Post Job Free
Sign in

Project Engineer / Project Manager

Location:
barnala, PB, 148101, India
Posted:
June 11, 2011

Contact this candidate

Resume:

NAVEEN GARG

Mobile: +601******** ~ E-Mail: r8gixv@r.postjobfree.com

• Project Management • Instrumentation & Control • Maintenance • Installation • Commissioning

SYNOPSIS

Possess over 9.5 years of experience in Commissioning of Instrumentation & Control Systems, Maintenance and Troubleshooting Functions and Team Management for Pulp & Paper Industry. Presently associated with with Sabah Forest Industries Sdn Bhd Sipitang (A subsidiary of BILT & AVANTHA GROUP), Sabah-Malaysia. as Project Engineer – Instrumentation (Paper Power & Pulp). Instrumental in developing plans for the conducting a detailed research on specific areas for further enhancement of the machinery. Successfully handled all the required installation & commissioning of various equipments. Adept at recommending / implementing modifications and equipment calibrations to enhance operational efficiencies of the systems. Headed various assignments for energy saving, cost controlling, waste elimination as well as productivity improvement. Adept at resolving technical issues through root cause analysis and providing technical support to internal customers. Demonstrated analytical, problem solving and organisational ability coupled with strong communication and relationship management.

Key Strengths: Calibration and servicing of process sensors, Transmitters (Smart), Electronic, Pneumatic instruments, MOV, MCV and Pneumatic Control valves; Communicator such as YHC/4100 Series YOKOGAWA ABB, ROSEMOUNT Make; ABB 1190 Accuray QCS at paper machine; Hook up drawings, etc.

CAREER CONTOUR

Presently associated with Sabah Forest Industries Sdn Bhd Sipitang(A subsidiary of BILT & AVANTHA GROUP), Sabah-Malaysia. as Project Engineer – Instrumentation (Paper & Pulp)

Growth Path:

June’10-Till Date Project Engineer – Instrumentation

Projects Going On:

Pulp Sheeting Machine

Power Boiler

ClO2 Plant

Recovery boiler & Evaporator

ABB DCS System 800xA

Turbine 22.5 MW

Mar’09 to May’10 With Bindal Group (Bindal Paper Ltd.), Muzaffar Nagar, (Paper & Pulp)

Growth Path:

Mar’09-Oct’09 Dy. Mgr – Instrumentation

Nov’09-May’10 Mgr – Instrumentation

Projects Executed:

250 TPD Paper Machine

Continuous Digester

Wood Digester

ClO2 Plant

Recovery boiler & Evaporator

Honeywell DCS System C300

Nov’01-Feb’09 with Abhishek Industries Limited, Punjab

Growth Path:

Nov’01-Oct’02 G.E.T. – Instrumentation

Nov’02-Mar’03 Officer – Instrumentation

Apr’03-May’05 Senior Officer – Instrumentation

Jun’05-Feb’09 Executive – Instrumentation

Projects Executed:

2 X 20 MW T.G. Sets

2 X 130 TPH Boilers

275 TPD Writing Printing Paper Machine

180 TPD Straw Pulp Mill

Caustic Recovery Plant

Lime Kiln Plant

120 TPD Writing Printing Paper Machine

9.4 MW T.G. Sets

50 TPH Boilers

Sulphuric Acid Plant & 900 KW Back Pressure Turbine Set.

CORE COMPETENCIES

Project Execution: Involved in project activities involving working out various requirements with respect to Machines, Equipments & manpower; monitoring operations for ensuring timely completion. Managing resources to perform project activities in a cost effective manner. Looking after detailed engineering design and management, submittals, approvals and procurement. Conducting equipment identification, procurement & implementation, vendor development & negotiation. Creating standard report formats for real time and historic reports as per the process/ plant supplier requirement. Generating: P & I drawings as per the plant flow sheets and BOQ for plant instrument erection. Doing technical evaluation of instrumentation related packages for Field instruments, Control valves/ On-off valves, Controller packages (DCS/QCS/ PLC), local field instruments, cables & erection hardware accessories. Attending FAT/ Inspections for DCS panels, Field instruments, control valves, instrumentation cables, control panels.

