Resume: Maria Soledad Dorr - Architect - 786-***-****
I am an architect with commercial background and until December 2008, I was working as Store Design and Project Coordination -International Projects all Americas Canada, North/Central/South America, Mexico and Caribbean -Estee Lauder co TR for some Luxury brands [Donna Karan, Tommy Hilfiger, Estee Lauder, Clinique, Bobbi Brown, Origins, MAC, etc].
Experienced in different types and projects sizes the design management work involves from start to completion: space planning, all the design development processes and plan construction stores [Branding], Interiors and fixtures, visual merchandising, signages, pelmets, etc, project coordination in/out of the country, Capital Projects budgets, bids, Awards, manages vendors and contractors, construction processes, scheduling planning (Microsoft Project Mngt) Capital Project-finance control and expenses, leading cross-functional teams on key projects, until the project is finished.
The project process task also includes, store fixtures and visual merchandising elements condition reports and maintenance targeting brand's and customers goals in the point of sales..
All the work development starts schematic layouts concepts and design for Stores/ Building/ Facilities construction maintenance.
The work is documented in Autocad 2D Construction plans packages for Bids, documents, shop drawing approvals for Buildings/Facilities projects and Autocad 3D modeling rendering for presentations. Samples I Samples II Videos.
Listing the following tasks that support the design, construction control and supervision, execution and maintenance:
1. INITIATION -Traveling to check Field Surveys/Supervises building/sites/spaces assigned. Review and inspect all building and field conditions. Planning, organization and creates survey-measures detailed plans. It creates reports of a field/construction condition. It evaluates estimates, costs, time lines and Capital Project. Works close with Finance. It develops predesign and space planning packages. It creates a Master Schedule with date's phases assuring project delivery on time. It selects qualified General Contractors for bid offering. It prepares qualified bid offering, budgets and variety. It negotiates beneficial terms and prices with contractors.
2. PLANNING Design projects. It provides preliminary concepts and finals Store Design Package (store and fixtures architectural plans in Autocad 2D and 3D renderings). It manages space planning drawings. It sends final packages for approvals. It prepares corporate layouts for client's negotiation. Runs design agreement and approvals for project execution. Checks “Building Code” / provides electrical/ MEP /Air conditioner plans for contractors/bids. Updates meetings with teams and contractors. Following standards and specifications for installation. Frequently, reports have to be sent to teams, contractors and client -locally, Nationally and Internationally. Checks outgoing bids. It resolves hands on every conflict or issue related to the process. Review contract store documents, budgets, construction agreements and local building codes approvals.
3. EXECUTION -Project's Execution and Supervision. Planning and Scheduling projects, Integration, Scope, Time and Execution, Costs, Quality., Resources, Communication, Project Risks and Procurement. Expediting processes on a site between professionals involved, contractors and client. It provides to continue support, reviewing and approving Autocad shop drawings for contractor work and production.·Controls contractors work ensuring work and fabrication follows shop drawings, guidelines and standards. Interchange material samples to the contractor/shop fitter to control quality and specifications. Following up contractor construction trough the different stages of production until is finished (visits, pictures and evaluation). Field staff as partnership collaboration to optimize team's work. Build a close relationship with teams, clients, contractors, management line -strong commitment in shared goals/ in company's benefits. Works in stakeholders, customer satisfaction and company's goals.
4. CONTROL -Construction Coordination and Work process. Checks the contractor followed the complete design and detailed packages. It coordinates and checks contractor execution dates, teams arrival dates and everything is matching for projects finishing purposes. Finance objectives, Budgets and Capital Project control: Review of Capital Project and budget allocated during the process, by project and by client. It meets estimated budget. Check Bid and Award Packages, Requests and Tracking control. Assure a Capital project is closed ready to bill the % partnership to the retailer/clients. It maintains continuous reports, improvements and project ownership.Works in stakeholders, customer satisfaction and company's goals.
5. CLOSING -Project and Installation completed - Project finished. Work supervision for approvals -or not for 10% retained. A punch list for replacements or repairs if it is necessary. Complete Maintenance report and execution for building construction, interiors, fixtures, signs, shelf talkers, communication bands, etc. Closing the work/project and work with finance to collect everything is needed to close the project contracts.
