update old wiring. GKN purchased 11 Allen Bradley SLC 501's and I wrote the programs for each one. I have written programs for 2 Allen Bradley Micrologic 1000's and a program for a Direct Soft 250. I also installed a DVT vision system for the purpose of inspecting finished products for defects before shipment. I also supervised maintenance personal on all three shifts. I was responsible for scheduling maintenance and preventive maintenance tasks.

Connelly Springs Electric Connelly Springs, NC

Electrician

Did all aspects of Industrial, Commercial and Residential wiring. Worked with 110 volts to 600 volts (single and 3 phases), wired all types of machinery, motors and control panels.

11/96 to 3/99 AMP, Inc. Greensboro, NC

Supervisor

I went to AMP to help increase production and to improve quality control. I was put in charge of installing a 10 die Neihoff rod break down machine. I was given a 1.3 million dollar budget for the purchase and installation of the equipment and an 8 month time frame to be in full production. The equipment was installed under budget and a month early. We then installed a Neihoff 2 wire high speed intermediate drawing machine, a Neihoff single wire high speed drawing machine and a Neihoff high speed fine wire drawing machine. I also helped to implement new SPC charting and new training procedures to improve the quality.

12/79 to 11/96 Piedmont Wire Connelly Springs, NC

Machine Operator/ Supervisor

Self taught in all aspects of copper wire drawing and fabricating. I learned to run Cook and Watson (single and double twist) bunching machines, Vaughn rod drawing machine, Henrich, Syncro and Watson single wire drawing machines. I learned how to fix mechanical and electrical problems. I was promoted to a supervisory position after two years of service. I was then responsible for production requirements, quality control and did most of the electrical maintenance. Piedmont Wire was sold in December 1984 and became Southerland Wire.

Southerland Wire Connelly Springs, NC

Supervisor/ Plant Manager

Helped to start a new wire drawing and fabricating business. I was responsible

for the installation and start-up of the new equipment. When the equipment

was in place, I hired and trained all employees. After the employees were

trained, production began and I was responsible for all the day to day

operations, including stock, production requirements, quality control, shipping and receiving, and maintenance. We expanded the company to three shifts with 50 employees and monthly shipments of over 200,000 pounds of finished product. Southerland Wire was relocated to Hickory and renamed Hickory Wire, Inc.

Hickory Wire, Inc. Hickory, NC

Plant Manager

I was responsible for all plant operations with three shift supervisors,

One shipping supervisor and 75 employees. I wrote the entire machine operating manual, quality control procedures, and manuals for each stage of the operation. I was responsible for moving the business from a 12,000 square foot facility to a 62,000 square foot facility. During the move we were able to keep up with all production requirements while adding new equipment to double production.

References:

Steven Brown Brown Construction Owner

Phone Number: 828-***-****

Reference Type: Professional

Debbie Messer Three Forks Baptist Church Secretary

Phone Number: 828-***-****

Reference Type: Personal

Darren Webb Snyder Mills Waste Water Technician

Phone Number: 828-***-****

Reference Type: Personal

Dean Eggers Alex. Co. Parole officer Enforcement officer

Phone Number: 828-***-****

Reference Type: Personal



Contact this candidate