Gary Casteel
Mobile,Alabama **608
*************@***.***
Objective:
Looking to get with a stable company where the work is steady and offers the oppertunity to learn more about the industry Ive come to love being a part of
Summary:
Multi Skilled Craftsmen who has about 16years in the buisness...I love to work and learn as much as I can and am willing to tell you up front what I can and cannot(have not) do or done.......I believe honesty is the best policy.
Accomplishments:
Training
NCCER Millwright
NCCER Boilermaker
ABC Certified Millwright(Thru the Union years ago)
Experience: Fluor Daniels Ghent Kentuckey
Millwright 11/08 to 3/09
· Installed machinery and equipment according to layout plans, blueprints and other drawings in industrial establishment..
· Used hoists, lift trucks, handtools and power tools.
· Read blueprints and schematic drawings to determine work procedures.
· Was instrumental in performing all needed allignments useing dial indicators as well as opti lign equipment
· Dismantled machines, using hammers, wrenches, crowbars and other handtools.
· Moved machinery and equipment, using hoists, dollies, rollers and trucks.
· Trained various apprentices on general tasks and responsibilitys
· Assembled and installed equipment, such as shafting, conveyors and tram rails..
· Constructed foundation for machines, using handtools and building materials, such as wood, cement and steel..
· Aligned machines and equipment, using hoists, jacks, handtools, squares, rules, micrometers and plumb bobs.
· Assembled machines and bolted, welded, riveted and otherwise fastened them to foundation and other structures.
· Successfully handled all phases of pre alignment,and final alignment responsibilities.
· Operated engine lathe to grind, file and turn machine parts to dimensional specifications.
· Repaired and lubricated machines and equipment..
· Performed installation and maintenance work as part of team of skilled trades workers.
.
Dii New Iberia Louisiana
Millwright 2/07 to 11/08
Removed/Re-installed gear box's, chain drives, compressors,hydraulic systems,instrument air,water chill systems,fuel pipeing,as well as new pipe systems..
Allignments on motors ands pumps
Shot elevations,installing new sole plates,and new pump bases
Welded pipe as well as structure
Fit pipe as acccording to blue prints
drilled and tapped wholesand prepped machine surfaces
provided all PM work and handled all delivery and installation of equipment
Pulled and re installed new chain drives,coupling's,hubs
Monitered readings on shaft,impellers,ect
Hydro tested pipeing after welding and fitting
Teton Industrial Plaquemine Louisiana
Millwright 3/06 to 2/07
Installed new mechanical seals
Alligned and installed new motors and pumps
Built pipe supports,structural supports for decking
welded hand rails as well as brackets
Pulled couplings and replaced packing in goulds pumps
repaired tubes in preheater and installed Atlas Copco Compressor
Replaced sheeves and performed allignments
Poured grout as well as framed up forms
Set pump bases,installed racks....
Shimmed Siemens motor as well as alligned to compressor
CBI La Place Louisiana
NCCER Boilermaker 3/05 to 3/06
Was responsible for Hydro crew
walked down lines,assured lockout/tagout was being performed...
Built hydro test trees
Installed exchangers,heaters, and set pipe on coordinances
Hy torque flanges, fabricate skillets,layout and cut to fit
Worked on reactors, dispensing and removeing catalyst,as well as structural fit on tanks in tank farm
rebuilt valves, replaced packings,and worn nout assembly on gate,globe,ball,ect
Ran steam trace lines and installed control valves as well as rebuilt burners and boiler feed pumps.
Worked on precipitaters,dehumidifiers,baghouses,economizers
Rolled tubes,cut sheets, gouged,grinded,complete tear out and revamp of inside of boiler..
Zachry Construction various
Millwright-Boilermaker 2/04 to 3/05
Complete rebuild of burners for Unit's 2-5 .
Structural weld as well as fabricate and fit skin caseings, and boiler internals
Worked on digesters,precipt's,coal fuel pipeing,ball mills,ash conveyers,as well as burners.
Fit and installed pipeing for all sytems as well as performed allignments on conveyers and bowl mill pulverizers
Completely rehauled bowl mills, replaceing exhaust fans as well....
Installed Id fans and there duct work
Turner Industries Pascagoula Mississippi
Millwright 8/01 to 2/04
redmoved and replaced drive motors for various sections of the plant. Installed new turbine/compressor
Performed various allignments on motors
Rebuilt valves,installed tubeing,general maintenance on all rotateing equipment
Rigging as well as layout
drilling and tapping of holes as well as in new bases and plates
Becon Construction various
Boilermaker 6/00 to 8/01
Education: API Pipe Inspection Course Napa California
cert 1993
Rigging School Mobile Alabama
cert 2004
JLG Training Texas
cert various years
Hy torque Mobile
cert 1994
Turbine Training Mobile
cert 1992
Opti Lign Course Mobile
cert 1998
CPR Mobile
cert 2007
Fresh Air Pascagoula
cert 2008
License:
NCCER Certified Journeyman Millwright
NCCER Certified Journeyman Boilermaker
ABC Certified Union Millwright Journeyman Card
Hy-Torque Certified
ITH Bolt Training.
Certified Hydo-test
Affiliations:
Security:
OSHA-10 Card
SAFETY COUNCIL-Current
Criminal Background Check Current