**** **** ***** *********@*****.***
Allen, TX ***02 Cell: 972-***-****
OBJECTIVE To obtain a mechanical design position in which I can utilize my strong background in all phases of sheet metal design and operation.
EDUCATION Graduated from Allen High School, June 1984
Attended Tyler Jr. College 1985-1986, Richland Community College 1986-1987, Collin County Community College 1987-1988
JOB SKILLS
WORK
EXPERIENCE
• Sheet metal design
• Programming: nine years programming CNC Punch Press Machines, using Amada 2D/1E software, Tek-Soft, Metalsoft and Straight G-Code (fanuc) Programming, Fabrawin 8.0
• Familiarity with Telecom specifications and requirements, pertaining to sheet metal structures
• 16000 hours of Pro-E sheet metal , assembly, and drawings
• 4500 hours of Inventor sheet metal , assembly, and drawings
• Create Prints for Production
• Cost estimating
• Cost reduction analysis
• Customer interaction and communication
• Analysis for manufacturability and production
• Punch press operation
• Employee supervision
TELEPRESENCE TECH
PLANO TX
Employment Dates: November 2007 – February 2012
Title: Director of engineering
Responsibilities:
• Design, and manage from concept to manufacturing of
Video conferencing display systems
• Analysis for manufacturability and production
• Cost estimation
• Cost reduction analysis
Notable Achievements:
Developed full line of video conferencing systems ranging from
24”,32”,40”,55”,65”, and 80”.
Logic Design
Dallas, TX
Employment Dates: February 2007 – November 2007
Title: Engineering manager
Responsibilities: manage
• design for customers concepts
• Programming of cnc machines
• Analysis for manufacturability and production
• Cost estimation
• Cost reduction analysis
• Populate ERP for production travelers
Magnetek Inc.
Dallas, TX
Employment Dates: January 2002 – November 2006
Title: Mechanical Engineer
Responsibilities:
• Design sheet metal cabinets, and power chassis for telecom industry
• Programming(fanuc)
• Analysis for manufacturability and production
• Cost estimation
• Cost reduction analysis
• Populate ERP for production travelers
Notable Achievements:
Successfully designed numerous cabinets and distribution boxes of all sizes.
Designed a cell on wheels, including a walk-in enclosure, and trailer
APW Enclosures
Dallas, TX
Employment Dates: September 1999 – December 2001
Title: Product Engineer
Responsibilities:
• Sheet metal design
• Programming
• Use of Telecom specifications and requirements, pertaining to sheet metal structures
• Analysis for manufacturability and production
• Cost estimation
• Cost reduction analysis
• Customer interaction/communication
Notable Achievements:
Successfully saved a previously-failed design of a Power & Battery Cabinet Set, since timeline would not allow a total re-design
H & S Manufacturing
Rowlett, TX
Employment Dates: February 1997 – September 1999
Title: Programmer/Cost Estimator
Responsibilities:
• Programming/Nesting for Amada FMS Systems and Punch Presses
• Cost estimation for build-to-print customers in telecom, defense and aerospace customers
AA Manufacturing
Garland, TX
Employment Dates: October 1991 – February 1997
Title: Punch Press Department Manager
Responsibilities:
• Responsibility for five punch presses, 20 employees, shear, Material procurement
• Management of De-Bur Department
• Management of Tooling Department
Title: Night Shift Supervisor
Responsibilities:
• Supervision of 25 employees
• Responsibility for all departments and various job aspects of manufacturing
Golden Manufacturing
Garland, TX
Employment Dates: June 1989 – April 1991
Title: Shear Operator/Punch Operator
Responsibilities:
• Equipment operation
REFERENCES Upon request