NAVNATH E. GAWAS
Mobile No:+971*********; E-Mail: *********@**********.***
________________________________________
PURPOSE STATEMENT: Seeking Senior level assignments in Quality Operations with a
Reputed organization.
SYNOPSIS
Result oriented professional with over 9 Years across Quality Operations
Hands on experience in shipbuilding (new construction), Site Operations, Fabrication, Erection & Hydro testing of Floating / Cone / Dome Roof type Storage Tanks.
Successfully performed inspection activities like Dimensional Inspection, Fit-Up & Weld Visual Inspection, Painting Inspection, Witnessing Procedure & Welder Qualification Test, Witnessed Pneumatic/Vacuum box testing, Hydro test and various NDT. Preparation & Submission of Final Documentations.
Familiar with AWS d1.1, ASME SEC V, SEC IX, SEC VIII, API 650, API 620, API 1104, ANSI B31.3, B31.4, B31.8 Codes.
Adept at review of drawings, specifications, procedures, welding process, testing methods etc. & maintaining records for compliance with codes & project specifications.
Effectively planning and executing the projects as per design and user requirements.
Understanding of quality parameters and quality systems keeping in mind continuous improvement in the process using various methodologies.
Strong analytical, problem solving & organizational abilities.
EMPLOYMENT HIGHLIGHTS
SEVEN HILLS OILFIELD SERVICES CO. L.L.C. , U.A.E
Project: Third party inspections
Client: ADSB, Ad yard, Lamprell
Period: Feb ’10 till date
ENGINEERING EXPERT GROUP, GOA,INDIA, AS QA/QC INSPECTOR
Project: Third party inspections for Tankers, bulk carriers and oil rigs
Client: ONGC- Mumbai, Indian Oil Corporation ltd., Shipping Corporation of India.
Period: March’09- Jan ‘10
BRIGHT ENGINEEERING (FAS GROUP), SAUDI ARABIA AS A QA/QC INSPECTOR
Project: Was working With Worley Parsons as a sole PMC QA/QC Inspector (Welding) for Sulphuric
Acid Plant in Ma Aden Project, Ras az zawr.Construction of API 650 Tanks(92m dia.) and
Horton Spheres (14m dia.) for Saudi Aramco in Khurais gas Contract.
Client: Saudi Aram co (approved status 1), Hyundai, ACBI, Worley Parsons
Period: March 08 march 09
Job Accountabilities:
Representing as a Client inspector in the Sulphuric Acid Plant Project, for monitoring the Mechanical/Welding activities of the sub-contractor, ensuring the implementations of Codes, Standards and project specifications.
INTERNATIONAL INSPECTION SERVICES (LAMPRELL GROUP), SHARJAH, AS A QA/QC INSPECTOR
Project: Up gradation and refurbishment of Rig Odinstar 655, Rig Gulf 3, Rig Trident, Rig Junana and
Conversion Project of FPSO Vittoria and FPSO Frade
Client: Transocean drilling, National Drilling Company (NDC, UAE), Global Santa fe, Nabors Drilling,
Noble Drilling, Saipem.
Period: Aug’05 to Feb’08
Job Accountabilities:
Representing the client management meetings on behalf of the company for technical clarifications.
Currently looking into operations entailing:
o Controlling the inspectors to carryout inspections and looking into test requirements of the Project.
o Ensuring inspection, measuring, test equipment used in the project including the sub-contractor are calibrated & their status identified, customer complaints related qualities are investigated and necessary corrective and preventive actions are implemented.
o Performing stage wise inspections and QC activities during various stage of construction as per QAP and ITP.
o Reviewing material test certificates for compliance with standards and identifying materials and release for cutting.
o Checking the Filler wire and the respective test certificates.
Coordinating for NDT & Welder qualification as required.
Interacting with the Customer Site Representative / Supervisors for the conduct of day-to-day quality related activities of the project.
Identifying and raising NCR’s for non-conformities.
Responsible for smooth functioning & timely completion of the project.
ENGINEERING EXPERT GROUP, GOA, AS A WELDING INSPECTOR
Project: Third party inspections for Tankers, bulk carriers, above ground storage tanks
Client: ONGC- Mumbai, Indian Oil Corporation ltd., Shipping Corporation of India.
Period: March’04-Aug’05
WESTERN INDIA SHIPYARD LTD. , GOA, as a Junior Engineer, Quality Control Dept.
Project: Repair and construction of Bulk careers, tankers, Dredgers, Transhippers, Tugs and Barges
Client: Oil and Natural gas corporation, Shipping Corporation of India, dredging corporation of
India, Reliance energy
Period: Oct 2002 to Feb 2004
Job Accountabilities:
Instrumental in reviewing material test certificates for compliance with standards and identifying materials and release for cutting.
Interacting with client & contractor for preparation of Inspection and Test Plan, Welding Procedures, and overall project Quality Assurance system.
Monitoring the various quality control and welding activities like receiving inspection, in process and final inspection of the project
Demonstrated abilities in attending Pre-Inspection and Project Inspection meeting with Clients for confirmation of project QA/QC requirements and responsible for maintaining proper records to demonstrate that all the project requirements are met.
Inspecting and reporting of the
Contractors work based on contract document and observations.
incoming goods at site, as well as, the process of erection
Commenced career with Inspection Network, Mumbai as a NDT Inspector
Project: NDT inspection on Storage tanks, coastal vessels and ocean going ships
Client: Dempo Shipyard, Vipul shipyard, Zuari Agro Chemical, Western India Shipyard ltd.
Period: Aug’01 to Oct’02
EDUCATIONAL QUALIFICATIONS
Diploma in Shipbuilding Engg. From ISBT, Goa, India.
PROFESSIONAL CERTIFICATIONS
AWS - Certified Welding Inspector(# 06030771)
NDT Courses LPT, MPT & RT Interpretation
TRAININGS ATTENDED
Operating Systems : Windows 9x/Me/Xp/2000 Professional
CAD Packages : Auto CAD 2004
Productivity Tools : MS-Office 2000
PERSONAL DETAILS
Date of Birth : 27-sept- 1979
Languages known: Konkani, Marathi, Hindi and English
Marital status : Married
Address : Yashodaa Nivaas, H. no. 590, Siddheshwarnagar, Talsai, Borim, Ponda, Goa, India
Availability : One month notice period