EXPERIENCE
2009 Actually, Project Development and Coordination (short contract): Restaurant-Florida (Intl' Retailer).
5-2007- 11-2008 Architect Design and Project Coordination all Americas (Traveling Retailing International Projects -Americas and Distributor's Local Market Central & Latin America. Project Design Nam/ Central America/ South America/ Mexico & Caribbean/etc. Designer Fragrances and luxury goods brands).
2005-2007 Architect Design Manager, GC D'Catasus co, “Kathie” Stores, Aventura Mall, Gallerias Mall and University Dr. Mall.
05-15-2005 Architect Store/Retail Remodelation, 425 Lenox Ave-M Beach, Tom Valenti G Contractor (retired) Julian Riavec 305-***-****/ Maclee. (Retail and commercial) - Architect, CAD Building Plans, 429 Lenox Ave-M Beach, Tom Valenti GC - J. Riavec 305-***-****/ (Retail, commercial spaces and a Kosher restaurant)
2001 -2004 -Hotel Spa Mall Punta del Este, Arch. R. Berardi (Retail and commercial). --Hotel & Stores Project, Arch. R. Berardi / J Alvarez, Bs As (Retail and commercial) -Restaurant, Bars, Stores Retails Projects “Ribera Este Entertainments”, Bs.As. A Pereyra. (Retail and commercial) http://www.southerndesign.ca/desenchufate/riveraeste/rivera.htm
1997-2001 -Business Architect Project Developer Arthur Andersen BCAA Latin American, Int'l Partner L. Tredicce.
1995-1997 -50 Gasoline Station and Fast food and Stores, International Project “Nueva Imagen de YPF” , Arg, Chile y Peru. A&L GREEN, USA. -Re engineering Project Designer, Control Management, Bid contracts, Bs As.
http://www.geocities.com/hotel4design/riberaeste4.html
http://www.ypf.com/ar_es/productos_y_servicios/default.aspx
http://www.ypf.com/ar_es/productos_y_servicios/servicios/tiendas_full_ypf/ http://findarticles.com/p/articles/mi_m0EIN/is_1995_Dec_15/ai_17867028
1993-1996 -Bank Rio, 23 Stores -Bank Roberts 30 Stores -Maxima FJP Bank Roberts 20 Stores Arch. G Luengo, Bs.As. (Commercial) http://www.arqegl.com.ar/
EDUCATION
-Bachelor Degree National University LP Buenos Aires Argentina
-Postgraduate in Design (EESAE Business & Adm School Madrid)
-State of Florida General Contractor License CGC 1517061 (Project Management-Planning-Scheduling-Contracts-Building Code-Finance-Bids-Awards)
-Accounting I and II MDC for construction
-Actually Applying for PMP certificated -exam (Certified Project Management Professional exam)
-Actually Applying NCARB NCARB #132082
Skills: AUTOCAD 2D architectural/construction plans plus 3D rendering-modeling / Power Point / Word/ Excel/ Accounting I and II MDC for construction, Microsoft Project/ Photoshop/ Safety Site Work/.
*I Negotiated price reductions in the Projects Bids offering out of country contractors reducing up to 35% costs/ Interpreted and corrected finance outstanding billing to the client in $1,500,000 up/ Reorganized all the Design, Bids and Award processes/ Developed and understanding the Local Market and South America operation projects/ Advocated commitment to the brands and their target expansion/ Created constructive procedures to improve the construction plans and presentations/Presented Store Design in 3D for all the store brands and clients' negotiation-presentations.
