PERSONAL DATA :
Name : Doddy Dharma
Date of Birth : January 09th 1980
Marital Status : Married
Nationality : Indonesian
Address : Perumnas Griya Sagulung Blok E No.35 Batam
Email : ******.******@*****.**.**
Phone : +628**********
Passport No : V358537
PROFILE
I had been working more than 4 (four) years in Construction Field Fabrication for Industries, Power Plant, Oil & Gas Project.
PROFESSIONAL EXPERIENCE
1. Company : PT. McConnell Dowell Service
Project : Singapore Parallel Train Project (PARS/SBRS),
Location : PT. McConnell Dowell Batam
Tlp. +65 6543 1366 (Mr. Kenneth Chun / Allan Abella)
Tlp. 0778 – 391989 (Mr. Anom)
Period : April 01, 2009 to May 15, 2010
Position : QC Inspector
Responsibility : Checking pipe fitting before fabrication and erection. Visual welding, checking color coding, schedule thickness, rating and heat number of material. Line check, punch list and witness hydrotest.
2. Company : PT. McConnell Dowell Service
Project & Location : Singapore Parallel Train Project (PARS/SBRS),
Location : PT. McConnell Dowell Batam
Tlp. 0778 – 391989 (Mr. Anom)
Period : June 01, 2008 to April 01, 2009
Position : Piping / Structure Material Control
Reason for Leaving : Transferred to the QC Inspector
Responsibility : Checking material structure / pipe fitting before fabrication schedule thickness, rating and heat number of material.
3. Company : PT. TENG PO HUAT ENGINEERING
Project : Jack Up Drilling and Service Jack
Location : Drydocks World Graha Batam Indonesia
Tlp. 081********* (Mr. Yopi)
Period : November 15, 2007 to March 01, 2008
Position : QC Inspector
Reason for Leaving : Job Completed
Responsibility : Checking pipe fitting before fabrication and erection. Visual welding, checking color coding, schedule thickness, rating and heat number of material. Line check, punch list and witness hydro testing.
4. Company : PT. Bina Riau Cemerlang
PT. McConnell Dowell Indonesia
Project : PT. Rapp pec Tech Indonesia Fibber Line
Location : Pangkalan Kerinci Pekanbaru Riau
Tlp. 0761 – 861841 / 0765 – 93911 (Mr. Akmal)
Period : February 03, 2007 to May 31, 2007
Position : Material Control
Reason for Leaving : Job Completed
Responsibility : Checking material structure / pipe fitting before fabrication schedule thickness, rating and heat number of material.
5. Company : PT. Truba Jurong
Project : SM-2 Project. PT. Styrindo Mono Indonesia
Location : Ds. Mangunreja Kec. Bojonegara West Java
Tlp. 021 – 7803300 (Mr. Freddy Maulana)
Period : July 24, 1998 to December 01, 2000
Position : Material Control
Reason for Leaving : Job completed
Responsibility : Checking pipe fitting before fabrication and erection. Schedule thickness, rating and heat number of material.
6. Company : Drydocks World Graha
Project : Jack Up Drilling Rig, Jack Up Barge and Service Jack
Location : Jl. Brigjen Katamso Tanjung Uncang
Batam Island Indonesia
Period : Aug 09, 2010 to Oct 10, 2011
Position : QC Piping Inspector
Reason for Leaving : Job completed
Responsibility : Checking pipe fitting before fabrication and erection. Visual welding, checking color coding, schedule thickness, rating and heat number of material. Line check, punch list and witness hydro testing.
7. Company : PT. McConnell Dowell Indonesia
Project : Martabe Gold Mining
Location : Padang Sidempuan North Sumatra Indonesia
Period : Oct 27, 2011 to June 10, 2012
Position : QC Structure Inspector
Responsibility : Checking bolt and nut before tightening and erection.Visual welding, heat number of material and punch list.
SKILL
● Microsoft Office program (Word, .Excel and Power Point)
● Good Communication in English
● Fast Learner
EDUCATION
• Senior High School STM PGRI Kab. Serang West Java Certificated 1998
• Junior High School SMP Negeri I Bojonegara – Cilegon West Java Certificated 1995
• Elementary School SDN No.12 Cilegon West Java Certificated 1992
• IINDT Certified Welding Inspector Period 12 June – 22 Dec 2008
I hereby certify that all the information contains herein is true and correct to the best of my knowledge and belief.
Yours Faithfully,
DODDY DHARMA