Dai C. Ly 919-***-**** r1iy53@r.postjobfree.com
OBJECTIVE: Automation/Process Controls Engineering
EDUCATION: California State Polytechnic University, Pomona
• Bachelor of Science EE, 93 • Engineer-In-Training, 95
• PMP Certification (future)
SKILLSET:
Hardware: Emerson Control System, ABB Control System, Allen-Bradley Logic Controllers
Software: DeltaV, 800xA, Windows, Unix, VB/VBA, C/C++, Assembly Language, AutoCad, Excel, SQL, OSI PI, RSLogix, ControlLogix, Crystal Reports, GE iFIX, Siemens Step 7, LabWindows/CVI, LabView.
Protocols: TCP/IP, DH+, DF1, RS-232, RS-485, RS-422, Fieldbus, Profibus (DP & PA)
Relevance: cGxP, Commissioning Qualification/Validation, SDLC, S88, GAMP.
EXPERIENCE:
Mar. 08 – present: Automation Engineer @ North Carolina State University, Raleigh, NC
Biotechnology Training and Education Campus
• ABB, AB & Sartorius systems owner/administration
• Coordinate design, programming & recipe design of automation controls (ABB 800xA, AB controllers, Sartorius DCU/MFCS) for Biotechnology teaching facility.
• ABB PAT configuration chemometric modelling assistance
• Design Automation training courses.
Mar. 06 – Feb. 08: Sr. Sys/IC Engineer @ Wyeth Biotech, Sanford, NC
Train 1 and Full-Scale-Development Facility
• Process optimization (CIP, SIP, production)
• MES/eBR project automation lead for Sanford site.
• PAT Team exploration for process improvement.
• FAT for automation.
• Deactivation System code modification.
• Database administration: planning of Disaster Recovery procedure, back-up procedures for Automation/Control Systems (Delta-V, PLC, HMI, OSI PI, SCADA).
• 24/7 PCS DeltaV, PLC, SCADA support for manufacturing facility.
Feb. 05 – Feb. 06: Contract Automation engineer @ Bristol Myers-Squibb, New Jersey for Kelly Engineering Services
Oral Solid Dose, Sterile Formulation, Long Term Stability, Process Technology Project (Scale-Up Manufacturing)
• Review equipment electrical drawings and P&ID’s, control system FDS, DDS, Qualification documents, hardware drawings, loop sheets, panel wiring drawings
• Delta-V – 3rd party communication interface configuration.
• Startup, commissioning, troubleshooting/resolution, loop checks (Siemens Simatic S7-300, Allen Bradley SLC & PLC)
• PAT Technology Interface
Mar. 99 – Dec. 05 : Controls Engineer @ Abbott Laboratories / Hospira, Illinois
AllPax Sterilizer project (Hospira)
• Design/modification of sterilizer controls (ControlLogix, VB & Crystal Reports codes, database modifications/enhancements, control strategies enhancements).
• Analysis & troubleshooting of instrumentation/electrical problems.
• I/O integrity testing, verification & modification.
• Verify/modify electrical diagrams and P&ID as appropriate.
• Provide leadership via supervision & coordination of direct contract personnel on validation efforts, and supervision of technician on calibration/maintenance issues.
• Generation, approval of validation protocols and SOP & validate the sterilizer system including associated software (equipment/software).
• Capital project (RCE for capital & expense expenditures) & project schedule development on the next sterilizer.
MES project
• Design/modification of MES Qualification Verification Module to the MES project.
• Work with programmer to define end-user work-flow.
• Generation, approval of validation protocols and SOP. Validation of the MES QV module.
SPC project
• Capital project (RCE for capital & expense expenditures) & project schedule development.
• Specification design, plan, procure and install/integrate SPC software & HMI/hardware for the Diagnostic Fill & Label manufacturing lines.
• Provide leadership via supervision & coordination of direct contract personnel on equipment creation efforts.
• Project validation/qualification planning.
Fill & Label Line #14 project (Diagnostic products)
• Coordinate & oversee removal & reinstallation of Line #14 for HEPA & floor replacement.
• Design/modification of PLC & HMI.
• Generation, approval of qualification & validation protocols including SOPs. Validate the Diagnostic Fill & Label equipment/softwares.