Instrumentation and Automation: Executing process measurement & control instrumentation & services to optimise manufacturing processes. Configuring and programming of various plant equipments, PLC and single loop controller commissioning. Developing logic flow charts/ interlock diagrams as per requirement of process operation & client feedback. Assessing the electrical / general arrangement diagram for control panel/PLC panel for the commissioning of pith press machine. Executing the configuring and testing of process specific interlocks; testing control panel logic, PLC logic. Generating & testing function blocks/ control strategies; carrying out all arithmetic calculations/ Algorithms.

Maintenance Operations: Forecasting & formulating O & M budgets and overseeing predictive, preventive and breakdown maintenance of machines. Scheduling and planning predictive, preventive and breakdown maintenance jobs with key focus on spares availability and root cause analysis. Preparing maintenance plans/schedules for reducing machinery downtime ensuring smooth production.

Process Enhancement: Planning, implementing & monitoring of technological changes to enhance productivity. Modifications in equipments, process flow, working practices, consumables, power, etc. for controlling & reducing conversion cost per unit produced.

Installation & Commissioning: Installation and commissioning of the heavy equipments as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities. Reviewing engineering drawings, layouts, diagrams, technical specifications, cost estimates for erection & commission of the plant; reviewing & analyzing contractor's change order proposals & submittals.

Team Management: Directing, leading & motivating workforce and imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency. Working on succession planning of the workforce, shift management activities, appraising the member’s performance & providing feedback to the queries.

Knowledge Purview

Erecting & commissioning: Paper Machine, Pulp Mill viz., Continuous Digester, Wood digester, ClO2 Plant, O2 Plant, Recovery Boiler, Evaporator, & Lime Kiln), Husk Boiler and Turbine.

Maintenance & Operation:

- Paper Machine Area: 120 TPD writing and printing paper machine, pulp mill, stock preparation & finishing house.

- Cogeneration Plant: 60 TPH Water tube type husk fired boiler & 9.4 MW extraction control steam turbine.

- Chemical Recovery & Evaporator Unit: 22 TPH water tube type black liquor fire boiler.

- Sulphuric Acid Plant: Sulphuric Acid plant & 900 kw back pressure turbine set.

Miscellaneous:

- QCS system (ABB 1190 Accuray System)

- DCS System (ABB Master Piece & Master View)

- ADVANT System

- Consistency Control Loops

- Hydraulic & Pneumatic Control Loops

- Magnetic Flow Tubes

- Steam Control System of Dryer System

- Control Valves (Electro-pneumatic, Hydraulic, Electric Actuator)

- Elsag Bailey Freelance 2000 System

- Loops & Relay Logic Controls of Turbine System

- Turbine Hydro Electric Control Valve For L.P & H.P valves of Turbine

- Cascade Loops of Boiler

- 3 Element Control Loops of Power Boiler

- Programming & display Designing of Freelance System

- Programming and Control of Woodward 505 E Turbine Controller

- Woodward CPC Converters.

Undertaking erection & commissioning activities of DCS system (C300 , Make- Honeywell); 800 xA System make ABB, PLC 7400 make SIEMENS and 800 F System make ABB

SKILL ENHANCING SCHEDULES

Actively participated in:

Kaizen Program

5s Activities

ISO: 9000 & 18000 Documentation

TPM & TQM Initiatives

Six Sigma (Yellow Belt)

ACADEMIA

Year 1997-2001 Bachelors in Technology (Electronics & Communication Engineering) from BBSEB, Fateh Garh Sahib (PTU, Jalandhar).

PERSONAL DOSSIER

Date of Birth : 12th May, 1980

Residential Address : H.No. B-XII/265, Street No.2, Opposite New Courts, Barnala-148101, District: Barnala, Punjab



Contact this candidate