Post Job Free

Resume

Sign in

Project Technician

Location:
Franklin, LA, 70538
Salary:
25hr
Posted:
April 27, 2012

Contact this candidate

Resume:

Byron Marshall

P. O. Box ***

Franklin, LA *****

Email: r0bwhu@r.postjobfree.com

337-***-****

Summary

I would like to broaden my potential with the experiences that I have attained in my working career. I come with a wide range of experiences from different walks of life and hope to not only share them with your company, but help bring your organization to higher successful goals and achievements.

Professional Experience

Custom Automation Control Jan 2012 - Mar 2012

Electrician

Installing conduit and plastic bond underground; Wiring transmitters and level switches; Running and wiring heat traces; Installing cable tray; Wiring HOA.

KBR July 2011 – Jan 2012

Laborer Foreman

B1 Site, APO, AE Alsad, Iraq

Assists the General Foreman by providing input to identify key success factors for Labor Crew. Provides leadership to cause the creation of organizational structure and process required to fully execute the requirement of services and is responsible for the execution of Labor Services, quality, subcontractor performance, and construction cost. Evaluates Labor Service execution for compliance to contract, design data, schedule, cost budgets, and quality, advising the project team of status, issues, impacts, risk, and cost influence factors on “to go” scope. Maintains the short range look ahead plans and discusses all deviations with the General Foreman. Reviews and monitors cost and man-hours budget for installation process, develops an equipment and tool requirement plan, and reviews it with the General Foreman.

IES (Integrated Electrical Service) Houston, Texas April 2011- May-2011

Electrician

Project Motiva Gas Plant, Port Authur, Texas

Installing cable tray, running conduit, wiring transmitters, pumps, motors, and main breaker panel

Ardent Services, Project ENI Houma, Louisiana Sept 2009 – Mar 2010

Electrician

Responsible for installing fire and gas devices, running cable tray, wiring transmitters, pumps and motors.

Shell Perdido Project Aransas Pass, Texas Topside (MMR) Oct 2008 – May 2009

Electrician (member of the “Tiger Team”)

Responsible for working in the MCC, commissioning with DSI, wiring Switchgears, UPS, CPV, VFD and Vibration monitor. Working with 6.9 high voltage load banks for the Switchgears in the MCC. Wiring 5KV high voltage with stress cone inside the Transformer and Switchgear.

BP Amoco Thunderhorse Project (Prime Electrical Company) May 2008- Oct 2008

Electrician

Responsible for installing and glanding cables on a skid; Troubleshooting equipment at several gas plants in Texas and Louisiana. Running tray and bending conduit on several projects, Hookup transmitters, pumps, and transformers for Colombia Gulf Oil & Gas;

Chevron BANZALA Project Angola (Dynamic Industry) Luanda, Angola Africa Mar 2007 to May 2007

Electrician

Deployed to Africa. Responsible for installing and glanding connectors and terminating PLC Panel, MC Panel, Battery Charger. Working with commission crew megging and labeling cables. Installing H2S Detectors, Gas Detectors, and Lighting on Banzala B and C Platform.

Chevron BANZALA Project Angola, Africa (Dynamic Industry) Port of Iberia Jan 2006 to Dec 2006

Apprentice Electrician

Responsible for installing cable tray, installing cable to generators, Clx cable, pump, skids, light fixture, horn battery charge and cable to master control panel. Performing engineering work of various types in the design or redesign. Manufacturing and installing operation, or maintenance of electronic and electromagnetic systems or equipment. Research techniques to analyze and validate design or theory concepts.

Chevron Tunisia, Africa (Omega Natchez) High Island ASC, Port of Iberia Apr 2005 to Dec2005

Apprentice Electrician / Instrumentation Helper (Mp Zarat}

Installing cable to generators, cable tray, light fixtures, terminating lights and junction box, Clx cables this duties include working on and off land. Wiring pressure and temperature transmitters, field view devices, junction boxes and shutdown valves.

(BLUEWATER Platform (UTP Oil & Gas) Sabine Pass, Texas

Electric Technician

Maintained and installed well-head panel, tubing, regulators, tubing tray for ESD panel, instrument helper assisting on checking point to point on all instruments, powering and termination of devices. Worked on inputting the necessary equipment to the MCC building.

(SHIP SHOAL 332 Platform) (El Paso Oil & Gas) Dynamic Industry June 2004 to Mar 2005

Electrician Technician

Installed Light and Junction box, Clx Cable, Light fixture, tubing regulators, cable tray, pulling cable All duties on and off shore land, Checking of function on newly installed equipment and structure to evaluate system performance under actual operating conditions. Installing and maintenance of variety of instrument devices on the MCC Building.

UNIFAB (Dynamic Division) Aug 2001 to May 2004

Worked on project called (BOISE CANS for BP AMOCO DEEP WATER) Port of Iberia

Fitter Helper

Duties included Tack welder, cutting and grinding, pull measurements and general labor

Education

Franklin SR High –88

Franklin, LA

University Of Louisiana (USL)

Lafayette, LA

Summer -19 88

Fall -1990 Criminal Justice



Contact this candidate