Zebra software project (Diagnostic products)
• Design/modification of application for label printing system.
• Analyze & trouble-shoot software problems.
• Generation, approval of validation protocols and SOP & validate the sterilizer system including associated software (equipment/software).
• Coordinate the installation of new software at impacted manufacturing sites.
Legacy label replacement software project (Diagnostic products)
• Cost & project timeline projection planning with manufacturing.
• Design application HMI & Zebra printing system.
• Generation, approval of validation protocols and SOP & validate the sterilizer system including associated software (equipment/software).
• Coordinate the installation of new label printing system in manufacturing.
Fermentation Recovery Controls (API production)
• Day-to-day production site support (Provox, DeltaV/AB PLC) including analysing & trouble-shooting DCS and related hardware (instrumentation, DCS hardware, DCS software), maintenance & upgrading.
• Project support including validation.
• Work in a team to help develop/apply replacement Historian software for DCS including Historian Operator interface using a third-party software (OSI PI).
• Design DeltaV system for the Ozonation System in Fermentation.
• DeltaV upgrade/migration planning.
Sep. 97 – Mar 99 : Instrument Engineer at Saudi Arabia Parsons Limited, Saudi Arabia
Kemya Polyethylene Controls project
• Control room materials (annunciators, push-buttons, Honeywell TDC-3000) specification.
• P&ID review/redline.
• InTools database analysis for correctness & accuracy of data.
• VB Access/SQL programming; database management
SHEDGUM GOSP-1 upgrade project (Construction Site)
• Assist setting up network hardware for ABB DCS.
• Setting up FISHER Interchanger/Multiplexer hardware/software communication to local PC with VALVELINK software.
• Check, test & verify instrumentation prior to installation and service.
• Assist in checking ILD and P&ID redesign package for correctness.
• Assist & supervise loop checking & trouble-shooting during pre-shutdown and during plant shutdown duration.
• Control valve smart positioner calibration using the HART Hand-held calibrator.
• Verify the correct installation, hook-up, calibration and testing of instruments.
KHUFF GAS Project (Construction Site)
• Review design reports of contractors for compliance to Saudi Aramco standards & sound design practice.
• Review & approve vendor packages for H2S detection system.
• Upgrade & maintain company computers hardware/software for company use.
• Help install and upgrade network server/client software from Novell & WFW 3.11 to Windows NT & Windows 95.
Mar. - Sep. 97 : Process Control Systems Engineer at Kinetics Technology International, San Dimas
500 tpd Ammonia Plant Project
• Responsible for maintaining the integrity and the currentness of the Master database for the DCS aspect of the project, including regular back-up of database.
• Configuration of DCS system and the interface between PROVOX system with various vendors including TriConex, SKF, Alen-Bradley PLC.
• Assist in designing and implementing various logic controls for the plant including the Emergency Shutdown System.
• Assist programming and implementing G2 Expert System and Neural Net.
• VB Access/SQL programming; database management
Jan. 95 - Mar. 97: Process Control Systems Engineer at Fisher-Rosemount Systems, Austin
ABQAIQ Project
• Implement and test continuous process control systems strategies using PROVOX.
• Convert Relay Ladder Logic (RLL) to SAMA Diagrams and FST code within DCS.
• Provide maintenance support of the Relational & Open Database.
• Interface various software packages to DCS including Data Historian, CHIP, CHIP-TO-CHIP
• Design and implement plants alarm system for 10 DCS to work together.
• Trouble-shoot and fix hardware DCS hardware/software problems.
• VB Access/SQL programming; database management
Oct. 93 - Dec. 95 : Technical Support at Pacific Image Communications for software product (SuperVoice & SuperFax.)
Apr. 92 - Sep. 92 : Field Engineer and member of a pump project of Fisher Controls, Monrovia for Ralph M. Parsons and ARAMCO.
GOSP & WIP Project
• Configure, modify and test the Programmable Controller Interface Unit (PCIU) using PROVOXplus system, help maintain Relational & Open Database.
• Configure, modify and test the Configurable Serial Interface (CSI) using PROVOXplus system. Configure & interface DCS with TriConex TMR system. Test & troubleshoot ProVox DCS system.
• Provide support in various Gas & Oil Separation Plant (GOSP) system configuration.