REFERENCES:
Cindy Mosca Business Manager Estee Lauder co. 954-***-****/ Julian Riavec Maclee 305-***-**** 305. 338.2574/ Carmen Holmes, GC Holmes Builders 305-***-****/ Dwayne Powell, GC DP Construction 786-***-**** / Denis Catasus D'Catasus Construction 305-***-**** Luis A. Tredicce, BearingPoint Inc. Executive vice president, (EMEA) 003********** Madrid
LINKS: Digital Portfolio/ Presentation: video work samples
1- PROJECT EXECUTION
2- INTERNATIONAL PROJECTS
3- PICTURES GALLERY DESIGN AND CONSTRUCTION
4- STORE DESIGN AND PROJECT COORDINATION VIDEO
5- STORE DESIGN VIDEO PRESENTATION
6- RESTAURANTS
6.1 STORE DESIGN RESTAURANT CHAIN -VIDEO PRESENTATION 1
6.2 STORE DESIGN RESTAURANT MED -VIDEO PRESENTATION
6.3 STORE DESIGN-TASCA WINERY RESTAURANT VIDEO PRESENTATION
7- HOTEL DEVELOPMENTS
SEMINARS AND COURSES
-Actually taking PMP certificated exam
-Making job site safety profitable 2009
-Postgraduate Design 2008
-Accounting I MDC - Accounting II for construction MDC 2007
-2007 General Contractor License (Building Code, AIA Contract Documents, Financial Management / Project Management, Labor and Employment, Planning and Organization, OSHA, Construction Accounting, etc) 2007
-Quality, Work Prevention & Environment, Arg. 2005
-Planning efficiency spaces, Arg. 2005
-Accessibility Design For Everybody, (Design/Law ) Arg. 2004
-Marketing for Professionals in Construction Arg. 2004
-Projects Justifications Cost, USA. 1999
Arthur Andersen Management Courses
-Development Management Program -Value Adding Selling- -Integrated Sales - Program Marketing, -Business Writer -Customer Satisfaction -Marketing Products
International Project Coordination
International Projects: http://www.geocities.com/hotel4design/riberaeste2.html
DORIANS RIO ORIGINS & ARAMIS SEPTEMBER 2007
ALDEASA VANCOUVER SHOP 4 EL CL ADF CANADA
HOST MINNEAPOLIS WORLD PASSAGE ESTEE LAUDER G
ALDEASA VANCOUVER DOWNTOWN EL CL ADF
HOST CHARLOTTE ESTEE LAUDER
ALDEASA VANCOUVER SHOP1 LAB SERIES ARAMIS
INTL SHOPS JFK T9 C9 EL & ADF NOVEMBER 2008
ALDEASA VANCOUVER TOM FORD
IOSC INTERBAIRES ARGENTINA MAC STORE APRIL 2008
ALDESASA ATLANTA CORPORATE STORE
BERNABEL URUGUAY ESTEE LAUDER 2008UDE
COLLINS ESPANA PANAMA CITY EL CL ADF
DUFRY RIO BRAZIL MAC
DFA - AMERICAS DUTY FREE DULLES-C&D
INTL SHOPS JKF T1 CORP 12-12-2007
DFS JFK #1230 T4 11-26 2007
JOHN BULL BAHAMAS CORPORATE STORE ALL BRANDS
DFS LAX TIB MAC LOS ANGELES
KIRK FREEPORT GRAND 10TH FEB 2008
DFS TBIT - Los Angeles Airport
FALABELLA MEDELLIN MAC 2008L
DFS HONOLULU GALLERIAS ORIGINS
A RIVIERA "EL TESORO" MEDELLIN COLOMBIA, Brand MAC LA RIVIERA PANAMA
DORIANS RIO TIJUANA MEXICO ORIGINS
La Riviera El Tesoro Medellin COLOMBIA
DUFRY NEWARK MAIN STORE EL CL ADF DEC 15th 2007
LIVERPOOL TIJUANA MEXICO CLINIQUE
DUFRY HOUSTON ESTEE LAUDER
LIVERPOOL LA ISLA MEXICO ALL BRANDS
DUFRY MEXICO #23 EL CL
LIVERPOOL LOS CABOS NEXICO ALL BRANDS
DUFRY HOUSTON AIRPORT EL
LIVERPOOL PLAYA DEL CARMEN ESTEE LAUDER & CLINIQUE
DFS SAN FRANCISCO ALL BRANDS
NUANCE DENVER ESTEE LAUDER CLINIQUE
DUFRY MEXICO #23 MAC OCT 31 2008
NUANCE TORONTO Pier F
DFS HONOLULU ORIGINS NOVEMBER 2007
PENHA CURACAO ESTEE LAUDER & CLINIQUE
FALABELLA SAN DIEGO EL CL COLOMBIA APRIL 2008
PENHA CURACAO CORPORATE STORE ALL BRANDS
SIMAN MIRAFLORES ADF GUATEMALA (MALL)
SIMANS LA GRAN VIA ADF (MALL)
ULTRAFEMME CANCUN PLAZA CARACOL ARAMIS-ESTEE LAUDER
SIMAN GALLERIAS ADF (MALL) SAN SALVADOR
WAKED BOMBIN COPORATE STORE PANAMA
SIMAN METROCENTRO ADF (MALL)